ML15211A510
From kanterella
Jump to navigation
Jump to search
ML15211A510 | |
Person / Time | |
---|---|
Site: | Humboldt Bay |
Issue date: | 08/12/2003 |
From: | Compas L, Maniery M PAR Environmental Services |
To: | NRC/NMSS/FCSS, Pacific Gas & Electric Co |
Shared Package | |
ML15208A246 | List: |
References | |
Download: ML15211A510 (64) | |
Similar Documents at Humboldt Bay | |
---|---|
Category:Report
MONTHYEARML18100A0142018-04-0404 April 2018
[Table view]Submittal of Independent Confirmatory Survey Summary and Results for Survey Units OOL10-14 and NOL01-09 ML21165A1172018-02-0606 February 2018 NX-503 Rev 0 Part 2 HBL-17-003, License Termination Plan Technical Basis Documents2017-07-0606 July 2017 License Termination Plan Technical Basis Documents HBL-14-017, Independent Spent Fuel Storage Installation Humboldt Bay Quality Assurance Plan Proposed Changes2014-06-10010 June 2014 Independent Spent Fuel Storage Installation Humboldt Bay Quality Assurance Plan Proposed Changes ML15210A7352014-02-28028 February 2014 Cultural Resources Monitoring Report No. 1, 08/2010 - 08/2013 DCL-13-094, and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask2013-09-30030 September 2013 and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask ML14128A3952013-08-31031 August 2013 Cultural Resources Monitoring Report & Recommendations, Humboldt Bay Power Plant Decommissioning, Humboldt County, California ML15211A5142013-08-31031 August 2013 Cultural Resources Monitoring Report and Recommendations ML14177A2802013-07-31031 July 2013 Preliminary Wetland Delineation for the PG&E Humboldt Bay Power Plant Canal Remediation Project, Humboldt County California, Dated July 2013 HBL-13-002, Post-Shutdown Decommissioning Activities Report, Revision 42013-07-19019 July 2013 Post-Shutdown Decommissioning Activities Report, Revision 4 ML15211A5062013-07-15015 July 2013 Cultural Resources Inventory and Evaluation ML14177A2822013-07-15015 July 2013 Cultural Resources Inventory and Evaluation, Humboldt Bay Power Plant Decommissioning, Canal Remediation Project, Humboldt County, California, Dated July 15, 2013 ML13130A0092013-05-0303 May 2013 License Termination Plan, Revision 0, Evaluation Through Chapter 2 Site Characterization - East Side Site ML13130A0112013-05-0303 May 2013 License Termination Plan, Revision 0, Chapter 2 - Site Characterization, Appendix 2-C Hbpp Groundwater Monitoring Summary Through Chapter 6 Compliance with the Radiological Criteria for License Termination ML14128A3692012-10-0101 October 2012 Caisson Removal Feasibility Study Hundred Percent Draft Feasibility Report ML13130A1402012-09-26026 September 2012 in Situ Object Counting System (Isocs) as Applied to Scan Requirements in Support of Final Status Survey at Hbpp ML13130A1372012-07-11011 July 2012 Gross Activity Dcgl in Support of the Final Status Survey at Hbpp ML14128A1132012-06-28028 June 2012 Report - Decommissioning Capstone Document ML13130A1362012-06-13013 June 2012 Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Hbpp ML13130A1392012-05-16016 May 2012 Radionuclide Selection for Dcgl Development, Attachment, a Dandd Calculation Reports ML13130A1382012-05-16016 May 2012 Radionuclide Selection for Dcgl Development HBL-12-004, 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Reporting Interval of January 1, 2010, Through December 31, 20112012-02-21021 February 2012 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Reporting Interval of January 1, 2010, Through December 31, 2011 ML13130A1342011-07-31031 July 2011 Humboldt Bay Power Plant (Hbpp) Historical Site Assessment 2011 Update HBL-13-008, (Hbpp) Historical Site Assessment 2011 Update, Appendix E, 2008 Characterization Results for Surface and Subsurface Soils2011-07-31031 July 2011 (Hbpp) Historical Site Assessment 2011 Update, Appendix E, 2008 Characterization Results for Surface and Subsurface Soils ML11209B5382011-04-20020 April 2011 Confirmatory Survey Results for Portions of the Material and Equipment from Units 1 and 2 at the Hbpp. 2029-SR-01-0 ML14128A1112010-10-31031 October 2010 Mitigation Plan, Humboldt Bay Power Plant. Prepared by Jrp Historical Consulting in Response to California Energy Commission for Demolition of Units 1, 2, and 3. Revision Dated October 2010 ML1027005392010-09-17017 September 2010 Scan Action Limits ML1023005572010-08-11011 August 2010 E-mail Dated August 11, 2010, from David Sokolsky, Pg&E, to John Hickman, NRC, Regarding NRC Questions on Humboldt Bay 20.2002 Request Including Radiological Characterization Report ML1027005382010-06-25025 June 2010 Marsame Survey Package - Structural Steel ML1027005372010-03-10010 March 2010 Procedure - Marsame Disposition of Materials and Equipment ML1000701172009-11-19019 November 2009 Oak Ridge Institute for Science and Education, Final Report - Radiological Survey for New Generation Footprint Area Plant Soils at Humboldt Bay Unit 3 ML14128A1122009-07-31031 July 2009 Mitigation Plan, Humboldt Bay Power Plant in Response to California Energy Commission CUL-10 for Demolition of Units 1, 2 and 3 HBL-09-009, Post-Shutdown Decommissioning Activities Report, Revision 32009-06-30030 June 2009 Post-Shutdown Decommissioning Activities Report, Revision 3 ML0830800972008-09-16016 September 2008 Letter Dated September 16, 2008, Providing Background Information for Conference Call with Humboldt Bay on Soil Sampling of New Generation Site HBL-08-006, Post-Shutdown Decommissioning Activities Report, Revision 2, and Request for NRC Coordination of Section 106 of the National Historic Preservation Act2008-03-31031 March 2008 Post-Shutdown Decommissioning Activities Report, Revision 2, and Request for NRC Coordination of Section 106 of the National Historic Preservation Act ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers HBL-05-017, Enclosure 3, Spent Fuel Pool Physical Inspection and Enclosure 4, Engineering Review of Control and Accountability of Modified Fuel Assemblies at Humboldt Bay Power Plant, to PG&E Letter HBL-05-0172005-05-27027 May 2005 Enclosure 3, Spent Fuel Pool Physical Inspection and Enclosure 4, Engineering Review of Control and Accountability of Modified Fuel Assemblies at Humboldt Bay Power Plant, to PG&E Letter HBL-05-017 HBL-05-010, ATI Consulting Report Evaluation of Nuclear Fuel Rod Fragments and Inference to Fuel Rod A-49 at Humboldt Bay Power Plant2005-03-31031 March 2005 ATI Consulting Report Evaluation of Nuclear Fuel Rod Fragments and Inference to Fuel Rod A-49 at Humboldt Bay Power Plant ML0420503102004-07-22022 July 2004 Request for Additional Information on License Application and Safety Analyses Report ML15211A5102003-08-12012 August 2003 Cultural Resource Study for the PG&E Humboldt Bay Power Plant, ISFSI Licensing Project - Final Report HBL-14-008, Enclosure 9: Technical Report TR-HBIP-2002-01, Seismic Hazard Assessment for the Humboldt Bay ISFSI Project. Appendix 9A-42 to End. Enclosures 10 & 11: Humboldt Bay Power Plant Tritium Evaluation and DECON-POS-HOS-H011, Groundwater Invest2002-12-27027 December 2002 Enclosure 9: Technical Report TR-HBIP-2002-01, Seismic Hazard Assessment for the Humboldt Bay ISFSI Project. Appendix 9A-42 to End. Enclosures 10 & 11: Humboldt Bay Power Plant Tritium Evaluation and DECON-POS-HOS-H011, Groundwater Investig ML0336503802002-09-0505 September 2002 Data Report a, Revision 0, Geologic Mapping in the ISFSI Site Area. ML0336503842002-09-0505 September 2002 Data Report D, Revision 0, Trenches at the ISFSI Site. ML0336503862002-05-10010 May 2002 Data Report E, Revision 0, Soil Laboratory Test Data. ML0336503822002-05-10010 May 2002 Data Report C, Revision 0, Downhole Geophysics in ISFSI Site Area. NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2018-04-04 Category:Miscellaneous MONTHYEARHBL-14-017, Independent Spent Fuel Storage Installation Humboldt Bay Quality Assurance Plan Proposed Changes2014-06-10010 June 2014
[Table view]Independent Spent Fuel Storage Installation Humboldt Bay Quality Assurance Plan Proposed Changes ML15210A7352014-02-28028 February 2014 Cultural Resources Monitoring Report No. 1, 08/2010 - 08/2013 DCL-13-094, and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask2013-09-30030 September 2013 and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask ML15211A5142013-08-31031 August 2013 Cultural Resources Monitoring Report and Recommendations HBL-13-002, Post-Shutdown Decommissioning Activities Report, Revision 42013-07-19019 July 2013 Post-Shutdown Decommissioning Activities Report, Revision 4 ML15211A5062013-07-15015 July 2013 Cultural Resources Inventory and Evaluation ML13130A0092013-05-0303 May 2013 License Termination Plan, Revision 0, Evaluation Through Chapter 2 Site Characterization - East Side Site ML13130A0112013-05-0303 May 2013 License Termination Plan, Revision 0, Chapter 2 - Site Characterization, Appendix 2-C Hbpp Groundwater Monitoring Summary Through Chapter 6 Compliance with the Radiological Criteria for License Termination HBL-12-004, 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Reporting Interval of January 1, 2010, Through December 31, 20112012-02-21021 February 2012 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Reporting Interval of January 1, 2010, Through December 31, 2011 ML11209B5382011-04-20020 April 2011 Confirmatory Survey Results for Portions of the Material and Equipment from Units 1 and 2 at the Hbpp. 2029-SR-01-0 ML1023005572010-08-11011 August 2010 E-mail Dated August 11, 2010, from David Sokolsky, Pg&E, to John Hickman, NRC, Regarding NRC Questions on Humboldt Bay 20.2002 Request Including Radiological Characterization Report HBL-09-009, Post-Shutdown Decommissioning Activities Report, Revision 32009-06-30030 June 2009 Post-Shutdown Decommissioning Activities Report, Revision 3 HBL-08-006, Post-Shutdown Decommissioning Activities Report, Revision 2, and Request for NRC Coordination of Section 106 of the National Historic Preservation Act2008-03-31031 March 2008 Post-Shutdown Decommissioning Activities Report, Revision 2, and Request for NRC Coordination of Section 106 of the National Historic Preservation Act ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers ML15211A5102003-08-12012 August 2003 Cultural Resource Study for the PG&E Humboldt Bay Power Plant, ISFSI Licensing Project - Final Report 2014-06-10 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML15211A510&oldid=2520403"