UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Louis Cortopassi Site Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-4 9610 Power Lane Blair, NE 68008 May 7, 2015
SUBJECT:
NUCLEAR REGULATORY COMMISSION PLAN FOR THE AUDIT OF OMAHA PUBLIC POWER DISTRICT'S FLOOD HAZARD REEVALUATION REPORT SUBMITTAL RELATING TO THE FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.1-FLOODING FOR FORT CALHOUN STATION, UNIT 1 (TAC NO. MF4711)
Dear Mr. Cortopassi:
This letter documents the U.S. Nuclear Regulatory Commission (NRC) staff's plan to perform a regulatory audit of Omaha Public Power District's (the licensee) Flood Hazard Reevaluation Report (FHRR) submittal related to the Fukushima Near-Term Task Force Recommendation 2.1, Flooding for Fort Calhoun Station, Unit 1 (Fort Calhoun). This technical audit will be performed consistent with NRC Office of Nuclear Reactor Regulation, Office Instruction LIC-111, "Regulatory Audits," dated December 29, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML082900195). The audit will be conducted over multiple sessions, as needed, and the NRC staff will develop an audit summary report to document its observations and conclusions within 90 days of the final audit session.
The audit will provide the NRC with a better understanding of the Fort Calhoun FHRR which was submitted on February 4, 2015 (ADAMS Accession No. ML15042A127). Specifically, the audit will provide the NRC with a better understanding of the analyses of the flooding hazards presented in the Fort Calhoun FHRR. The audit is intended to support completion of the staff's review of the FHRR and the subsequent issuance of a Staff Assessment.
The enclosed audit plan outlines the process that will allow the NRC staff to identify additional information necessary for the staff to complete the FHRR review. The details of this audit have been discussed with Mr. Joe Wiegand of your staff.
If you have any questions, please contact me at (301) 415-6197 or by e-mail at Tekia.Govan@nrc.gov.
Docket No. 50-285
Enclosure:
Audit Plan cc w/encl: Distribution via Listserv Sincerely, Tekia V. Govan, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation
NRC PLAN FOR THE AUDIT OF OMAHA PUBLIC POWER DISTRICT'S FLOOD HAZARD REEVALUATION REPORT SUBMITTAL RELATING TO THE FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.1-FLOODING FOR FORT CALHOUN STATION, UNIT 1 BACKGROUND AND AUDIT BASIS:
By letter dated March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued a request for information to all power reactor licensees and holders of construction permits in active or deferred status, pursuant to Title 1 O of the Code of Federal Regulations (10 CFR),
Section 50.54(f) "Conditions of license" (hereafter referred to as the "50.54(f) letter). The request was issued in connection with implementing lessons-learned from the 2011 accident at the Fukushima Dai-ichi nuclear power plant, as documented in The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. Recommendation 2.1 of that document recommended that the staff issue orders to all licensees to reevaluate seismic and flooding for their sites against current NRC requirements and guidance. Subsequent Staff Requirements Memoranda associated with Commission Papers SECY 11-0124 and SECY-11-0137, instructed the NRC staff to issue requests for information to licensees pursuant to 10 CFR 50.54(f).
By letter dated February 4, 2015, Omaha Public Power District (OPPD, the licensee) submitted its Flood Hazard Reevaluation Report (FHRR) for Fort Calhoun Station, Unit 1 (Fort Calhoun)
(Agencywide Documents Access and Management System (ADAMS) Accession No. ML15042A127). The NRC staff has begun its review of the aforementioned submittal and plans to conduct a regulatory audit of OPPD to aid in its review of the licensee's FHRR.
REGULATORY AUDIT SCOPE AND METHODOLGY:
The areas of focus for the regulatory audit is the information contained in the Fort Calhoun FHRR submittal, and all associated and relevant supporting documentation used in the development of the aforementioned document including, but not limited to, methodology, process information, calculations, computer models, etc. The audit will be conducted and completed over several meetings, the dates of which will be determined, as necessary.
Enclosure INFORMATION AND OTHER MATERIAL NECESSARY FOR THE REGULATORY AUDIT:
The information required for the audit is the licensee's models and supporting calculations and documentation related to the storm surge and site specific probable maximum precipitation analyses. Other information needs will be discussed as audit meetings are scheduled.
NRG AUDIT TEAM:
Title Team Member Affiliation Team Leader, NRR/JLD Tekia Govan NRG Branch Chief, NRO/DSEA Chris Cook NRG Technical Lead Ken See NRG Technical Manager Laura Quinn-Willingham NRG Technical Support Kevin Stuart Oak Ridge National Laboratory Technical Support Ellen Smith Oak Ridqe National Laboratory Technical Support Abaigail Maloof Oak Ridge National Laboratory Technical Support Grea Zimmerman Oak Ridae National Laboratory Technical Support David Watson Oak Ridge National Laboratory LOGISTICS:
The audit meetings will be coordinated with OPPD staff.
DELIVERABLES:
The NRG team will develop an audit summary report to convey the audit results. The report will be placed in ADAMS within 90 days of the completion of the final audit session, and will be publicly available.
The information discussed in the audit may be included, fully or in part, in the development of the NRG technical staff's assessment documenting the staff's FHRR review.
If you have any questions, please contact me at (301) 415-6197 or by e-mail at Tekia.Govan@nrc.gov.
Docket No. 50-285
Enclosure:
Audit Plan cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC JLD R/F RidsNRRJLD Resource KSee, NRR CCook, NRO JBowen, NRR RKuntz, NRR ARivera, NRO TGovan, NRR ADAMS Accession No.: ML15125A047 OFFICE NRR/JLD/JHMB/PM NRR/JLD/LA NAME TGovan Slent DATE 05/05/15 05/05/15 Sincerely, IRA/
Tekia V. Govan, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation RidsNrrDorllpl4-1 Resource MShams, NRR LQuinn-Willingham, NRO KErwin, NRO MFranovich, NRR RidsNrrPMFortCalhounResource NRR/JLD/JHMB/BC NRR/JLD/JHMB/PM MShams TGovan 05/06/15 05/07/15 OFFICAL RECORD COPY