ML15166A226
| ML15166A226 | |
| Person / Time | |
|---|---|
| Site: | Monticello (DPR-022) |
| Issue date: | 01/29/2015 |
| From: | Region 3 Administrator |
| To: | Gardner P Northern States Power Co, Xcel Energy |
| References | |
| L-MT-15-010, NUREG-1021 | |
| Download: ML15166A226 (3) | |
Text
ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATION IS COMPLETE Monticello Nuclear Generating Plant
~ Xcel Energy 2807 W County Road 75 Monticello , MN 55362 January 29 , 2015 L-MT-15-010 10 CFR 55.40 NUREG-1021 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. OPR-22 Monticello Nuclear Generating Plant (MNGP) Initial Operator Licensing Examination to be Conducted the Weeks of June 1 and June 8, 2015 Reference 1: NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1 In accordance with the requirements of 10 CFR 55.40(b)(4), Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy requests NRC approval of the proposed operating test. Further, 10 CFR 55.40(b)(1 ), requires that examinations meet the requirements of Reference 1. Therefore, enclosed for review are the proposed examination materials for the initial license examinations for the Monticello Nuclear Generating Plant (MNGP) operator license applicants.
In accordance with 10 CFR 55.49, "Integrity of Examinations and Tests," and NUREG-1021 , Section ES-201 , Attachment 1, "Examination Security and Integrity Considerations ," NSPM requests that the enclosed materials be withheld from public disclosure until after the examinations are complete.
The proposed examination materials were prepared per the guidelines of Reference 1, Sections ES-30 1, "Preparing Initial Operating Tests". The proposed examination materials have been prepared by NSPM for Seven (7) Senior Reactor Operator (SRO) -
Instant (I), and Six (6) Reactor Operator (RO) license ca ndidates.
RECEIVED FEB 0 2 2015
Regional Administrator, Region Ill L-MT-15-010 Page2 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
Peter A. Gardner Site Vice President (Acting), Monticello Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc: Mr. Dell McNeil, Region Ill, USNRC (with enclosures)
Project Manager, Monticello, USNRC (without enclosures)
Resident Inspector, Monticello, USNRC (without enclosures)
ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATION IS COMPLETE ENCLOSURE 1 MONTICELLO NUCLEAR GENERATION PLANT INITIAL OPERA TOR LICENSING EXAMINATION MATE RIALS Form Title or Description Number -------* "" *-*--****c *~""'" **~*-**~***"""""-
ES--301-3 Operating Test Quality Checklist 1
f .... *****-** .............................- ....* ****----- f*-** .. __________ ****--*. -*-****-**----***-*******-*.. ------*--* . ---***---*..*****-- .... **-* **-** *-*. - . **-*-*-** ......... ---
ES-301-4 Simulator Scenario Quality Checklist 1
ES-301-6 Competencies Checklists 2
Job Performance Measures (JPMs) 209 Simulator Scenarios 130
'l :.:.f '1