ES-301 Operating Test Quality Checklist Facilit : PRAIRIE ISLAND Date of Examination: AUGUST 2014 0 eratin Test Number: Pl-ILT-NRC-14 Initials

1. General Criteria
a. The operating test conforms with the previously approved outline; changes are consistent with sam lin requirements (e .. , 10 CFR 55.45, operational importance, safe! function distribution).
b. There is no day-to-day repetition between this and other operating tests to be administered durin this examination.
c. The operatin test shall not duplicate items from the ap licants' audit test(s). (see Section D.1.a.)
d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.
e. It appears that the operating test will differentiate between competent and less-than-competent ap licants at the desi nated license level.
2. Walk-Through Criteria
a. Each JPM includes the following, as applicable:

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:

detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable

b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a cop is attached.

Printed Nct,me I Signature Date

a. Author 5~11J;j1-.: .5N:i;:.i,-;,1 ri /  ::::l:(_::)\'::;;;*:. . -** s* J *r J 11.f
b. Facility Reviewer(*)

\01>':* .t* 7? J/ l Lj

c. "'-'-'-'=-"--'-""'..........""7-i-"~~""'+~""""'""""-'i...,,,..<r-.O'.""----f!*y;2 &,7(?;, //4
d. NRC Supervisor >A8;1,; f' I

NOTE:

  • The facility signature is not applicable for NRG-developed tests.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.