Entergy Operations Inc.

P fltET) l7265RkierRoad Hwy I 8 Tel 504 739 6845 Fax 504 739 6678 John P. Jarrell Regulatory Assurance Manager W3FI -201 5-0050 Waterford 3 June 30, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Commitment Change Notification for Generic Safety Issue

- 191 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38

References:

I NRC SECY-1 2-0093, Closure Options for Generic Safety Issue

- I 91, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, dated July 9, 2012. (ADAMS Accession No. ML121320270) 2.

SRM-NRC SECY-1 2-0093, Closure Options for Generic Safety Issue

- I 91, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, dated December 14, 2012. (ADAMS Accession No. MLI 2349A378) 3.

NRC letter to NEI, Nuclear Regulatory Commission Review of Generic Safety Issue-191 Nuclear Energy Institute Revised Schedule for Licensee Submittal of Resolution Path, dated November 21

, 2012. (ADAMS Accession No. ML12326A497) 4.

Entergy IetterW3Fl-2013-0027, Closure Option for Generic Safety Issue

I 91, dated May I 6, 201 3. (ADAMS Accession No. ML13137A133)

Dear Sir or Madam:

In Reference I, the NRC staff recommended three closure options to the Commission for resolving Generic Safety Issue I 91 and the Commission approved the staffs recommendation to allow Licensees to choose any of the three options to close the issue in Reference 2. On May I 6, 201 3, Waterford Steam Electric Station, Unit 3 submitted a letter to the NRC (Reference 4) identifying the closure option that Waterford 3 had selected and the associated implementation schedule.

In this letter (Reference 4), Waterford 3 made the following commitment:

W3FI -2015-0050 Page 2 Within six months of establishing a final determination of the scope of insulation replacement remediation, or model refinements based on the results of the PWROG program, Waterford 3 will submit a final updated supplemental response to support closure of GL 2004-02 for Waterford 3. Waterford 3 expects to submit the final updated response by June 30, 2015.

The PWROG program schedule has changed and final results of the PWROG program have not been received. This has resulted in Waterford 3 not being able to meet the original commitment date of June 30, 201 5. Based upon the change in the schedule, Waterford 3 is revising the original commitment as documented in Attachment I.

This commitment change does not affect the closure option Waterford 3 selected in Reference 4 and will still support successful resolution of GSI-1 91 and closure of Generic Letter (Gl) 2004-02.

This amendment response contains one revised commitment (Attachment 1).

If you have any questions or require additional information, please contact John Jarrell, Regulatory Assurance Manager, at 504-739-6685.

I.

List of Regulatory Commitments cc:

Mr. Marc L. Dapas Regional Administrator U. S. NRC, Region IV RidsRgn4MailCenternrc.gov NRC Senior Resident InspectorforWaterford 3 Frances.Ramirez©nrc.gov (SRI)

Chris.Speernrc.gov (RI)

Thomas.SuIlivannrc.gov (RI)

NRC Program ManagerforWaterford 3 Michael. Orenak@nrc.gov Sincerel

Attachment I to W3FI -201 5-0050 List of Regulatory Commitments

Attachment I to W3FI -201 5-0050 List of Regulatory Commitments This table identifies actions discussed in this letter for which Entergy commits to perform. Any other actions discussed in this submittal are described for the NRCs information and are not commitments.

TYPE SCHEDULED (Check one)

COMPLETION COMMITMENT ONE-CONTINUING DATE TIME COMPLIANC (If Required)

ACTION E

Within six months of establishing a final X

December 15, 2016 determination of the scope of insulation (expected date) replacement, remediation, or model refinements, Waterford 3 will submit a final updated supplemental response to support closure of GL 2004-02 for Waterford 3.