1 IPRenewal NPEmails From:
Wentzel, Michael Sent:
Thursday, April 16, 2015 3:16 PM To:
Gray, Dara
Subject:
Telecon Summary Attachments:
041615, Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Environmental Review - Copy.docx
- Dara, Attached is a draft summary for our phone call today. Please let me know if you find anything you have any comments.
- Thanks, Mike Michael Wentzel Project Manager NRR/DLR/RPB2 (301) 415-6459 michael.wentzel@nrc.gov
Hearing Identifier:
IndianPointUnits2and3NonPublic_EX Email Number:
5069 Mail Envelope Properties (C0A338EE37A11447B136119705BF9A3F0288161DC828)
Subject:
Telecon Summary Sent Date:
4/16/2015 3:16:10 PM Received Date:
4/16/2015 3:16:11 PM From:
Wentzel, Michael Created By:
Michael.Wentzel@nrc.gov Recipients:
"Gray, Dara" <DGray@entergy.com>
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 308 4/16/2015 3:16:11 PM 041615, Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Environmental Review - Copy.docx 88497 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
LICENSE FACILITY SUBJEC The U.S.
Operatio clarify the Nuclear G Enclosur discusse Entergy h Docket N Enclosur As stated cc w/enc EE:
Enterg Y:
Indian CT:
SUMM BETW ENTE FOR A NUCL APPL
. Nuclear Re ns, Inc., (En e NRC staff Generating U re 1 provides ed with Enter had an oppo Nos. 50-247 re:
d cl: Listserv NUC gy Nuclear O n Point Nucle MARY OF T WEEN THE U ERGY NUCL ADDITIONA LEAR GENE LICATION EN egulatory Co ntergy)held a s request fo Unit Nos. 2 a s a listing of rgy, including ortunity to co and 50-286 UNIT CLEARREGU WASHING Operations, ear Generat ELEPHONE U.S. NUCLE LEAR OPER AL INFORMA ERATING UN NVIRONME ommission (N a telephone or additional and 3 licens the participa g a brief des omment on t TED STATES ULATORY CO GTON, D.C. 20555 Inc.
ing Unit Nos E CONFERE EAR REGUL RATIONS, IN ATION PERT NIT NOS. 2 NTAL REVI NRC) staff a conference information se renewal a ants and En scription of th this summary Michael We Projects Bra Division of L Office of Nu S
OMMISSION 5-0001
- s. 2 and 3 ENCE CALL LATORY CO NC. CONCER TAINING TO AND 3 LICE EW (TAC N nd represen call on April (RAI) conce pplication en closure 2 co he status.
- y.
entzel, Proje anch 2 License Ren uclear React N
HELD ON A OMMISSION RNING THE O THE INDIA ENSE RENE OS. MD541 ntatives of En 16, 2015,to erning the In nvironmenta ontains a list ct Manager newal tor Regulatio APRIL16, 20 AND E REQUEST AN POINT EWAL 1 AND MD5 ntergy Nucle discuss and dian Point al review.
ing of the RA on
- 015, T
5412) ear d
AIs
- concurrence via e-mail OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME MWentzel BWittick MWentzel DATE
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 16, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC. CONCERNING THE REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NOS. MD5411 AND MD5412)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsOgcMailCenter Resource MWentzel MGray, RI BGrange ABurritt, RI BWittick DonaldJackson, RI DWrona MModes, RI DPickett NSheehan, RI OPA STurk, OGC DScrenci, RI OPA BMizuno, OGC DTifft, RI DRoth, OGC NMcNamara, RI BHarris, OGC GNewman, RI SBurnell, OPA JSStewart, RI DMcIntyre, OPA BPinson, RI JWeil, OCA
ENCLOSURE 1 TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS APRIL16, 2015 PARTICIPANTS:
AFFILIATIONS:
Briana Grange U.S. Nuclear Regulatory Commission (NRC)
Michael Wentzel NRC Rick Buckley Entergy Nuclear Operations, Inc. (Entergy)
Dara Gray Entergy
ENCLOSURE 2 TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION APRIL 16, 2015 The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Entergy Nuclear Operations, Inc., (Entergy)held a telephone conference call on April 16, 2015,to discuss and clarify the following requests for additional information (RAIs) concerning the license renewal application environmental review. The representatives from Entergy stated that they understood what information the NRC staff is requesting.
Request for Additional Information On April 2, 2015, the U.S. Fish and Wildlife Service (FWS) published a final rule (80 FR 17973) that lists the northern long-eared bat (Myotisseptentrionalis) as threatened throughout its range.
The northern long-eared bats range includes Westchester County, New York, in which Indian Point Nuclear Generating Units 2 and 3 (IP2 and IP3) are located. Accordingly, the U.S.
Nuclear Regulatory Commission (NRC) staff intends to address potential effects to this species as part of its IP2 and IP3 license renewal review. The NRC staff requests the following information to assist in its review:
- 1. Provide any information that Entergy Nuclear, LLC (Entergy) has regarding the northern long-eared bats use of the IP2 and IP3 site. Such information may include potential habitat (particularly summer roosting habitat) or other uses of the IP2 and IP3 site by the species, observations of the species on the site, and studies or monitoring performed to document potential presence of the species on the site. The FWSs final rule describes northern long-eared bat habitat in detail.
- 2. Because the Indiana bat (Myotissodalis), a Federally endangered species that was addressed in the NRCs final supplemental environmental impact statement for IP2 and IP3 license renewal, is similar in its habitat requirements to the northern long-eared bat, please provide updated information, if applicable, on the Indiana bats potential use of the IP2 and IP3 site.
- 3. Provide updated information, if applicable, regarding the effects that activities associated with IP2 and IP3 license renewal and refurbishment could have on the northern long-eared bat and Indiana bat. Such activities may include habitat loss, degradation, disturbance, or fragmentation, as well as temporary or permanent increases in noise, vibration, dust, chemical use, lighting, vehicle use, and general levels of human activity during the license renewal term that may result from refurbishment or other site activities.
- 4. Describe the procedures or protocols that Entergy maintains, if any, to ensure that effects to Federally listed bats are appropriately considered prior to site activities, such as hazardous tree removal, landscape maintenance, or other operations activities that could directly or indirectly affect bats.
- 5. Has Entergy observed any injured or dead bats (of any species) on the site, especially near the base of tall buildings and structures? If so, please describe these occurrences and
include the date of observation, species (if known), condition of individual(s), and any follow-up actions that Entergy took as a result of the incident(s).
The Federal Energy Regulatory Commissions final environmental impact statement (FEIS) on the Algonquin Incremental Market (AIM) Project (available at https://www.ferc.gov/
industries/gas/enviro/eis/2015/01-23-15-eis.asp) indicates that acoustic surveys for the northern long-eared bat and Indiana bat detected both species at locations in Westchester County, New York (see FEIS, p. 4-113 and 4-116). As indicated in Entergys March 10, 2015, response to a request for additional information (ADAMS Accession No. ML15089A338), the Algonquin gas pipeline associated with this project would cross a portion of the IP2 and IP3 property. Is Entergy aware of whether the affected portions of the IP2 and IP3 site were surveyed for bats as part of the AIM project? Provide any available information obtained from those surveys concerning the presence or use of the IP2 and IP3 site by the northern long-eared bat.