ML15035A241

From kanterella
Jump to navigation Jump to search
Order (Ruling on Joint Proposed Transcript Corrections)
ML15035A241
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/04/2015
From: Paul Ryerson
Atomic Safety and Licensing Board Panel
To:
SECY RAS
References
50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01, RAS 27170
Download: ML15035A241 (6)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

Paul S. Ryerson, Chairman Nicholas G. Trikouros Dr. Gary S. Arnold In the Matter of Docket No. 50-275-LR Docket No. 50-323-LR PACIFIC GAS & ELECTRIC COMPANY ASLBP No. 10-900-01-LR-BD01 (Diablo Canyon Nuclear Power Plant, Units 1 and 2) February 4, 2015 ORDER (Ruling on Joint Proposed Transcript Corrections)

On January 21, 2015 the Licensing Board heard oral argument concerning two petitions submitted by Friends of the Earth (FoE) regarding an application by Pacific Gas & Electric Company (PG&E) to renew its operating licenses for two nuclear power reactors at the Diablo Canyon Nuclear Power Plant.1 On January 30, 2015, FoE, PG&E, and the Nuclear Regulatory Commission Staff jointly submitted a motion to revise and incorporate proposed corrections to the transcript of the oral argument.2 After reviewing the transcript and the parties joint proposed corrections, the Board grants the motion in part. The Board adopts all corrections as proposed with the exception of a proposed correction to page 684, line 8, which did not appear on that page. The adopted 1

Transcript of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Jan. 21, 2015) (ADAMS Accession No. ML15026A130).

2 See Joint Proposed Transcript Corrections (Jan. 30, 2015).

corrections are set forth in Appendix A to this order, and the transcript is deemed revised accordingly.

It is so ORDERED.

FOR THE ATOMIC SAFETY AND LICENSING BOARD

/RA/

Paul S. Ryerson, Chairman ADMINISTRATIVE JUDGE Rockville, Maryland February 4, 2015

Appendix A Corrections to the Transcript for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 January 21, 2015 Oral Argument PAGE LINE ORIGINAL TEXT REVISED TEXT 669 21 to from 671 22 plan plant 673 20 contingents contentions 680 17 That The 684 6 pos-Fukushima post-Fukushima 687 2 which when 688 5 2309(f)(13) 2.309(f)(1)(iii) 689 19 CLI 01-1754 NC 3 and 9 CLI-01-17 54 NRC 3 at 9 691 5 time limited and aging analyses time-limited aging analyses 692 4-5 It did conclude that the licensing It did not conclude that the basis was exceeded licensing basis was exceeded 693 9 As counsel of PG&E, Ive just As counsel for PG&E just described the issues described, the issues 695 8 heart of that Hardebeck 703 21, 23 Mr. Lindell Mr. Repka 705 7 defacto de facto 705 23 us this 706 21 our our 707 6 bout about 709 16 , can , can 710 7 extend extent 711 1 defacto de facto 712 4, 7 Mr. Lindell Mr. Repka 712 21 SSC SSE 715 17, 18 SCR SER 719 4 Fukushima Fukushima 719 20 Ayers Repka 723 6 and and 730 11 in and 734 16 possible possibly 734 20 based based 737 6 shows does not show 738 10 in is

739 1 reseasons revisions 740 2 where were 740 7 the they 740 24 that that 742 19 regulation the regulation 753 11 and artfully inartfully 753 15 rift risk 755 2 at that 756 13 from for 757 24 that that that the change 758 12 affect effect 760 25 for with 761 20 USFSAR UFSAR 764 13 changed changes 765 6 he the 767 9 of or 779 8 this the 784 8 deal within deal with in 789 8 could I could 789 14 thee the 790 3 drill RIL

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

PACIFIC GAS & ELECTRIC COMPANY ) Docket Nos. 50-275-LR and 50-323-LR

)

(Diablo Canyon Nuclear Power Plant, )

Units 1 and 2) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing ORDER (Ruling on Joint Proposed Transcript Corrections) have been served upon the following persons by the Electronic Information Exchange.

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Office of the General Counsel Mail Stop: T-3F23 Mail Stop: O-15D21 Washington, DC 20555-0001 Washington, DC 20555-0001 Paul S. Ryerson, Chair Edward L. Williamson, Esq.

Administrative Judge E-mail: edward.williamson@nrc.gov E-mail: paul.ryerson@nrc.gov Beth Mizuno, Esq.

E-mail: beth.mizuno@nrc.gov Nicholas G. Trikouros Susan Uttal, Esq.

Administrative Judge E-mail: susan.uttal@nrc.gov E-mail: nicholas.trikouros@nrc.gov Catherine Kanatas, Esq.

E-mail: catherine.kanatas@nrc.gov Gary S. Arnold Joseph Lindell, Esq.

Administrative Judge E-mail: joseph.lindell@nrc.gov E-mail: gary.arnold@nrc.gov John Tibbetts, Paralegal E-mail: john.tibbetts@nrc.gov Alana Wase, Law Clerk E-mail: alana.wase@nrc.gov OGC Mail Center E-mail: OGCMailCenter@nrc.gov U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the Secretary of the Commission Mail Stop: O-16C1 Mail Stop: O-16C1 Washington, DC 20555-0001 Washington, DC 20555-0001 OCAA Mail Center Hearing Docket E-mail: ocaamail@nrc.gov E-mail: hearingdocket@nrc.gov

2 Diablo Canyon Nuclear Power Plant - Docket Nos. 50-275-LR and 50-323-LR ORDER (Ruling on Joint Proposed Transcript Corrections)

Counsel for Pacific Gas and San Luis Obispo Mothers for Peace Electric Company 1123 Flora Road Winston & Strawn, LLP Arroyo Grande, CA 93420 101 California Street Jill ZamEk, Esq.

San Francisco, CA 94111-5802 jzk@charter.net David A. Repka, Esq.

E-mail: drepka@winston.com Tyson Smith, Esq. Counsel for San Luis Obispo Mothers E-mail: trsmith@winston.com For Peace Carlos Sisco, Senior Paralegal Harmon, Curran, Spielberg, and Eisenberg E-mail: csisco@winston.com 1726 M Street, N.W., Suite 600 Washington, DC 20036 Diane Curran, Esq.

dcurran@harmoncurran.com Ayres Law Group, LLP 1707 L Street NW, Suite 850 Washington, DC 20036 Richard E. Ayres, Esq.

E-mail: ayresr@ayreslawgroup.com John Bernetich, Esq.

E-mail: bernetichj@ayreslawgroup.com Jessica L. Olson, Esq.

E-mail: olsonj@ayreslawgroup.com

[Original signed by Herald M. Speiser ]

Office of the Secretary of the Commission Dated at Rockville, Maryland, this 4th day of February, 2015