ML15068A406

From kanterella
Jump to navigation Jump to search
Lr - Draft Phone Call Summary
ML15068A406
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/09/2015
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML15068A406 (7)


Text

DiabloCanyonNPEm Resource From: Wentzel, Michael Sent: Monday, March 09, 2015 4:27 PM To: Terrence Grebel (TLG1@pge.com)

Subject:

Draft Phone Call Summary Attachments: 030415, Summary of Telephone Conference Call Held Between NRC and PG&E Concerning the Diablo Canyon LRA review.docx

Terry, Attached is a draft phone call summary from our meeting last week. Please let me know if you have any comments.
Thanks, Mike Michael Wentzel Project Manager NRR/DLR/RPB2 (301) 415-6459 michael.wentzel@nrc.gov 1

Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 3115 Mail Envelope Properties (C0A338EE37A11447B136119705BF9A3F0288112C4057)

Subject:

Draft Phone Call Summary Sent Date: 3/9/2015 4:26:54 PM Received Date: 3/9/2015 4:26:57 PM From: Wentzel, Michael Created By: Michael.Wentzel@nrc.gov Recipients:

"Terrence Grebel (TLG1@pge.com)" <TLG1@pge.com>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 304 3/9/2015 4:26:57 PM 030415, Summary of Telephone Conference Call Held Between NRC and PG&E Concerning the Diablo Canyon LRA review.docx 85126 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

UNIT TED STATES S NUCCLEARREGU ULATORY CO OMMISSION N WASHINGGTON, D.C. 205555-0001 LICENSE EE: Pacific c Gas and Electric E Company FACILITY Y: Diabloo Canyon Nu uclear Powe er Plant, Unitts 1 and 2 SUBJEC CT: SUMM MARY OF TELEPHONE E CONFERE ENCE CALL HELD ON MARCH M 4, 2015, 2

BETW WEEN THE U.S. U NUCLE EAR REGUL LATORY CO OMMISSION AND PACIF FIC GAS AND A ELECT TRIC COMP PANY CONC CERNING TH HE DIABLO CANYON POWE ER PLANT, UNITS 1 AN ND 2, LICEN NSE RENEW WAL APPLIC CATION The U.S.. Nuclear Re egulatory Co ommission (N NRC) staff and represen ntatives of Pa acific Gas and Electric Company C PG&E or the applicant) helda telepho (P one conferen nce call on March M 4, 201 15, to discuss the t status off the Diablo Canyon C Powwer Plant Un nits 1 and 2 (DCPP)

( licen nse renewal applicatioon (LRA).

By letterssdatedDecember 22, 20 014, and Feb bruary, 25, 2015,PG&E 2 p provided moost of the additionaal informationn necessaryy for the NRC C staff to com mplete its re eview of the DCPP licensse renewal application, a as requesteed by the NR RC in our lettter to PG&E dated July 3, 3 2015. As noted in its February y 25, 2015 leetter, PG&E intends to su ubmit in June 2015 an evaluation e off any changes to the DCPP P SAMA ana alysis resultiing from the Fukushima Near-Term Task Force Recomm mendation 2.1 seismic ha azard re-eva aluation. Add ditionally, PGG&E stated that the technicall items required to be co ompleted for the DCPP reactorr vessel internals aging a

managem ment program and assocciated imple ementation of o the Materrials Reliabiliity Program:

Pressurizzed Water Reactor R Interrnals Inspecttion and Eva aluation Guid delines (MRP-227-A), are a planned to be provided to the sta aff in Decemmber 2015.

Having provided p the information in its Decem mber 2014 and Februaryy 2015 updates, PG&E stated that it expectss that the NRRC staff willccontinue its review r of thee DCPP licen nse renewal applicatioon. The NRC staff agreed that the information providedp t December 2014 and in the d Februaryy 2015 updattes is sufficie ent to contin nue its review w of the DCP PP license renewal applicatioon, as approopriate, pend ding submitta al of the outsstanding item ms identifiedd above. The NRC stafff will evaluaate the resou urces necesssary to comp plete the revview of the DCPP D license e renewal application a and a issue a schedule on nce complete e. Enclosure e 1 providess a listing of the participants.

The applicant had an opportunity to comment on this summary.

Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encls: Listserv

The applicant had an opportunity to comment on this summary.

Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encls: Listserv DISTRIBUTION:

See next page ADAMS Accession Number:

OFFICE LA:DLR* PM: RPB2:DLR PM: RPB1:DLR BC:RPB1:DLR NAME MWentzel RPlasse YDiaz DATE OFFICE BC:RPB2:DLR PM:RPB2:DLR NAME BWittick MWentzel DATE OFFICIAL RECORD COPY

TELEPHONE CONFERENCE CALL DIABLO CANYON POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS MARCH 4, 2015 PARTICIPANTS: AFFILIATIONS:

Yoira Diaz U.S. Nuclear Regulatory Commission (NRC)

Yosef Lindell NRC Rick Plasse NRC Michael Wentzel NRC Brian Wittick NRC Al Bates Pacific Gas and Electric Company (PG&E)

Terry Grebel PG&E Jerl Strickland PG&E ENCLOSURE 1

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MARCH 4, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING THE DIABLO CANYON POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsOgcMailCenter Resource RidsNrrPMDiabloCanyon Resource MWentzel BWittick RPlasse YDiaz-Sanabria SLingam SUttal, OGC JLindell, OGC EWilliamson, OGC THipschman, SRI JReynoso, RI GMiller, RIV NOKeefe, RIV DMcIntyre, OPA VDricks, OPA WMaier, RIV JWeil, OCA RRihm, EDO