ML15056A227

From kanterella
Jump to navigation Jump to search
(Vnc) Organization Change. Effective February 26, 2015, Mr. Earl Saito Is No Longer the Site Safety and Regulatory Compliance Manager and Mr. Mark Leik Has Assumed Full Responsibility and Authority Defined for This Position
ML15056A227
Person / Time
Site: Vallecitos Nuclear Center, 07000754, Vallecitos
Issue date: 02/27/2015
From: Caine T
GE-Hitachi Nuclear Energy Americas, Vallecitos
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
TAC 15-004
Download: ML15056A227 (2)


Text

GE Hitachi Nuclear Energy Thomas A. Caine Site Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 USA T 925 862 4344 F 815 953 8211 Thomas.caine@ge.com TAC 15-004 February 27, 2015 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Reactor Regulation Washington, DC 20555-0001 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001

Subject:

Vallecitos Nuclear Center (VNC) Organization Change

References:

1 - License TR-1, Docket 50-70 (GETR) 2 - License DR-10, Docket 50-183 (EVESR) 3 - License DPR-1, Docket 50-18 (VBWR) 4 - License R-33, Docket 50-73 (NTR) 5 - SNM 960, Docket 70-754 Pursuant to the Technical Specifications requirements of References 1 and 4 this 30-day report is being provided regarding a personnel change for the Site Safety and Regulatory Compliance Manager, Vallecitos Nuclear Center. Specifically, License TR-1 Docket 50-70 (GETR), Technical Specification (6.6.2.2.a) requires issuance of a thirty day report for permanent changes in the facility organization involving Level 1-2 personnel while License R-33 Docket 50-73 Technical Specification (6.6.2.b) requires a written report within 30 days to the NRC following permanent changes in the facility organization involving Level 2 or Level 3 management.

Effective February 26, 2015, Mr. Earl Saito is no longer the Site Safety and Regulatory Compliance Manager, Vallecitos Nuclear Center and Mr. Mark Leik has assumed full responsibility and authority defined for this position. For this assignment, Mr. Leik will be located at the VNC site.

References 2, 3, and 5 do not contain specific requirements of this nature, but are reported here for completeness.

U.S. NRC February 27, 2015 If you have any questions in the above matters, please contact me at 925-862-4344.

Sincerely, Thomas A. Caine, Site Manager Vallecitos Nuclear Center Commitments: None cc:

Jack Parrott-NRC, NMSS Project Manager Duane Hardesty-NRC, NRR Project Manager Breeda Reilly-NRC, NMSS Project Manager Ray Kellar-NRC RIV Rob Evans-NRC RIV