ML15029A621
| ML15029A621 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 01/29/2015 |
| From: | Hironori Peterson Operations Branch III |
| To: | Harkness E FirstEnergy Nuclear Operating Co |
| References | |
| Download: ML15029A621 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 January 29, 2015 Mr. Ernest Harkness Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL
Dear Mr. Harkness:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Perry Nuclear Power Plant.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Richard Strohl, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 9, Supplement 1 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, during the week of February 16, 2015.
The NRC staff will administer the operating tests during the weeks of February 2 and 9, 2015.
This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing the operators at your facility, do not administer the examination and contact me at 630-829-9707.
Please contact your Chief Examiner, Mr. Raymond Walton, at 630-829-9836, if you have any questions or identify any errors or changes in the license level reactor operator (RO) or senior reactor operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via LISTSERV R. Strohl, Training Manager
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via LISTSERV R. Strohl, Training Manager DISTRIBUTION:
Kimyata MorganButler RidsNrrPMPerry Resource RidsNrrDorlLpl3-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Eric Duncan Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number ML15029A621 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS C RIII:DRS N RIII:DRS N
NAME JRKweiser:jw RKWalton:
HPeterson:
DATE 01/29/15 01/29/15 01/29/15 OFFICIAL RECORD COPY