Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2014001 and 05000499/2014001)
ML15063A539
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/04/2015
From: O'Keefe N F
NRC/RGN-IV/DRP/RPB-B
To: Koehl D L
South Texas
N. O'Keefe
References
IR 2014001
Download: ML15063A539 (4)


See also: IR 05000498/2014001

Text

March 4, 2015

Mr. Dennis President and CEO/CNO STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483

SUBJECT: ANNUAL ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2014001 AND 05000499/2014001)

Dear Mr. Koehl:

On February 17, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, South Texas Project Electric Generating Station, Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at South Texas Project Electric Generating Station, Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1141 with any questions you have regarding this letter.

Sincerely,/RA/

Neil F. O'Keefe, Chief Project Branch B Division of Reactor Projects Docket: 50-498; 50-499 License: NPF-76; NPF-80

Enclosure:

South Texas Project Electric Generating Station, Units 1 and 2 Inspection/Activity Plan Page 1 of 202/26/201519:47:25Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan03/01/2015-06/30/2016EXAM-INITIAL OPERATOR EXAM61 INITIAL EXAM STP UNIT 1 (9/2015)X0255408/24/201508/28/2015 2 INITIAL EXAM STP UNIT 2 (9/2015)X0255508/24/201508/28/20151 INITIAL EXAM STP UNIT 1 (9/2015)X0255409/28/201510/09/2015 2 INITIAL EXAM STP UNIT 2 (9/2015)X0255509/28/201510/09/2015RS 13 PI-RADIATION SAFETY21, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0104/13/201504/17/20151, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/13/201504/17/20151, 2 IPOccupational Exposure Control Effectiveness71151-OR0104/13/201504/17/20151, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0104/13/201504/17/201571111.08-INSERVICE INSPECTION 2R171 2 IPInservice Inspection Activities - PWR7111108P04/13/201504/24/2015EB1-17T-STP PERMANENT PLANT MODS & 50.5951, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/01/201506/05/20151, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/15/201506/19/2015ISFSI-PAD POUR INSPECTION (ONE WEEK VISIT)11 IPOperation Of An ISFSI6085507/01/201507/31/2015RS 24-RADIATION SAFETY21, 2 IPOccupational ALARA Planning and Controls71124.0208/03/201508/07/20151, 2 IPOccupational Dose Assessment71124.0408/03/201508/07/2015EB1-07T-STP TRIENNIAL HEAT SINK PERFORMANCE11, 2 IPHeat Sink Performance7111107T08/10/201508/14/2015INSP-OPERATOR REQUAL INSPECTION31, 2 IPLicensed Operator Requalification Program7111111B09/14/201509/18/201571111.08-INSERVICE INSPECTION 1R1911 IPInservice Inspection Activities - PWR7111108P10/12/201510/23/2015EP-1-BIENNIAL EP PROGAM INSPECTION11, 2 IPAlert and Notification System Testing711140211/16/201511/20/20151, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140311/16/201511/20/20151, 2 IPEmergency Action Level and Emergency Plan Changes711140411/16/201511/20/20151, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/16/201511/20/2015EP-2-EP PERFORMANCE INDICATORS11, 2 IPDrill/Exercise Performance71151-EP0111/16/201511/20/20151, 2 IPERO Readiness71151-EP0211/16/201511/20/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 202/26/201519:47:25Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan03/01/2015-06/30/2016EP-2-EP PERFORMANCE INDICATORS11, 2 IPAlert & Notification System Reliability71151-EP0311/16/201511/20/2015EB1-21T-STP COMPONENT DESIGN BASIS INSPECTION61, 2 IPComponent Design Bases Inspection711112101/25/201602/26/2016ISFSI-DRY RUN INSPECTION (MULTIPLE VISITS)1 2 IPOperation Of An ISFSI6085503/01/201605/30/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.