ML15100A359

From kanterella
Jump to navigation Jump to search
Lr Hearing - Draft RAIs for Northern Long-Eared Bat
ML15100A359
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/09/2015
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML15100A359 (8)


Text

1 IPRenewal NPEmails From:

Wentzel, Michael Sent:

Thursday, April 09, 2015 4:47 PM To:

Gray, Dara

Subject:

Draft RAIs for Northern Long-Eared Bat Attachments:

Draft Indian Point 2015 RAI for Change in Status of Northern Long-Eared Bat.docx

Dara, Attached are RAIs pertaining to the change in status for the northern long-eared bat. After youve had a chance to review, please let me know if you would like to have a phone call to discuss.
Thanks, Mike Michael Wentzel Project Manager NRR/DLR/RPB2 (301) 415-6459 michael.wentzel@nrc.gov

Hearing Identifier:

IndianPointUnits2and3NonPublic_EX Email Number:

5048 Mail Envelope Properties (C0A338EE37A11447B136119705BF9A3F02881532645C)

Subject:

Draft RAIs for Northern Long-Eared Bat Sent Date:

4/9/2015 4:47:07 PM Received Date:

4/9/2015 4:47:08 PM From:

Wentzel, Michael Created By:

Michael.Wentzel@nrc.gov Recipients:

"Gray, Dara" <DGray@entergy.com>

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 384 4/9/2015 4:47:08 PM Draft Indian Point 2015 RAI for Change in Status of Northern Long-Eared Bat.docx 113409 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Vice Pres Entergy N Indian Po 450 Broa P.O. Box Buchana SUBJEC Dear Sir By letter Nuclear R pursuant to renew IP3). Th license re Statemen Decembe correct im regarding Marine F Septemb the final S On April long-eare IP2 and I informati the IP2 a sident, Oper Nuclear Ope oint Energy adway, GSB x 249 an, NY 1051 CT:

REQU INDIA RENE AND M or Madam:

dated April 2 Regulatory C t to Title 10 o the operatin e NRC staff enewal appl nt for Licens er 2010. In mpingement g thermal im Fisheries Ser ber 8, 2014, SEIS to add 2, 2015, the ed bat (Myot IP3 site.The on is necess and IP3 licen NUCL rations erations, Inc Center 1-0249 UEST FOR A AN POINT N EWAL APPL MD5412) 23, 2007, En Commission of the Code ng licenses f documente ication in Su se Renewal o June 2013, and entrain mpacts, and u rvice under s the NRC no ress new inf e U.S. Fish a tisseptentrio NRC staff h sary for the nse renewal UNIT LEARREGU WASHINGT ADDITIONA UCLEAR G LICATION EN ntergy Nucle n (NRC)an a of Federal R for Indian Po d its findings upplement 3 of Nuclear P NRC issued nment data p update the s section 7 of tified Enterg formation ide and Wildlife S onalis) as thr has identified NRC staff to on the north TED STATES ULATORY C TON, D.C. 20555 AL INFORMA ENERATING NVIRONME ear Operatio pplication an Regulations oint Nuclear s related to t 8 to NUREG Plants (GEIS d Volume 4 o presented in status of the the Endang gy of its inten entified sinc Service publ reatened thro d in the attac o complete it hern long-ea S

COMMISSIO 5-0001 ATION FOR G UNIT NOS ENTAL REVI ons, Inc. (Ent nd associate (10 CFR) Pa Generating the environm G-1437, Ge S) (SEIS), w of Suppleme the final SE NRC's cons ered Specie nt to prepare ce June 2013 lished a fina oughout its r ched enclos ts assessme ared bat.

ON THE REVIE S. 2 AND 3, EW (TAC N tergy), subm ed environm art 51 and 1 Unit Nos. 2 mental review neric Enviro which was iss ent 38 to NU EIS, revise co sultation with es Act. By le e a second s

3.

al rule listing range, which ure areas w ent of the pot EW OF THE LICENSE OS. MD541 mitted to the ental report 0 CFR Part and 3 (IP2 a w of Entergy nmental Imp sued in REG-1437 t onclusions h the Nationa etter dated supplement t the northern h includes th where additio tential effect 1

U.S.

54, and ys pact to al to n

he onal ts of Items in the enclosure were discussed with Ms. Dara Gray, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-6459, or by e-mail michael.wentzel@nrc.gov.

Sincerely, Michael Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated cc w/encl: Listserv

  • concurred via email OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME IKing MWentzel BWittick MWentzel DATE

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NOS. MD5411 AND MD5412)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsNrrDraArcb Resource RidsOgcMailCenter Resource MWentzel JWeil, OCA BGrange MGray, RI DLogan ABurritt, RI BWittick DonaldJackson, RI DWrona MModes, RI DPickett NSheehan, RI OPA STurk, OGC DScrenci, RI OPA BMizuno, OGC DTifft, RI DRoth, OGC NMcNamara, RI BHarris, OGC GNewman, RI SBurnell, OPA JSStewart, RI DMcIntyre, OPA BPinson, RI

ENCLOSURE REQUESTS FOR ADDITIONAL INFORMATION RELATED TO INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW On April 2, 2015, the U.S. Fish and Wildlife Service (FWS) published a final rule (80 FR 17973) that lists the northern long-eared bat (Myotisseptentrionalis) as threatened throughout its range.

The northern long-eared bats range includes Westchester County, New York, in which Indian Point Nuclear Generating Units 2 and 3 (IP2 and IP3) are located. Accordingly, the U.S.

Nuclear Regulatory Commission (NRC) staff intends to address potential effects to this species as part of its IP2 and IP3 license renewal review. The NRC staff requests the following information to assist in its review:

1. Provide any information that Entergy Nuclear, LLC (Entergy) has regarding the northern long-eared bats use of the IP2 and IP3 site. Such information may include potential habitat (particularly summer roosting habitat) or other uses of the IP2 and IP3 site by the species, observations of the species on the site, and studies or monitoring performed to document potential presence of the species on the site. The FWSs final rule describes northern long-eared bat habitat in detail.
2. Because the Indiana bat (Myotissodalis), a Federally endangered species that was addressed in the NRCs final supplemental environmental impact statement for IP2 and IP3 license renewal, is similar in its habitat requirements to the northern long-eared bat, please provide updated information, if applicable, on the Indiana bats potential use of the IP2 and IP3 site.
3. Provide updated information, if applicable, regarding the effects that activities associated with IP2 and IP3 license renewal and refurbishment could have on the northern long-eared bat and Indiana bat. Such activities may include habitat loss, degradation, disturbance, or fragmentation, as well as temporary or permanent increases in noise, vibration, dust, chemical use, lighting, vehicle use, and general levels of human activity during the license renewal term that may result from refurbishment or other site activities.
4. Describe the procedures or protocols that Entergy maintains, if any, to ensure that effects to Federally listed bats are appropriately considered prior to site activities, such as hazardous tree removal, landscape maintenance, or other operations activities that could directly or indirectly affect bats.
5. Has Entergy observed any injured or dead bats (of any species) on the site, especially near the base of tall buildings and structures? If so, please describe these occurrences and include the date of observation, species (if known), condition of individual(s), and any follow-up actions that Entergy took as a result of the incident(s).
6. The Federal Energy Regulatory Commissions final environmental impact statement (FEIS) on the Algonquin Incremental Market (AIM) Project (available at https://www.ferc.gov/

industries/gas/enviro/eis/2015/01-23-15-eis.asp) indicates that acoustic surveys for the northern long-eared bat and Indiana bat detected both species at locations in Westchester County, New York (see FEIS, p. 4-113 and 4-116). As indicated in Entergys March 10, 2015, response to a request for additional information (ADAMS Accession No. ML15089A338), the Algonquin gas pipeline associated with this project would cross a portion of the IP2 and IP3 property. Is Entergy aware of whether the affected portions of the IP2 and IP3 site were surveyed for bats as part of the AIM project? Provide any available information obtained from those surveys concerning the presence or use of the IP2 and IP3 site by the northern long-eared bat.