EN-15-004, Issuance of Notice of Violation and Final Significance Determination of White Finding, Diablo Canyon, NRC Emergency Preparedness Inspection Report 05000275/2015502 and 05000323/2015502 (EA-14-010)
ML15037A274
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/06/2015
From: Nick Hilton
NRC/OE
To:
Pacific Gas & Electric Co
Faria C
References
EA-14-010, EN-15-004
Download: ML15037A274 (2)


See also: IR 05000275/2015502

Text

February 6, 2015

EN 15-004

OFFICE OF ENFORCEMENT

NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION

Licensee:

Pacific Gas and Electric Company

EA-14-010

Diablo Canyon Power Plant

Docket No. 50-275; 50-323

Subject:

ISSUANCE OF NOTICE OF VIOLATION AND FINAL SIGNIFICANCE

DETERMINATION OF WHITE FINDING

This is to inform the Commission that a Notice of Violation (NOV) will be issued on or

about February 11, 2015, to Pacific Gas and Electric Company (the licensee), for a

Severity Level (SL) III violation associated with a White Significance Determination

Process finding. This White finding, an issue with low to moderate significance to safety,

will require additional NRC inspections. The finding involves a change to the emergency

plan which decreased the effectiveness of the emergency plan. Specifically, on

November 4, 2005, without approval from the NRC, the licensee removed instructions in

emergency plan implementing procedures for making protective action

recommendations for members of the public on the ocean within the 10-mile emergency

planning zone, decreasing the plans effectiveness. Using the examples in Table 5.10-1,

Significance Examples § 50.47(b)(10), of Appendix B to Inspection Manual Chapter 0609, "Emergency Preparedness Significance Determination Process," the inspectors

concluded that this finding represents a degradation of the licensees risk-significant

planning standard function.

A SLIII NOV is included based on the failure to meet the requirements of 10 CFR

50.54(q) by failing to apply and receive approval from the Commission for a proposed

change that decreased the effectiveness of the approved emergency plan.

The NRC issued a preliminary White finding to the licensee for this issue on

December 1, 2014. As a result, a Regulatory Conference was held on January 14,

2015, to discuss this issue. After considering the information developed during the

inspection and the additional information Diablo Canyon Power Plant staff provided at

the regulatory conference, the NRC has concluded that the violation is appropriately

characterized as Severity Level III, and that the associated finding is appropriately

characterized as White with low to moderate safety significance.

CONTACTS: Carolyn Faría, OE/EB

Nick Hilton, OE/BC

301-415-4050

301-415-3055

- 2 -

It should be noted that the licensee has not been specifically informed of the

enforcement action. The schedule of issuance and notification is:

Mailing of Final Significance Determination

February 11, 2015

Telephone Notification of Licensee

February 11, 2015

The State of California will be notified.

DISTRIBUTION: EN-15-004, February 6, 2015

OWFN

OWFN

TWFN

Regional Offices

Chairman Burns

Comm. Svinicki

Comm. Ostendorff

Comm. Baran

SECY

OCA

OPA

OIP

EDO

DEDR

DEDMRS

OE

OGC

NRR

OI

OIG

OCFO

OP CENTER

OIS

RES

ACRS

NMSS

NRO

3WFN

NSIR

NMSS

RI RII

RIII RIV

MAIL

ADAMS

OE staff

DISTRIBUTION:

PHolahan

BKahler

SLaVie

SCoker

EN Binder

ADAMS Accession Number: ML15037A274

OFFICE

OE:ES

OE:BC

NAME

CFaria

NHilton

DATE

2/2/2015

2/6/2015

OFFICIAL RECORD COPY