Notification of Browns Ferry Nuclear Plant Component Design Bases Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000259/2015007, 05000260/2015007 and 05000296/2015007
ML15231A030
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/13/2015
From: Bartley J
NRC/RGN-II/DRS/EB1
To: James Shea
Tennessee Valley Authority
References
IR 2015007
Download: ML15231A030 (6)


See also: IR 05000259/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

August 13, 2015

Mr. Joseph W. Shea

Vice President, Nuclear Licensing

Tennessee Valley Authority

1101 Market Street, LP 3D-C

Chattanooga, TN 37402-2801

SUBJECT: NOTIFICATION OF BROWNS FERRY NUCLEAR PLANT COMPONENT DESIGN

BASES INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION

INSPECTION REPORT 05000259/2015007, 05000260/2015007, AND

05000296/2015007

Dear Mr. Shea:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection (CDBI) at your Browns Ferry

Nuclear Plant during the weeks of November 30 - December 4 and December 14 - 18, 2015.

Mr. Wesley Deschaine, the Resident Inspector from the NRCs Sequoyah office, will lead the

inspection team. This inspection will be a pilot to test the feasibility of conducting a two-week

CDBI. The inspection will be conducted in accordance with Inspection Procedure 71111.21T,

Component Design Bases Inspection (Teams), which will be issued at future date. The

inspection procedure is in the NRCs Agency Documents Access and Management System

(ADAMS) as #ML15154A586.

The inspection will evaluate the capability of risk-significant /low-margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a telephone conversation on August 4, 2015, the staff confirmed with Mr. J. Paul of your

staff, arrangements for an information-gathering site visit and the two-week onsite inspection.

The schedule is as follows:

  • Information-gathering visit: Week of October 19 - 23, 2015
  • Onsite weeks: November 30 - December 4 and December 14 - 18, 2015

The purpose of the information-gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. Wesley Deschaine, the Sequoyah Nuclear

Plant Resident Inspector, will be conducting all preparation activities associated with the

inspection. In addition, Mr. Rudolph Bernhard, a Region II Senior Risk Analyst, will support

Mr. Deschaine during the information-gathering visit to review probabilistic risk assessment data

and identify risk-significant components, which will be examined during the inspection.

J. Shea 2

The enclosure lists documents that will be needed prior to the information-gathering visit.

Please provide the referenced information to the Region II Office by October 5, 2015. Additional

documents may be requested during the information-gathering visit. The inspectors will try to

minimize your administrative burden by specifically identifying only those documents required

for inspection preparation. The additional information will need to be available to the team in the

Region II office prior to the inspection teams preparation week of November 16, 2015. During

the information-gathering trip, Mr. Deschaine will also discuss the following inspection support

administrative details: (1) availability of knowledgeable plant engineering and licensing

personnel to serve as points of contact during the inspection, (2) method of tracking inspector

requests during the inspection, (3) licensee computer access, (4) working space,

(5) arrangements for site access, and (6) other applicable information.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions, regarding the

information requested or the inspection, please contact Mr. Deschaine at 423-842-8001 or

contact me at 404-997-4607.

Sincerely,

/RA/

Jonathan H. Bartley, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-259, 50-260, 50-296

License Nos.: DPR-33, DPR-52, DPR-68

Enclosure:

Information Request for Browns Ferry Nuclear Plant,

Component Design Bases Inspection

cc: Distribution via Listserv

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRP RII:DRS

SIGNATURE Via email WXD1 JHB1

NAME WDESCHAINE JBARTLEY

DATE 8/13/2015 8/13/2015 8/ /2015 8/ /2015 8/ /2015 8/ /2015 8/ /2015

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

INFORMATION REQUEST FOR BROWNS FERRY NUCLEAR PLANT

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM (or FTP site, SharePoint, etc.). The CDROM (or website) should be indexed and

hyperlinked to facilitate ease of use.

1. From your most recent probabilistic safety analysis (PSA) excluding external events and

fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by Risk

Achievement Worth (RAW), and the other sorted by Birnbaum Importance

b. A list of the top 500 cutsets

c. A list of the top 500 LERF contributors

2. From your most recent PSA including external events and fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by RAW,

and the other sorted by Birnbaum Importance

b. A list of the top 500 cutsets

3. Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide

human reliability worksheets for these items.

4. List of time-critical operator actions with a brief description of each action.

5. List of Emergency and Abnormal Operating Procedures revised (significant) since

April 19, 2013, with a brief description of each revision.

6. List of components with low-design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design-required output, heat exchangers close to

rated design heat removal, and motor-operated valve risk-margin rankings, etc.).

7. List of station-operating experience evaluations/reviews performed, and documented in the

stations corrective action program, for industry events and safety-related equipment

failures/vulnerabilities (as communicated by NRC Generic Communications, Industry

Communications, 10 CFR Part 21 Notifications, etc.) since April 19, 2013.

8. List and brief description of safety-related structures, systems, or components (SSCs)

design modifications implemented since April 19, 2013.

9. List and brief description of common-cause component failures that have occurred

since April 19, 2013.

Enclosure

2

10. List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list, and summaries (if

available) of your plans to address the issue(s).

11. List and brief description of equipment currently in degraded or nonconforming status as

described in NRC Inspection Manual Chapter 0326, Operability Determinations and

Functionality Assessments for Conditions Adverse to Quality or Safety, issued

January 31, 2014.

12. List and reason for equipment classified in maintenance rule (a)(1) status from

April 19, 2013, to present.

13. Copy of Updated Final Safety Analysis Report.

14. Copy of Technical Specification(s).

15. Copy of Technical Specifications Bases.

16. Copy of Technical Requirements Manual(s).

17. List and brief description of Root Cause Evaluations performed since April 19, 2013.

18. Corrective Action Program Procedure(s).

19. Copy of Operability Determination procedure(s).

20. One-line diagram of electrical plant. (Electronic and full size - hard copy week

of October 19 - 23, 2015)

21. Index and legend for electrical plant one-line diagrams.

22. Piping and instrumentation diagrams (P&IDs) for safety-related systems. (Electronic

and 1/2 size - hard copy week of October 19 - 23, 2015)

23. Index and Legend for P&IDs.

24. Copies of corrective action documents (i.e. CRs) associated with findings from previous

CDBI. (If applicable)

25. Index (procedure number, title, and current revision) of station Emergency Operating

Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures.

26. Copy of any self-assessments performed in preparation for this inspection.

27. Copy of the self-assessment performed in preparation for the last CDBI.

28. List of any condition reports generated in preparation for this inspection.

3

29. Copies of condition reports generated from previous CDBI (2013).

30. Contact information for a person to discuss PSA information prior to and during the

information-gathering trip. (Name, title, phone number, and e-mail address)