CNL-14-135, Central Emergency Control Center - Central Emergency Control Center (CECC) Operations Procedure Revision
| ML15205A215 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry, Watts Bar, Sequoyah |
| Issue date: | 08/22/2014 |
| From: | James Shea Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CNL-14-135 | |
| Download: ML15205A215 (2) | |
Text
L44 140822 003 Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-14-135 August 22, 2014 10 CFR 50, Appendix E, Section V 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390
Subject:
Central Emergency Control Center - Central Emergency Control Center (CECC) Operations Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, this submittal provides the revised Central Emergency Control Center (CECC) Emergency Plan Implementing Procedure (EPIP) as listed below.
EPIP Revision Title Effective Date CECC EPIP-2 45 Operations Duty Specialist Procedure for Notification of Unusual Event 07/28/2014 provides a summary of the changes and the analysis performed that concluded the changes do not affect the outcome, results, functions, processes, responsibilities, or requirements of the performance of the EPIP. Enclosure 2 provides a copy of the revised EPIP.
U.S. Nuclear Regulatory Commission Page 2 August 22, 2014 There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact Edward D. Schrull at (423) 751-3850.
. 1../f!. Shea Vi& President, Nuclear Licensing
Enclosures:
- 1. Central Emergency Control Center-Emergency Plan Implementing Procedure Revision - Summary of Changes and Analysis
- 2. CECC EPIP Operations Duty Specialist Procedure for Notification of Unusual Event, Revision 0045 cc (Enclosures):
NRC Regional Administrator-Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector-Sequoyah Nuclear Plant NRC Senior Resident Inspector-Watts Bar Nuclear Plant