ML15077A015

From kanterella
Jump to navigation Jump to search
April 9, 2015, Notice of Open House Meeting with Entergy Nuclear Palisades, LLC, on Palisades Nuclear Plant to Discuss Nrc'S Regulation of Radioactive Materials in Non-Nuclear Reactor Applications
ML15077A015
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/18/2015
From: Eric Duncan
Region 3 Branch 3
To:
References
Download: ML15077A015 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 March 18, 2015 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: Entergy Nuclear Palisades, LLC Name of Facility: Palisades Nuclear Plant Docket No.: 50-255 Date and Time of Meeting: Thursday, April 9, 2015 Open House from 5:00-6:00 p.m. EDT Palisades End-of-Cycle Performance Discussion 6:00-8:00 p.m. EDT Location of Meeting: Beach Haven Event Center 10420 M-140 South Haven, MI 49090 Purpose of Meeting: The Open House portion of the meeting will provide a forum where U.S. Nuclear Regulatory Commission (NRC) staff will be available to discuss agency activities and nuclear power issues with the public. During the Open House, the NRC staff will be available to discuss issues specific to Palisades, including a recent license amendment request (LAR) associated with pressurized thermal shock (PTS), a White finding in the area of radiation protection identified in the fourth quarter of 2014, and the results of an assessment of the Safety Conscious Work Environment (SCWE) in the Security department. As part of a public outreach effort, The Division of Nuclear Materials Safety (DNMS) will also be on hand at the Open House to discuss the NRCs regulation of radioactive materials in non-nuclear reactor applications.

CONTACT: Jay Lennartz 630-829-9806 Jay.Lennartz@nrc.gov

Notice of Significant Licensee Meeting During the Palisades End-of-Cycle performance discussion, the NRC will discuss the 2014 annual assessment results for Palisades Nuclear Plant. The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.

Meeting Category: The Palisades End-of-Cycle performance discussion is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion of the meeting and before the meeting is adjourned. Interested members of the public can participate in this meeting via a toll-free teleconference. For details please call Jay Lennartz at 630-829-9806; or email Jay.Lennartz@nrc.gov by April 3, 2015.

NRC Attendees:

J. Giessner, Deputy Director, Division of Reactor Projects E. Duncan, Chief, Branch 3, Division of Reactor Projects J. Rankin, Project Manager, Office of Nuclear Reactor Regulation A. Garmoe, Senior Resident Inspector, Palisades A. Scarbeary, Resident Inspector, Palisades J. Cassidy, Senior Health Physicist, Division of Reactor Safety B. Dickson, Branch Chief, Health Physics and Incident Response Branch M. Kirk, Senior Materials Engineer, Component Integrity Branch P. Purtscher, Materials Engineer, Vessels & Internals Integration Branch G. Hansen, Physical Security Inspector, Division of Reactor Safety J. Heck, Regional Attorney, Office of General Counsel Others as designated Licensee Attendees:

A. Vitale, Site Vice President A. Williams, General Manager of Plant Operations Others as designated The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille,

Notice of Significant Licensee Meeting large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 3, 2015, via telephone to the NRC meeting contact.

Approved by: /RA/___________________

Eric R. Duncan, Chief Branch 3 Division of Reactor Projects

Notice of Significant Licensee Meeting large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 3, 2015, via telephone to the NRC meeting contact.

Approved by: /RA/___________________

Eric R. Duncan, Chief Branch 3 Division of Reactor Projects DISTRIBUTION:

Kimyata Morgan Butler, Region III Coordinator, OEDO Allen Howe, Deputy Director, Division of Inspection and Regional Support, NRR RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource Anne Boland, Director, Division of Reactor Projects, RIII John Giessner, Deputy Director, Division of Reactor Projects, RIII Kenneth OBrien, Director, Division of Reactor Safety, RIII Mohammed Shuaibi, Deputy Director, Division of Reactor Safety, RIII Eric Duncan, DRP Branch Chief Alex Garmoe, SRI April Scarbeary, SRI DRS Branch Chiefs:

Robert Daley Billy Dickson Richard Skokowski David Hills Hironori Peterson Christine Lipa Allan Barker, Regional State Liaison Officer, RIII Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil, RIII Public Affairs Jim Clay, ORA Carmen Olteanu, ORA Marjorie Zerth, DRP ADAMS Accession Number: ML15077A015 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME ASchwab:mt EDuncan DATE 03/17/15 03/18/15 OFFICIAL RECORD COPY