|
---|
Category:Annual Operating Report
MONTHYEARLIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-18-0010, 2017 Annual Report2018-04-0202 April 2018 2017 Annual Report ML17122A2762017-05-0202 May 2017 Transmittal of 2016 Annual Report LIC-15-0060, Annual Report for 2014 Loss-of-Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.462015-04-30030 April 2015 Annual Report for 2014 Loss-of-Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46 LIC-14-0130, Decommissioning External Trust Fund - Financial Statements as of and for the Years Ended June 30, 2014 and 2013, and Independent Auditors' Report2014-11-0707 November 2014 Decommissioning External Trust Fund - Financial Statements as of and for the Years Ended June 30, 2014 and 2013, and Independent Auditors' Report ML14108A0442013-12-31031 December 2013 Omaha Public Power District Fort Calhoun Station Unit Radiological Environmental Operating Report for Technical Specification Section 5.94.b January 1, 2013 to December 31, 2013 LIC-13-0056, Annual Report for 2012 Loss-of-Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.462013-04-30030 April 2013 Annual Report for 2012 Loss-of-Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46 ML12121A0062012-04-27027 April 2012 Annual Report for 2011 Loss-of-Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46 LIC-12-0045, 2011 Annual Report for Omaha Public District (OPPD)2012-04-0303 April 2012 2011 Annual Report for Omaha Public District (OPPD) LIC-12-0052, Annual Report for Technical Specification Section 5.9.4a2011-12-31031 December 2011 Annual Report for Technical Specification Section 5.9.4a LIC-11-0029, Annual Report for 2010 Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.462011-04-0606 April 2011 Annual Report for 2010 Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46 LIC-11-0046, Annual Report for Technical Specification Section 5.9.4.a, January 1, 2010 to December 31, 20102010-12-31031 December 2010 Annual Report for Technical Specification Section 5.9.4.a, January 1, 2010 to December 31, 2010 ML11123A1952010-12-31031 December 2010 Fort Calhoun - 2010 Radiological Environmental Operating Report for January 1, 2010 Through December 31, 2010 LIC-10-0027, Ft. Calhoun Station Unit 1 Annual Report for 2009 Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.462010-04-26026 April 2010 Ft. Calhoun Station Unit 1 Annual Report for 2009 Loss of Coolant Accident (Loca)/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46 LIC-10-0021, Omaha Public Power District - 2009 Annual Report2010-04-0202 April 2010 Omaha Public Power District - 2009 Annual Report ML1011706622009-12-31031 December 2009 Annual Report for Technical Specification Section 5.9.4.a, January 1, 2009 to December 31, 2009 ML0912803712009-04-0808 April 2009 Annual Report for Technical Specification Section 5.9.4.a, January 1, 2008 to December 31, 2008 LIC-09-0032, Fort Calhoun, Unit 1, Annual Report for Technical Specification Section 5.9.4.a, January 1, 2008 to December 31, 20082009-04-0808 April 2009 Fort Calhoun, Unit 1, Annual Report for Technical Specification Section 5.9.4.a, January 1, 2008 to December 31, 2008 LIC-09-0026, Annual Report for 2008 Loss (Loca)/Emergency Core Cooling Pursuant to 10 CFR 50.46 of Coolant Accident System (ECCS) Models2009-04-0303 April 2009 Annual Report for 2008 Loss (Loca)/Emergency Core Cooling Pursuant to 10 CFR 50.46 of Coolant Accident System (ECCS) Models ML0712702922006-12-31031 December 2006 Annual Report for Technical Specification Section 5.9.4.a, for January 1, 2006 to December 31, 2006 LIC-06-0044, Annual Report for 2005 Loss of Coolant Accident Loca/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.462006-04-12012 April 2006 Annual Report for 2005 Loss of Coolant Accident Loca/Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46 ML0411901872003-12-31031 December 2003 Omaha Public Power District Fort Calhoun Station Unit 1, Annual Report for Technical Specification Section 5.9.4.a, January 1, 2003 to December 31, 2003. ML0411901862003-12-31031 December 2003 Omaha Public Power District, Fort Calhoun Station Unit No. 1, Radiological Environmental Operating Report Technical Specification 5.9.4.b, 01/01/2003 Through 12/31/2003. 2021-04-29
[Table view] Category:Letter type:LIC
MONTHYEARLIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 LIC-18-0028, Letter of Intent to Submit Request for Additional Partial Site Release2018-10-18018 October 2018 Letter of Intent to Submit Request for Additional Partial Site Release 2024-06-18
[Table view] |
Text
444 South 16th Street Mall Omaha, NE 68102-2247 LIC-15-0060 10 CFR 50.46 April 30, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Fort Calhoun Station (FCS), Unit 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285
Subject:
Annual Report for 2014 Loss-of-Coolant Accident (LOCA)/ Emergency Core Cooling System (ECCS) Models Pursuant to 10 CFR 50.46
References:
- 1. EMF-2328(P)(A), Revision 0, "PWR Small Break LOCA Evaluation Model, S-RELAP5 Based," Framatome ANP, Inc., March 2001
- 2. EMF-2103(P)(A), Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," Framatome ANP, Inc., April 2003.
- 3. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk) Small Break Loss-of-Coolant Accident (SBLOCA) / Emergency Core Cooling System (ECCS) Evaluation Model Change/Error Day Report, dated April 24, 2015 (LIC-15-0059)
In accordance with 10 CFR 50.46(a)(3)(ii), the Omaha Public Power District (OPPD) hereby submits the annual 10 CFR 50.46 summary report for Fort Calhoun Station (FCS), Unit No. 1.
The report provides an update of all identified changes or errors in the LOCA/ECCS codes, methods, and applications. References 1 and 2 respectively are the small break (SB) and realistic large break LOCA analysis methodology used by AREVA (formerly Framatome ANP) for the FCS Analyses of Record (AOR).
A design change to the initial fill gas pressure of new UO2 fuel rods that will be used in the Operating Cycle 28 core is estimated to increase the peak clad temperature (PCT) for the SBLOCA AOR by +31°F. Also, a non-conservatism in AREVAs correlation for vapor absorptivity used in S-RELAP5 was discovered that increased PCT by +23°F in the SBLOCA AOR. These issues are described in Attachment 2 and were reported in Reference 3. provides the 2014 SBLOCA Margin Summary Sheet for FCS. Due to total errors reported in previous years and the +31°F change and +23°F error noted above, the SBLOCA PCT has changed from the baseline value of 1537°F (Updated Safety Analysis Report (USAR)
Section 14.15) to 1800°F. The sum of the absolute values of the changes/errors in the SBLOCA AOR is 471°F.
Two (2) RLBLOCA Analysis 10 CFR 50.46 Model Assessment errors were discovered in 2014.
Each of the two (2) errors and the design change discussed above changed the PCT in the RLBLOCA AOR by +0°F. These issues are described in Attachment 4. Attachment 3 provides the 2014 RLBLOCA Margin Summary Sheet for FCS. Due to total errors reported in previous Employment with Equal Opportunity
U.S. Nuclear Regulatory Commission LIC-15-0060 Page2 years, the two ooF errors discovered in 2014, and the design change, the RLBLOCA PCT has changed from the baseline value of 1636°F (USAR Section 14.15) to 158rF. The sum of the absolute value of the changes/errors in the RLBLOCA AOR is 91 °F.
In summary, the FCS PCT values for the SBLOCA AOR and the RLBLOCA AOR continue to remain significantly less than the 10 CFR 50.46(b)(1) acceptance criterion of 2200°F. OPPD is currently planning to reanalyze the SBLOCA and the RLBLOCA to incorporate the pending AREVA methodology revisions associated with these analyses.
If you should have any questions, please contact Mr. Bill Hansher at (402) 533-6894.
No commitments to the NRC are made in this letter.
L is P. Cortopassi Site Vice President and CNO LPC/SEC/mle Attachments: 1. Small Break LOCA Margin Summary Sheet - Annual Report
- 2. 10 CFR 50.46 Small Break LOCA Model Assessments
- 3. Realistic Large Break LOCA Margin Summary Sheet -Annual Report
- 4. 10 CFR 50.46 Realistic Large Break LOCA Model Assessments c: M. L. Dapas, NRC Regional Administrator, Region IV C. F. Lyon, NRC Project Manager S.M. Schneider, NRC Senior Resident Inspector LIC-15-0060 Page 1 Small Break LOCA Margin Summary Sheet - Annual Report Plant Name: Fort Calhoun Station, Unit No. 1 Utility Name: Omaha Public Power District Evaluation Model: Small Break LOCA Net PCT Absolute Effect (PCT) PCT Effect Prior 10 CFR 50.46 Changes or Error A. +209°F 417°F Corrections-Previous Years Prior 10 CFR 50.46 Changes or Error B. +23°F 23°F Corrections-This Year Prior 10 CFR 50.46 Changes or Error C. +31°F 31°F Corrections-This Year Absolute Sum of 10 CFR 50.46 Changes 471°F The sum of the PCT from the most recent analysis using an acceptable evaluation model and the estimates of the PCT impact for changes and errors identified since that analysis is less than 2200°F.
LIC-15-0060 Page 1 10 CFR 50.46 Small Break LOCA Model Assessments Change to the Vapor Absorptivity Correlation Effect on SBLOCA Analysis The issue was discovered while preparing an update of the BWR LOCA Appendix K methodology using S-RELAP5. The Thermal Hydraulic Test Facility (THTF) level swell assessment for BWRs was reviewed for rod wall temperatures and determined to be non-conservative relative to the data. This observation was unexpected since other assessments showed good or conservative agreement. In AREVA CR 2012-8371, it was determined that the correlation for vapor absorptivity used in S-RELAP5 was being applied outside of its intended range of applicability. The equation used for the absorption coefficient of vapor has the form:
555.56 555.56 1.814 10 1 0.0054 Where Tg is the vapor phase temperature in K, and P is pressure in Pa and is truncated at 1.03x106 Pa (150 psi). The pressure term must be truncated in order to obtain the correct emissivity values for an optically thick steam. The dependency on P and Tg in the absorption coefficient of vapor, and the constant are from the FLECHT SEASET report, which is based on pressure at 10 atm. A simplified pressure relation from Siegel and Howell indicated that the truncation at 150 psi is conservative. There is no lower pressure limit on the vapor absorptivity correlation as the correlation is developed for optically thin gases, which already applies at low pressures.
In order to assess the impact on the current analysis of record for SBLOCA, a developmental version of S-RELAP5 was prepared by AREVA containing the correction to the vapor absorptivity coefficient pressure range. The limiting case and multiple break sizes around the limiting case were rerun with the developmental code version of S-RELAP5. Results determined that limiting the vapor absorptivity correlation to within its intended pressure range allows S-RELAP5 to predict wall temperatures for THTF within the uncertainty bands or above the uncertainty bands, which remains conservative.
The estimated PCT impact of the pressure limit on the vapor absorptivity correlation on the Fort Calhoun SBLOCA AOR is +23°F, resulting in a PCT of 1769°F.
Change to the Initial Fill Gas Pressurization Effect on SBLOCA Analysis The fuel reload campaign for Cycle 28 is implementing a change in the fuel rod fill gas initial pressurization. The change is intended to provide more margin in the reload analysis for internal rod pressure. The initial fill gas pressure of the UO2 fuel rods is being changed from 390 psia to 330 psia. Due to this design change, an evaluation of the existing LOCA AOR is required.
For the SBLOCA analysis, the reduction in fuel rod internal pressure affects the swell and rupture model. The SBLOCA transient is a slow progressing transient with PCT occurring later in the event when compared to the RLBLOCA event. A change in the fuel rod internal pressure affects the timing of rupture of the cladding which could result LIC-15-0060 Page 2 in a change in the PCT time leading to a change in PCT and calculated oxidation.
Therefore, a sensitivity study was performed by AREVA to evaluate the impact on SBLOCA AOR. The limiting case and multiple break sizes around the limiting case were rerun with the reduced internal pressure.
The estimated PCT impact of the change to the initial fill gas pressurization on the Fort Calhoun SBLOCA AOR is +31°F, resulting in a PCT of 1800°F.
LIC-15-0060 Page 1 Realistic Large Break LOCA Margin Summary Sheet - Annual Report Plant Name: Fort Calhoun Station, Unit No. 1 Utility Name: Omaha Public Power District Evaluation Model: Large Break LOCA Net PCT Absolute Effect (PCT) PCT Effect Prior 10 CFR 50.46 Changes or Error A. -49°F 91°F Corrections-Previous Years Prior 10 CFR 50.46 Changes or Error B. 0°F 0°F Corrections-This Year Prior 10 CFR 50.46 Changes or Error C. 0°F 0°F Corrections-This Year Prior 10 CFR 50.46 Changes or Error D. 0°F 0°F Corrections-This Year Absolute Sum of 10 CFR 50.46 Changes 91°F The sum of the PCT from the most recent analysis using an acceptable evaluation model and the estimates of the PCT impact for changes and errors identified since that analysis is less than 2200°F.
LIC-15-0060 Page 1 10 CFR 50.46 Realistic Large Break LOCA Model Assessments Change to the Vapor Absorptivity Correlation Effect on RLBLOCA Analysis The issue was discovered while preparing an update of the BWR LOCA Appendix K methodology using S-RELAP5, where the THTF level swell assessment for BWRs was reviewed for rod wall temperatures and determined to be non-conservative relative to the data.
This observation was unexpected since other assessments showed good or conservative agreement. In AREVA CR 2012-8371, it was determined upon further investigation that the correlation for vapor absorptivity used in S-RELAP5 was being applied outside of its intended range of applicability. The equation used for the absorption coefficient of vapor has the form:
555.56 555.56 1.814 10 1 0.0054 Where Tg is the vapor phase temperature in K, and P is pressure in Pa and is truncated at 1.03x106 Pa (150 psi). The pressure term must be truncated in order to obtain the correct emissivity values for an optically thick steam. The dependency on P and Tg in the absorption coefficient of vapor, and the constant are from the FLECHT SEASET report, which is based on pressure at 10 atm. A simplified pressure relation from Siegel and Howell indicated that the truncation at 150 psi is conservative. There is no lower pressure limit on the vapor absorptivity correlation as the correlation is developed for optically thin gases, which already applies at low pressures.
For RLBLOCA, single phase steam only exists for a very limited time just before the beginning of reflood. During the majority of the blowdown phase and during the entire reflood phase, which are the important RLBLOCA phases, the core is in a dispersed flow regime. The S-RELAP5 methodology uses the FLECHT-SEASET reflood tests to determine the heat transfer bias & uncertainty under these conditions. In addition, the transient progression is very quick and the system depressurizes in the first few seconds after the break opening. Due to the fast depressurization, the amount of time that the correlation for vapor absorptivity used in RLBLOCA is applied outside of the range of applicability is limited and therefore the results predicted in the AOR remain valid.
The estimated PCT impact of the pressure limit on the vapor absorptivity correlation on the Fort Calhoun RLBLOCA AOR is 0°F, resulting in a PCT of 1587°F.
Non-Physical Axial Shapes Generated by the Modal Decomposition Effect on RLBLOCA Analysis The issue was discovered during an evaluation by AREVA on the modal decomposition method which led to a detailed examination of the actual axial shapes that were produced by the modal decomposition procedure. The examination revealed that the modal decomposition procedure creates axial shapes that exhibit super-imposed oscillations leading to non-physical, artificial local peaks and valleys in the shape. When such shapes are generated and used in the LOCA analyses they tend to shift the PCT location toward higher elevations, as well as generate higher or lower PCT values than would normally occur.
LIC-15-0060 Page 2 In the AREVA RLBLOCA methodology, axial shapes are generated in a 24-node format. Two bounding axial shapes are determined and then a 24-node shape is created by interpolating between the two bounding shapes. This 24-node axial must then be mapped to the number of heat structure nodes and elevation points used by S-RELAP5, which is between 40 to 52 nodes.
This is done currently using a process called modal decomposition.
The evaluation for the set of cases and axial shapes applied to Fort Calhoun RLBLOCA AOR shows that the axial shapes mapped using modal decomposition provide a good fit relative to the pre-mapped axial shapes. Therefore, it is concluded that the RLBLOCA AOR remains valid.
The estimated PCT impact of the axial shapes generated using the modal decomposition method on the Fort Calhoun RLBLOCA AOR is 0°F, resulting in a PCT of 1587°F.
Change to the Initial Fill Gas Pressurization Effect on RLBLOCA Analysis The fuel reload campaign for Cycle 28 is implementing a change in the fuel rod fill gas initial pressurization. The change is intended to provide more margin in the reload analysis for internal rod pressure. The initial fill gas pressure of the UO2 fuel rods is being changed from 390 psia to 330 psia. Due to this design change, an evaluation of the existing LOCA AOR is required.
Per the AREVA RLBLOCA methodology applied to the Fort Calhoun AOR, the swell and rupture model is not incorporated on plant specific applications as it is considered a benefit in the PCT calculation. In addition, the relocation phenomenon is not evaluated for Fort Calhoun as the AOR PCT results are below 1850°F and the phenomenon is not significant below this threshold.
Consequently, in the AOR, the PCT is not driven by the rupture node or rupture time and changes in the initial rod pressure do not have an effect on the PCT estimate.
Therefore, it is concluded that the RLBLOCA AOR remains valid and the estimated impact of the Cycle 28 design change on the Fort Calhoun RLBLOCA analysis calculated PCT is 0°F, resulting in a PCT of 1587°F.