L-2015-145, Additional Information Regarding License Amendment Request for Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)

From kanterella
(Redirected from ML15140A220)
Jump to navigation Jump to search

Additional Information Regarding License Amendment Request for Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)
ML15140A220
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/12/2015
From: Costanzo C
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15140A209 List:
References
L-2015-145, NFPA-805
Download: ML15140A220 (2)


Text

Enclosures 1 and 2 contain Security Related Information - Withhold Under 10 CFR 2.390. Upon removal of Enclosures 1 and 2, this document is decontrolled.

W May 12, 2015 FPL.

L-2015-145 10 CFR 50.90 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Re:

St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Additional Information Regarding License Amendment Request for Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)

References:

1. FPL letter L-2013-099 dated March 22, 2013: Transition to 10 CFR 50.48(c) -NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)
2. FPL letter L-2014-056 dated February 24, 2014: 60-Day Response to Request for Additional Information Regarding License Amendment Request for Transition to 10 CFR 50.48(c) - NFPA 805
3. FPL letter L-2014-083 dated March 25, 2014: 90-Day Response to Request for Additional Information Regarding LAR for Transition to 10 CFR 50.48(c) - NFPA 805
4. FPL letter L-2014-109 dated April 25, 2014: 120-Day Response to Request for Additional Information Regarding LAR for Transition to 10 CFR 50.48(c) - NFPA 805
5. FPL letter L-2014-203 dated July 14, 2014: Response to Request for Additional Information Regarding LAR for Transition to 10 CFR 50.48(c) - NFPA 805
6. FPL letter L-2014-270 dated August 27, 2014: Response to Request for Additional Information Regarding LAR for Transition to 10 CFR 50.48(c) - NFPA 805
7. FPL letter L-2014-289 dated September 10, 2014: Response to Request for Additional Information Regarding LAR for Transition to 10 CFR 50.48(c) - NFPA 805
8. FPL letter L-2014-314 dated October 10, 2014: Response to Request for Additional Information Regarding LAR for Transition to 10 CFR 50.48(c) - NFPA 805
9. FPL letter L-2015-068 dated March 10, 2015: Response to Request for Additional Information Regarding LAR for Transition to 10 CFR 50.48(c) - NFPA 805
10. FPL letter L-2015-104 dated April 1, 2015: Response to Request for Additional Information Regarding LAR for Transition to 10 CFR 50.48(c) - NFPA 805
11. FPL letter L-2015-134 dated April 20, 2015: Response to Request for Additional Information Regarding LAR for Transition to 10 CFR 50.48(c) - NFPA 805 Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

L-2015-145 Page 2 of 2 Per Reference I above, Florida Power and Light Company (FPL) requested an amendment to the Renewed Facility Operating License (RFOL) for St. Lucie Units I and 2. The License Amendment Request (LAR) will enable FPL to adopt a new fire protection licensing basis which complies with the requirements in 10 CFR 50.48(a) and (c) and the guidance in Revision 1 of Regulatory Guide (RG) 1.205.

Per References 2 through 11, FPL responded to specific NRC requests for additional information to clarify aspects of the LAR submittal. Enclosure 1 to this letter provides supplemental clarification to information previously provided per References 1 through 11. Enclosure 2 to this letter provides the LAR Attachment S mark-up associated with the changes described in.

The information provided in this submittal does not impact the 10 CFR 50.92 evaluation of"No Significant Hazards Consideration" previously provided in FPL letter L-2013-099 (Reference 1).

This letter makes new commitments and changes existing commitments.

FPL requests that the enclosures to this letter, which contains security-related information, be withheld from public disclosure in accordance with 10 CFR 2.390. Upon removal of Enclosures 1 and 2, this document is decontrolled.

Should you have any questions regarding this application, please contact Mr. Eric Katzman, Licensing Manager, at 772-467-7734.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on May/IZ, 2015.

Reectfully submitted, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/rcs

Enclosures:

1. St. Lucie Units I and 2 NFPA 805 LAR Additional Information -

Withheld from Public Disclosure

2. St. Lucie Units 1 and 2 NFPA 805 LAR Attachment S Mark-Up -

Withheld from Public Disclosure cc:

Ms. Cindy Becker, Florida Department of Health USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Units I and 2