ML15161A005

From kanterella
Jump to navigation Jump to search
Operator Licensing Examination Data
ML15161A005
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/12/2015
From: Tiefenauer R
Ameren Missouri
To:
NRC/OIS/CSD/FPIB
laura hurley
References
ULNRC 6219
Download: ML15161A005 (2)


Text

^Ameren Callaway Plant MISSOURI May 12,2015 ULNRC 6219 U.S. Nuclear Regulatory Commission ATTN: FOIA, Privacy, and Information Collections Branch Washington, DC 20555-0001 Ladies and Gentlemen:

OPERATOR LICENSING EXAMINATION DATA Enclosed is a NRC Form 536 for the Callaway Nuclear Plant, NRC Region IV.

Ifyou need any additional information, please contact Mr. Daniel T. Harris (573) 239-0023.

RAT/mrw Enclosure Respectfully, Ricky A. Tiefenauer Senior Training Supervisor, PO Box 620 Fulton, MO 65251 AmerenMissouri.com

NRC FORM 536 (01-2015)

U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 10/31/2017 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection is used to plan budgets and resources for operator examinations. Send commentsregarding burdenestimateto the FOIA, Privacy, and Infonnation Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Intemet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget,Washington, DC 20503. Ifa means used to imposean information collection does not displaya currently valid 0MBcontrol number, the NRC maynot conductor sponsor, and a person is not requiredto respondto, the information collection.

FACILITY Callaway Energy Center A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS CY 17 CY 19 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY 17 CY 19 09/11/2017 06/03/2019 09/18/2017 06/10/2019 CY CY nrcre6i6n IV CY CY C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 536 (01-2015)

MARCH CY 17 JUNE SEPTEMBER DECEMBER 12 CY 19 MARCH JUNE SEPTEMBER DECEMBER 12