ML15166A173

From kanterella
Jump to navigation Jump to search
2015 Monticello Nuclear Generating Plant Initial License Examination Letter Transmitting the Examination Outline
ML15166A173
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/31/2015
From: Gardner P
Northern States Power Co, Xcel Energy
To:
Region 3 Administrator
References
LMT-15-022, NUREG-1021
Download: ML15166A173 (3)


Text

ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATION IS COMPLETE fl Xcel Energy March 31, 2015 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 L-MT-15-022 10 CFR 55.40 NUREG-1021 Monticello Nuclear Generating Plant (MNGP) Initial Operator Licensing Examination to be Conducted the Weeks of June 1 and June 8, 2015 Reference 1: NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1 In accordance with the requirements of 10 CFR 55.40(b)(4), the Northern States Power Company, a Minnesota corporation (NSPM) requests NRC approval of the proposed written examination and operating tests. Further, 10 CFR55.40(b)(1 ), requires that examinations meet the requirements of Reference 1. The 1refore, enclosed for review are the proposed examination materials for the initial license examinations for the Monticello Nuclear Generating Plant (MNGP) operator license applicants.

In accordance with 10 CFR 55.49, "Integrity of Examinations and Tests," and NUREG-1021, Section ES-201, Attachment 1, "Examination Security and Integrity Considerations," NSPM requests that the enclosed materials be withheld from public disclosure until after the examinations are complete.

The proposed examination materials were prepared per the guidelines of Reference 1, Sections ES-301, "Preparing Initial Operating Tests," and ES-401, "Preparing Initial Site-Specific Written Examinations". The proposed examination materials have been prepared by NSPM for Seven (7) Senior Reactor Operator (SRO) - Instant (I), and Six (6) Reactor Operator (RO) license candidates.

RECEIVED APR 0 2 ?015

t7<egionai Administrator, Region Ill L-MT-15-022 Page 2

.§ummary_ of _Commitments This letter makes no new commitments and no revisions to existing commitments.

Peter A Gardner Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc:

Mr. Dell McNeil, Region Ill, USNRC (with enclosures)

Project Manager, Monticello, USNRC (without enclosures)

Resident Inspector, Monticello, USNRC (without enclosures)

ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATION IS COMPLETE ENCLOSURE 1 MONTICELLO NUCLEAR GENERATION PLANT INITIAL OPERATOR LICENSING EXAMINATION MATERIALS Form Title or Description Number of Number Pages ES-401-6 Written Exam Quality Checklist 1

ES-401-7 RO Written Exam Cover Sheet 1

RO Written Exam (Ready to Give) 85 Provided References for RO Questions 2

ES-401-8 SRO Written Exam Cover Sheet 1

SRO Written Exam (Ready to Give) 112 Provided References for SRO Questions 161 (Includes 6 EOP Flow Charts and 1 EAL Matrix)

RO/SRO.Written Exam Key with Supportive 248' References QF-1071-01 Master Security Agreement Updated Since 75 Day Submittal 7

QF-1071-02 Limited Security Agreement Updated Since 75 Day Submittal 618 pages follow