NRC Fire Protection Inspection at Ginna Station
ML15170A360
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/17/2015
From: Richmond J
Engineering Region 1 Branch 3
To: Bradshaw C, Harding T
Exelon Generation Co
Richmond J
References
Download: ML15170A360 (1)


Text

From: Richmond, John Sent: Wednesday, June 17, 2015 2:04 PM To: Harding Jr, Thomas:(GenCo-Nuc) (thomas.hardingjr@exeloncorp.com);

Bradshaw, Christopher E:(GenCo-Nuc)

(christopher.bradshaw@exeloncorp.com)

Cc: Rogge, John; Robinson, Jay

Subject:

NRC Fire Protection Inspection at Ginna Attachments: Ginna Document Request for Appendix R Licensing Basis.docx Gentlemen, The Ginna License Amendment Request (LAR) to transition Ginna's fire protection program licensing basis from 10 CFR 50 Appendix R to the National Fire Protection Association (NFPA) 805 is in progress, and may or may not be completed by the scheduled date for Ginna's Triennial Fire Protection Inspection. The notification for the Triennial Fire Protection Inspection, along with a Request for Information (i.e., the document request list) was sent to you on May 26, 2015 (ML15147A004). That document request list, dated May 26, 2015, was based on the expectation that Ginnas fire protection program licensing basis would transition to NFPA 805 prior to the start of the NRC inspection.

A revised document request list is attached to this email. The revised list reflects the differences between those documents needed for an Appendix R licensing basis verses an NFPA 805 licensing basis, by deleting documents specific to NFPA 805 (shown in strike-out) and adding additional documents specific to Appendix R (yellow highlighting). Please note that the majority of the document request list has remained unchanged.

In addition, for an Appendix R licensing basis facility, the NRC team will use Inspection Procedure 71111.05T (not 71111.05XT).

The schedule for the inspection remains unchanged, as follows:

  • Information Gathering Visit: September 1 - 3, 2015
  • On-Site Inspections: September 14 - 18, 2015 and September 28 - October 2, 2015 If you have any questions regarding this information request, please contact me as soon as possible.

A copy of this email and its attachment will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of the NRC's document system (ADAMS).

John Richmond NRC Senior Reactor Inspector (610) 337-5220