Y)YANKEE A TOMIC ELECTRIC COMPANY XANKE649 Yankee Road, Rowe, Massachusetts 01367 April 28, 2015 BYR 2015-018 10 CFR 50.4 and 10 CFR 50.36a(a)(2)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 Yankee Atomic Electric Company Yankee Nuclear Power Station Independent Spent Fuel Storage Installation NRC License Nos. DPR-3 and SFGL-13 (NRC Docket Nos.50-029 and 72-31)
Subject:
Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2014 10 CFR 50.36a(a)(2), Section 2.3.2 of Appendix C of the Yankee Atomic Electric Company (YAEC) Quality Assurance Program (QAP) for the Yankee Rowe Independent Spent Fuel Storage Installation (ISFSI), and Section 3.2 of the Yankee Nuclear Power Station ISFSI Off-Site Dose Calculation Manual (ODCM), require YAEC to submit an Annual Radioactive Effluent Release Report. Enclosure 1 provides this report for the period of January 1 through December 31, 2014.
Section 2.3.1 of Appendix C of the YAEC QAP for the Yankee Rowe ISFSI and Section 3.1 of the Yankee Nuclear Power Station ISFSI ODCM require the submittal of an Annual Radiological Environmental Operating Report. Enclosure 2 provides the report for the period of January 1 through December 31, 2014.
Section 2.2b) of Appendix C of the YAEC Quality Assurance Program for the Yankee Rowe ISFSI requires that any changes to the ODCM to be submitted as part of or concurrent with the Annual Radioactive Effluent Release Report. No revisions to the Yankee Nuclear Power Station ISFSI ODCM were issued for the period of January 1 through December 31,2014.
Yankee Atomic Electric Company BYR 2015-018/April 28, 2015/Page 2 If you have any questions regarding this submittal, please do not hesitate to contact me at (413) 424-5261 ext. 303.
Respectfully, Brian Smith ISFSI Manager
Enclosures:
- 1. Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, January - December 2014.
- 2. Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report, January - December 2014 cc:
D. Dorman, NRC Region I Administrator M. S. Ferdas, Chief, Decommissioning Branch, NRC, Region I J. Goshen, NRC Project Manager J. Giarrusso, Planning, Preparedness & Nuclear Section Chief, MEMA J. Cope-Flanagan, Assistant General Counsel, MDPU J. Reyes, State of Massachusetts Office of the Attorney General
BYR 2015-018 ENCLOSURE ]
YANKEE NUCLEAR POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT JANUARY - DECEMBER 2014 April 2015