Summary of Meeting Concerning Annual Assessment of Turkey Point Nuclear Plant, Units 3 & 4
ML15086A339
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/27/2015
From: Eric Stamm
NRC/RGN-II/DRP/RPB3
To:
Division Reactor Projects II
References
Download: ML15086A339 (19)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 27, 2015 MEMORANDUM TO: File FROM: Eric Stamm, Chief, (Acting) /RA by Craig Kontz Acting for/

Reactor Projects Branch 3 Division of Reactor Projects

SUBJECT:

PUBLIC MEETING

SUMMARY

- TURKEY POINT NUCLEAR GENERATING STATION DOCKET NOS. 50-250 AND 50-251 On March 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of Turkey Point Nuclear Plant, Units 3 and 4. The purpose of the meeting was to provide opportunities to discuss the annual assessment of Turkey Point with the public for the period of January 1, 2014, through December 31, 2014. Enclosed is a list of attendees and the Turkey Point annual assessment meeting presentation.

The following NRC staff attended the public meeting:

1. Eric Stamm, Chief (Acting), Region II (RII) Reactor Projects Branch 3, Division of Reactor Projects
2. Bradley Davis, RII/DRP, Senior Project Engineer (Acting)
3. Joey Ledford, RII, Public Affairs Officer
4. Tim Hoeg, RII/DRP, Senior Resident Inspector, Turkey Point
5. Matt Endress, RII/DRP, Resident Inspector, Turkey Point
6. Shana Helton, Chief, Plant Licensing Branch II-2, Division of Operating Reactor Licensing, DORL
7. Audrey Klett, Project Manager, Plant Licensing Branch II-2, DORL
8. Candace Pfefferkorn, General Engineer, Plant Licensing Branch II-2, DORL Docket Nos.: 50-250 and 50-251 License No.: DPR-31, DPR-41

Enclosures:

1. List of Attendees
2. Meeting Presentation

Contact:

Mark Riches, RII/DRP 404-997-4531

__ML15086A339______ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE MJR4 EJS NAME M. Riches E. Stamm DATE 3/27/2015 3/27/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO