Dominion Nuclear Connecticut, Inc.
5000 Dominion Boulevard, Glen Allen, VA 23060 - "now Web Address: www.dom.com July 2, 2015 U. S. Nuclear Regulatory Commission Serial No.: 15-314 Attention: Document Control Desk NLOSIWDC: RO Washington, DC 20555-0001 Docket No.: 50-423 License No.: NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNIT 3 REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE Dominion Nuclear Connecticut, Inc. (DNC) requests Nuclear Regulatory Commission (NRC) review and approval of the attached revision to the surveillance capsule removal schedule for Millstone Power Station Unit 3 (MPS3). Facility Operating License No.
NPF-49 Paragraph 2.C.(9) for MPS3 states in part, "Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation." The proposed reactor vessel surveillance capsule removal schedule was developed to obtain high fluence surveillance data to populate the embrittlement trend curve as described in MRP-326, "Materials Reliability Program: Coordinated PWR Reactor Vessel Surveillance Program (CRVSP) Guidelines," while continuing to meet the requirements of 10 CFR 50, Appendix H, and ASTM E 185-82, "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels," dated July 1, 1982.
DNC plans to remove standby Capsule Z from the reactor and reinstall standby Capsule Y into the reactor from the spent fuel pool during the spring 2016 refueling outage.
Standby Capsule Z test specimens will be stored at the vendor facility for future testing if needed, Standby Capsule Z dosimeters will be analyzed to maintain the quality and accuracy of the dosimetry analysis. In accordance with 10 CFR 50 Appendix H, paragraph IV.A, DNC will submit the results of the standby Capsule Z dosimetry analysis to the NRC within one year of the capsule withdrawal date.
DNC requests approval of the revision to the capsule withdrawal schedule by January 31, 2016 to support implementation during the spring 2016 outage.
If you should have any questions regarding this submittal, please contact Wanda Craft at (804) 273-4687.
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering AO
Serial No.15-314 Docket No. 50-423 Page 2 of 2
Attachment:
Proposed Revision to the Millstone Power Station Unit 3 Reactor Vessel Surveillance Program Commitments contained in this letter: None cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 Richard V. Guzman NRC Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station
Serial No.15-314 Docket No. 50-423 ATTACHMENT PROPOSED REVISION TO THE MILLSTONE POWER STATION UNIT 3 REACTOR VESSEL SURVEILLANCE PROGRAM DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNIT 3
Serial No.15-314 Docket No. 50-423 Attachment, Page 1 of 4 Proposed Revision to the Millstone Power Station Unit 3, Reactor Vessel Surveillance Program
1. Background
Appendix H to 10 CFR Part 50 describes reactor vessel (RV) material surveillance program requirements. Paragraph (111)(B)(3) of this appendix states that a proposed material withdrawal schedule must be submitted with a technical justification per 10 CFR 50.1, and approved prior to implementation. In addition, the Millstone Power Station Unit 3 (MPS3) Renewed Facility Operating License No. NPF-49 Paragraph 2.C.(9) states in part, "Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation."
The MPS3 surveillance capsule program was originally designed in accordance with ASTM E185-82 and 10 CFR 50 Appendix H. The program consists of the following:
" Three scheduled capsules (already removed and tested) to meet the above requirements for a design life of 54 EFPY.
- Three additional standby capsules.
The contents of the capsules are outlined in MPS3 FSAR Section 5.3.1.6.
Industry has developed a Coordinated PWR Reactor Vessel Surveillance Program (CRVSP), which is documented in MRP-326, Coordinated PWR Reactor Vessel Surveillance Program (CRVSP) Guidelines [Ref. 1]. The purpose of CRVSP is to allow an increase in the fluence levels of future surveillance capsules prior to withdrawal while maintaining compliance with 10 CFR 50 Appendix H. CRVSP will help generate high fluence PWR vessel surveillance data in support of extended life operations.
The MPS3 surveillance capsules are subject to a high lead factor (greater than 4).
This creates the potential for standby capsules to no longer meet the requirement of ASTM E185-82, Section 3.1 which states "the [surveillance capsule] tests yield results useful for the evaluation of radiation effects on the reactor vessel." In order to support potential plant operation beyond 60 years, a management strategy is needed to maximize the useful data that can be obtained from the standby capsules.
- 2. Current Proqram / Withdrawal Schedule Prior to initial start-up, six surveillance capsules containing beltline materials fabricated from ASME SA-533 Grade B Class 1 (low copper) and Linde 91 flux (low copper) were inserted in the MPS3 reactor vessel. Three of the six surveillance capsules (U, X and W) have been removed and tested [Refs. 2, 3 and 4]. Table 1
Serial No.15-314 Docket No. 50-423 Attachment, Page 2 of 4 shows the currently approved withdrawal schedule for the MPS3 reactor vessel surveillance capsules. Capsule W was withdrawn and tested after 13.8 effective full power years (EFPY) with accrued fluence of 3.16 x 1019 n/cm 2 . Standby capsules Y and V were withdrawn after 13.8 EFPY (end of cycle (EOC) 10, October, 2005) and2 placed into storage. Capsules Y and V have accrued fluence of 2.98 x 1019 n/cm and are available for reinsertion.
- 3. Requested Changes to Program / Withdrawal Schedule Table 2 provides the proposed revision to the reactor vessel surveillance capsule withdrawal schedule. The revised schedule is proposed to employ Capsule Z to support potential future plant operation of 80 years or more, to continue satisfying the requirements of ASTM E185-82, and to be prepared for potential future implementation of ASTM E185-10. Withdrawal of Capsule Z will preclude the capsule fluence from exceeding two times end-of-life estimated peak reactor vessel fluence. Concurrent reinsertion of Capsule Y will maintain continuous reactor vessel fluence monitoring as required by 10 CFR 50 Appendix H.
- 4. Justification The most recent detailed review of the MPS3 reactor vessel surveillance program was performed and documented in support of the MPS3 stretch power uprate in November 2008. From the recent review, 72 EFPY and 90 EFPY maximum reactor vessel beltline fast neutron fluence was estimated to be 3.57 x 1019 n/cm 2 and 4.45 x 1019 n/cm 2 , respectively. At EOC 17, spring 2016, the fast neutron fluence for Capsule Z at the core midplane is estimated to be 5.37 x 1019 n/cm 2 . Removal of Capsule Z at EOC 17 will provide capsule fluence that is within one and two times the estimated 80 year life (72 EFPY) and estimated 100 year life (90 EFPY) peak reactor vessel fluence. Reinsertion of Capsule Y at EOC 17 will maintain continuous reactor vessel fluence monitoring as required by 10 CFR 50 Appendix H.
MPS3 Capsule Z is included in MRP-326 Table 4-1 as a potential candidate to support the CRVSP surveillance program. However, Capsule Z was not selected to support the program. Withdrawal of Capsule Z at EOC 17 is consistent with the intent of CRVSP to provide high fluence data of SA-533 Grade B Class 1 with low copper.
Serial No.15-314 Docket No. 50-423 Attachment, Page 3 of 4
References:
- 1. Materials Reliability Program: Coordinated PWR Reactor Vessel Surveillance Program (CRVSP) Guidelines (MRP-326). EPRI, Palo Alto, CA: 2011. 1022871
- 2. WCAP-1 1878, Analysis of Capsule U from the Northeast Utilities Service Company Millstone Unit 3 Reactor Vessel Radiation Surveillance Program,June 1988
- 3. WCAP-15405, Analysis of CapsuleX from the Northeast Utilities Service Company Millstone Unit 3 Reactor Vessel Radiation Surveillance Program,May 2000
- 4. WCAP-16629, Analysis of Capsule W From The Dominion Nuclear Connecticut Millstone Unit 3 Reactor Vessel Radiation Surveillance Program,September 2006 Table 1: Current Millstone Unit 3 Reactor Vessel Surveillance Capsule Withdrawal Schedule CAPSULATE LOCATION LEAD REMOVAL FLUENCE FACTOR(a) TIME (n/cm2,E>1.OMeV)(a)
(EFPY)(b)
U 58.50 4.31 1.3 4.49 x 1018(c)
X 238.50 4.37 8.0 2.21 x 1019(c)
W 121.50 4.32 Approx. 14.0 3.76 x 1 019(c. d) y(e) 2410 4.11 Standby V(e) 610 4.11 Standby Z(e) 301.50 4.32 Standby
- a. Updated in Capsule X dosimetry analysis.
- b. Effective Full Power Years (EFPY) from plant startup.
- c. Plant specific evaluation.
- d. This projected fluence is not less than once or greater than twice the peak end of license fluence, and is approximately equal to the peak vessel fluence at 54 EFPY.
- e. These capsules will be at the approximate 54 EFPY peak surface (i.e., clad/base metal interface) fluence when capsule W is withdrawn.
Serial No.15-314 Docket No. 50-423 Attachment, Page 4 of 4 Table 2: Proposed Millstone Unit 3 Reactor Vessel Surveillance Capsule Withdrawal Schedule LEAD REMOVALFLUENCE FACTOR(a)
CAPN TIME FUN (EFPY)(b) (n/cm2,E>1.0MeV)(a)
U 58.50 4.06 1.3 4.00 x 1018(c)
X 238.50 4.35 8.0 1.98 x 1019(c)
W 121.50 4.22 13.8 3 .16 x 1019(c. d) y(e)(f0 2410 3.98 Standby Footnote (i)
V(e) 610 3.98 Standby Z(g) 301.50 4.22 Approx. 23.4 5.37x 1 0 19(h)
- a. Updated in Capsule W dosimetry analysis.
- b. Effective Full Power Years (EFPY) from plant startup.
- c. Plant specific evaluation.
- d. This fluence is not less than once or greater than twice the peak end of license fluence, and is approximately equal to the peak vessel fluence at 63 EFPY.
- e. Capsules Y and V were withdrawn after 13.80 EFPY (EOC 10) and placed into storage after accruing 2.98 x 10"9 n/cm2 fluence.
- g. Capsule Z was withdrawn at approximately 23.4 EFPY (EOC 17) after accruing approximately 5.37 x 1019 n/cm 2 fluence. Dosimetry analysis was performed and the test specimens placed into vendor storage for future testing.
- h. This projected fluence is greater than once and less than twice the projected 72 EFPY and 90 EFPY peak vessel fluence.
- i. Capsule Y is installed for fluence monitoring during the operating license in accordance with ASTM E 185-82.