MONTHYEARML22207A0222022-07-22022 July 2022 NRC-2022-000105 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed RS-20-140, Proposed Changes to Decommissioning Trust Agreements2020-10-30030 October 2020 Proposed Changes to Decommissioning Trust Agreements ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 ML18142A5922018-05-22022 May 2018 Educational and Professional Qualifications, Joseph A. Fischer, Associate, Dames & Moore, Nine Mile Point Nuclear Power Plant, Niagara Mohawk Power Corporation ML18142A5932018-05-22022 May 2018 Harvey W. Graves, Jr., Manger of Nuclear Engineering, Atomic Power Division, Westinghouse Electric Corporation ML15278A0302015-10-0505 October 2015 50 54(p) Review for Ginna ML15114A4022015-04-21021 April 2015 4/21/2015 - Ginna 2014 Annual Assessment Meeting Sign-In Sheet ML15079A4302015-03-11011 March 2015 Enclosure 4: Summary of Regulatory Commitments ML14260A2012015-01-16016 January 2015 Consent and Waiver Form for Confimatory Order Concerning Authorization of Pre-emption Authority ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 ML13323A0832013-11-11011 November 2013 Attachment (1) Responses to Questions 1 and 2 of Request for Additional Information, Attachment (2) Responses to Questions 3 and 4, Request for Additional Information and Attachment (3) 10 CFR 2.390 Affidavit of Westinghouse-CAW-13-3847 ML12089A0292012-03-27027 March 2012 Attachment 1 - Westinghouse LOCA Evaluation Model Changes & Attachment 2 - LBLOCA and SBLOCA Peak Clad Temperature Assessment Sheets ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status RS-11-167, Final Effective Joint Proxy Statement/Prospectus Relating to Application for Approval of Indirect Transfer of Control of Licenses2011-10-11011 October 2011 Final Effective Joint Proxy Statement/Prospectus Relating to Application for Approval of Indirect Transfer of Control of Licenses ML1127100332011-09-28028 September 2011 ROP Tabletop Examples and Results ML1117502192011-06-22022 June 2011 NRC Inspection Findings Related to Closed Cooling Water Systems (1/1/2004 to 6/22/2011) ML1117301402011-06-15015 June 2011 Attachment to E-mail from Alyse Peterson, Ny State Containing Comments on LAR for Cyber Security Plans for Nine Mile Point, Ginna, FitzPatrick, and Indian Point Plants ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0806704192008-03-0707 March 2008 CDBI Findings ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0726901322007-08-24024 August 2007 Handouts to Applicants (Folder 3) ML0712403272007-05-0404 May 2007 Sign-In Sheet - Ginna Annual Assessment Meeting 2006 ML0634705992006-12-14014 December 2006 Plant Service List ML0613700132006-05-0909 May 2006 May 9, 2006, Public Meeting, Ginna, Transcribed Sign-In Sheet ML0416702392004-06-10010 June 2004 R. E. Ginna, Amendment No. 12 to Indemnity Agreement No. B-38 ML0404104922004-02-20020 February 2004 Order EA-03-009 Service List ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML0310503802003-04-0202 April 2003 Ginna Annual Assessment Meeting NRC Public Meeting Feedback Forms ML0310502042003-04-0202 April 2003 Annual Assessment Meeting Sign-In Log ML0309104062003-03-11011 March 2003 Attachment I Comparison of NUREG-0654 to Ginna Nerp, and Proposed Enhancements, Attachment II Evaluattion of NUREG-0654 Basis for on Shift Staffing, Attachment III Evaluation of NUREG-0654 Basis for Timing Staff Augmentation, Attachment IV ML0232600192002-11-0505 November 2002 Ginna'S History: Points Involved at Brookwood, Which Should Be Rememberedint E Years Ahead, by Alexander M. Beebee, Dated April 24, 1967 ML0232600332002-11-0101 November 2002 R. E. Ginna, New York State Department of Environmental Conservation, Notice of Complete Application, Modification to State Pollutant Discharge Elimination System Permit ML18190A3441978-10-0303 October 1978 R. E. Ginna - 10/03/1978 Bill of Material Airtight and Pressure Resistant Doors and Frames ML18186A1291972-08-15015 August 1972 R. E. Ginna, Unit 1 - Technical Supplement Accompanying Application for a Full-Term Operating License, August 1972 2022-07-22
[Table view] |
Text
Enclosure 4
SUMMARY
OF REGULATORY COMMITMENTS The following table identifies commitments made in this document. (Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.)
COMMITTED COMMITMENT TYPE COMMITMENT DATE OR One-Time Action Programmatic "OUTAGE" (Yes/No) (YeslNo)
The Ginna design basis flood does not March 12, 2017 Yes No bound the reevaluated hazard for all flood-causing mechanisms and combined-effect floods. Specifically, local intense precipitation, probable maximum flooding in streams and rivers, and combined-effect flood combinations H.1 and H.4.2 were not bounded by the design basis flood hazard. Therefore, Ginna plans to prepare a full Integrated Assessment (Scenario 4).
Page 1 of 2
Enclosure 4: Ginna - Flood Hazard Reevaluation Report Interim Action Commitments*
("Commitments" are bolded header columns)
Commitment Commitment Interim Actions Taken or Planned to Take Implementation Type Type Item Interim in tae RePlato Te Report Additional Date Number as Included in the Reevaluation Report Reference Information (Committed* One-Time Programmatic*
(Commitment*) Date or Outage) Action*
(Yes/No) (Yes/No) 1 Provided for Aquafence installation in the Report Provides Complete Yes No Turbine Building around the Battery Rooms Cover Letter protection and Diesel Generator Rooms to increase Section d. from PMF and flood protection height. Aquafence is a combined-portable barrier system that is installed prior effects floods to an impending flood per GMM-23 FLOODBARRIER, "Flood Barrier Installation and Removal in Turbine Building Basement" (Reference (14)).
- 2. Revised ER-SC.2, "High Water (Flood) Plan," Report Provides Complete Yes No (Reference (15)) to shutdown prior to an Cover Letter protection impending flood (Level 2 flood condition), and Section d. from PMF and install flood barriers in the Auxiliary Building combined-ground level doorways. effects floods
- 3. Purchased dewatering pumps to remove Report Provides Complete Yes No water from structures. Dewatering pumps are Cover Letter protection staged in the Auxiliary Building and inside the Section d. from PMF and Aquafence barriers at Level 1 flood condition combined-per ER-SC.2. effects floods
- 4. Reinforce the Auxiliary Building Block Wall to Report Provides June 30, 2016 Yes No protect safe-shutdown equipment in the Cover Letter protection Auxiliary Building from the new flood height. Section d. from PMF and combined-effects floods Page 2 of 2