1 DiabloCanyonNPEm Resource From:
Wentzel, Michael Sent:
Monday, March 09, 2015 4:27 PM To:
Terrence Grebel (TLG1@pge.com)
Subject:
Draft Phone Call Summary Attachments:
030415, Summary of Telephone Conference Call Held Between NRC and PG&E Concerning the Diablo Canyon LRA review.docx
- Terry, Attached is a draft phone call summary from our meeting last week. Please let me know if you have any comments.
- Thanks, Mike Michael Wentzel Project Manager NRR/DLR/RPB2 (301) 415-6459 michael.wentzel@nrc.gov
Hearing Identifier:
DiabloCanyon_LicenseRenewal_NonPublic Email Number:
3115 Mail Envelope Properties (C0A338EE37A11447B136119705BF9A3F0288112C4057)
Subject:
Draft Phone Call Summary Sent Date:
3/9/2015 4:26:54 PM Received Date:
3/9/2015 4:26:57 PM From:
Wentzel, Michael Created By:
Michael.Wentzel@nrc.gov Recipients:
"Terrence Grebel (TLG1@pge.com)" <TLG1@pge.com>
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 304 3/9/2015 4:26:57 PM 030415, Summary of Telephone Conference Call Held Between NRC and PG&E Concerning the Diablo Canyon LRA review.docx 85126 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
LICENSE FACILITY SUBJEC The U.S.
Electric C discuss t applicatio By letters additiona renewal a noted in changes Recomm technical managem Pressuriz planned Having p stated th applicatio February applicatio NRC staf renewal a participa EE:
Pacific Y:
Diablo CT:
SUMM BETW GAS A POWE
. Nuclear Re Company (P the status of on (LRA).
sdatedDece al information application, its February to the DCPP mendation 2.
l items requi ment progra zed Water R to be provid provided the at it expects on. The NR y 2015 updat on, as appro ff will evalua application a nts.
NUC c Gas and E o Canyon Nu MARY OF T WEEN THE U AND ELECT ER PLANT, egulatory Co PG&E or the f the Diablo C mber 22, 20 n necessary as requeste y 25, 2015 le P SAMA ana 1 seismic ha red to be co m and assoc Reactor Inter ed to the sta information s that the NR C staff agre tes is sufficie opriate, pend ate the resou and issue a UNIT CLEARREGU WASHING Electric Com uclear Powe ELEPHONE U.S. NUCLE TRIC COMP UNITS 1 AN ommission (N applicant) h Canyon Pow 014, and Feb y for the NRC ed by the NR etter, PG&E alysis resulti azard re-eva ompleted for ciated imple rnals Inspect aff in Decem in its Decem RC staff willc ed that the i ent to contin ding submitta urces necess schedule on TED STATES ULATORY CO GTON, D.C. 20555 pany er Plant, Unit E CONFERE EAR REGUL PANY CONC ND 2, LICEN NRC) staff a elda telepho wer Plant Un bruary, 25, 2 C staff to com RC in our lett intends to su ing from the aluation. Add the DCPP r ementation o tion and Eva mber 2015.
mber 2014 a continue its r nformation p nue its review al of the outs sary to comp nce complete S
OMMISSION 5-0001 ts 1 and 2 ENCE CALL LATORY CO CERNING TH NSE RENEW nd represen one conferen nits 1 and 2 (
2015,PG&E p mplete its re ter to PG&E ubmit in Jun Fukushima ditionally, PG reactor vess of the Mater aluation Guid nd February review of the provided in t w of the DCP standing item plete the rev
- e. Enclosure N
HELD ON M OMMISSION HE DIABLO WAL APPLIC ntatives of Pa nce call on M (DCPP) licen provided mo eview of the dated July 3 e 2015 an e Near-Term G&E stated el internals a rials Reliabili delines (MR y 2015 upda e DCPP licen the Decemb PP license r ms identified view of the D e 1 provides MARCH 4, 2 AND PACIF CANYON CATION acific Gas a March 4, 201 nse renewal ost of the DCPP licens 3, 2015. As evaluation of Task Force that the aging ity Program:
P-227-A), a tes, PG&E nse renewal er 2014 and enewal d above. Th DCPP license s a listing of
- 2015, FIC nd 15, to se f any are d
e e
the
The applicant had an opportunity to comment on this summary.
Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosures:
As stated cc w/encls: Listserv
The applicant had an opportunity to comment on this summary.
Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosures:
As stated cc w/encls: Listserv DISTRIBUTION:
See next page ADAMS Accession Number:
OFFICE LA:DLR*
PM: RPB2:DLR PM: RPB1:DLR BC:RPB1:DLR NAME MWentzel RPlasse YDiaz DATE OFFICE BC:RPB2:DLR PM:RPB2:DLR NAME BWittick MWentzel DATE OFFICIAL RECORD COPY
ENCLOSURE 1 TELEPHONE CONFERENCE CALL DIABLO CANYON POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS MARCH 4, 2015 PARTICIPANTS:
AFFILIATIONS:
Yoira Diaz U.S. Nuclear Regulatory Commission (NRC)
Yosef Lindell NRC Rick Plasse NRC Michael Wentzel NRC Brian Wittick NRC Al Bates Pacific Gas and Electric Company (PG&E)
Terry Grebel PG&E Jerl Strickland PG&E
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MARCH 4, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING THE DIABLO CANYON POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsOgcMailCenter Resource RidsNrrPMDiabloCanyon Resource MWentzel BWittick RPlasse YDiaz-Sanabria SLingam SUttal, OGC JLindell, OGC EWilliamson, OGC THipschman, SRI JReynoso, RI GMiller, RIV NOKeefe, RIV DMcIntyre, OPA VDricks, OPA WMaier, RIV JWeil, OCA RRihm, EDO