ML15175A112
| ML15175A112 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 06/18/2015 |
| From: | Jonathan Brown Maine Yankee Atomic Power Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| OMY-15-024 | |
| Download: ML15175A112 (2) | |
Text
SAFEGUARDS INFORMATION Enclosures I and 2 Contain Safeguards Information Withhold Under 10 CFR 2.390 When separated from the Safeguards Information enclosures, the cover letter is DECONTROLLED provided the transmittal document does not warrant protection from unauthorized disclosure.
MAINE YANKEE 321 Old Ferry Road, Wiscasset, Maine 04578 June 18, 2015 OMY-15-024 10 CFR 50.4(b)(4), 10 CFR 50.5 4(p)(2) 10 CFR 73.22 and 10 CFR 2.390 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 Maine Yankee Atomic Power Company Maine Yankee Independent Spent Fuel Storage Installation NRC License Nos. DPR-36 and SFGL-14 (NRC Docket Nos. 50-3 09 and 72-30)
Subject:
Maine Yankee Independent Spent Fuel Storage Installation Physical Security Plan, Revision 4 In accordance with the provisions of 10 CFR 50.54, "Conditions of Licenses," paragraph (p)(2),
the Maine Yankee Atomic Power Company (Maine Yankee) is submitting changes to the MY Independent Spent Fuel Storage Installation (ISFSD Physical Security Plan. These changes were implemented on June 18, 2015.
A summary of changes to the MY ISFSI Physical Security Plan is provided in Enclosure 1.
The MY ISFSI Physical Security Plan, Revision 4, is provided in Enclosure 2. The enclosures contain Safeguards Information. It is therefore requested that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," paragraph (d)(1), and 10 CFR 73.22, "Protection of Safeguards Information:
Specific Requirements," paragraph (a)(4). When detached from Enclosures 1 and 2, this cover letter does not contain Safeguards Information and may be decontrolled.
If you have any questions regarding this submittal, please do not hesitate to contact me at (207) 882-1303.*
Pespect, ully,
-2
/iJ. Stanley trown, P.E.
V ISFSI Manager SAFEGUARDS INFORMATION Enclosures 1 and 2 Contain Safeguards Information Withhold Under 10 CFR 2.390 When separated from the Safeguards Information enclosures, the cover letter is DECONTROLLED provided the transmittal document does not warrant protection from unauthorized disclosure.
Socl
SAFEGUARDS INFORMATION Enclosures I and 2 Contain Safeguards Information Withhold Under 10 CFR 2.390 When separated from the Safeguards Information enclosures, the cover letter is DECONTROLLED provided the transmittal document does not warrant protection from unauthorized disclosure.
Maine Yankee Atomic Power Company OMY-15-024/June 18, 2015/Page 2
Enclosures:
- 2. MY ISFSI Physical Security Plan, Revision 4 cc:
D. Dorman, NRC Region I Administrator (Cover Letter Only)
M. S. Ferdas, Chief, Decommissioning Branch, NRC, Region 1 J. Goshen, NRC Project Manager P. J. Dostie, SNSI, State of Maine (Cover Letter Only)
J. Hyland, State of Maine (Cover Letter Only)
SAFEGUARDS INFORMATION Enclosures 1 and 2 Contain Safeguards Information Withhold Under 10 CFR 2.390 When separated from the Safeguards Information enclosures, the cover letter is DECONTROLLED provided the transmittal document does not warrant protection from unauthorized disclosure.