1 IPRenewal NPEmails From:

Wentzel, Michael Sent:

Thursday, January 22, 2015 6:34 AM To:

Gray, Dara

Subject:

Draft Phone Call Summary Attachments:

121114 and 011315, Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Environmental Review.docx

Dara, Ive prepared a phone call summary for our December 11, 2014, and January 13, 2015 phone calls. Can you please review and let me know if you have any comments?
Thanks, Mike Michael Wentzel Project Manager NRR/DLR/RPB2 (301) 415-6459 michael.wentzel@nrc.gov

Hearing Identifier:

IndianPointUnits2and3NonPublic_EX Email Number:

4839 Mail Envelope Properties (C0A338EE37A11447B136119705BF9A3F025F9C8F79DD)

Subject:

Draft Phone Call Summary Sent Date:

1/22/2015 6:34:21 AM Received Date:

1/22/2015 6:34:22 AM From:

Wentzel, Michael Created By:

Michael.Wentzel@nrc.gov Recipients:

"Gray, Dara" <DGray@entergy.com>

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 351 1/22/2015 6:34:22 AM 121114 and 011315, Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Environmental Review.docx 90976 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

LICENSE FACILITY SUBJEC The U.S.

Operatio and clarif Nuclear G Enclosur discusse Entergy h Docket N Enclosur As stated cc w/enc EE:

Enterg Y:

Indian CT:

SUMM

2014, ENTE FOR A NUCL APPL

. Nuclear Re ns, Inc., (En fy the NRC s Generating U re 1 provides ed with Enter had an oppo Nos. 50-247 re:

d cl: Listserv NUC gy Nuclear O n Point Nucle MARY OF T BETWEEN ERGY NUCL ADDITIONA LEAR GENE LICATION EN egulatory Co ntergy)held a staffs reque Unit Nos. 2 a s a listing of rgy, including ortunity to co and 50-286 UNIT CLEARREGU WASHING Operations, ear Generat ELEPHONE THE U.S. N LEAR OPER AL INFORMA ERATING UN NVIRONME ommission (N a telephone est for additio and 3 licens the participa g a brief des omment on t TED STATES ULATORY CO GTON, D.C. 20555 Inc.

ing Unit Nos E CONFERE NUCLEAR R RATIONS, IN ATION PERT NIT NOS. 2 NTAL REVI NRC) staff a conference onal informa se renewal a ants and En scription of th this summary Michael We Projects Bra Division of L Office of Nu S

OMMISSION 5-0001

s. 2 and 3 ENCE CALL REGULATOR NC. CONCER TAINING TO AND 3 LICE EW (TAC N nd represen call on Dece ation (RAI) co pplication en closure 2 co he status.
y.

entzel, Proje anch 2 License Ren uclear React N

HELD ON D RY COMMIS RNING THE O THE INDIA ENSE RENE OS. MD541 ntatives of En ember 11, 20 oncerning th nvironmenta ontains a list ct Manager newal tor Regulatio DECEMBER SSION AND E REQUEST AN POINT EWAL 1 AND MD5 ntergy Nucle 014,to discu he Indian Po al review.

ing of the RA on

R11, T

5412) ear ss oint AIs

  • concurrence via e-mail OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME MWentzel BWittick MWentzel DATE

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER11, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC. CONCERNING THE REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NOS. MD5411 AND MD5412)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsOgcMailCenter Resource MWentzel MGray, RI DLogan ABurritt, RI BWittick DonaldJackson, RI DWrona GMeyer, RI DPickett MModes, RI STurk, OGC NSheehan, RI OPA BMizuno, OGC DScrenci, RI OPA DRoth, OGC DTifft, RI BHarris, OGC NMcNamara, RI SBurnell, OPA GNewman, RI DMcIntyre, OPA JSStewart, RI JWeil, OCA AmiPatel, RI

ENCLOSURE 1 TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS DECEMBER 11, 2014 and January 13, 2015 PARTICIPANTS:

AFFILIATIONS:

Dennis Logan U.S. Nuclear Regulatory Commission (NRC)

Michael Wentzel NRC Valerie Cullinan Pacific Northwest National Laboratory Larry Barnthouse Entergy Nuclear Operations, Inc. (Entergy)

Dara Gray Entergy Doug Heimbuch Entergy Mark Mattson Entergy John Young Entergy

ENCLOSURE 2 TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION DECEMBER 11, 2014 The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Entergy Nuclear Operations, Inc., (Entergy)held a telephone conference call on December 11, 2014,to discuss and clarify the following requests for additional information (RAIs) concerning the license renewal application environmental review.

Request for Additional Information (RAI) 1 Basis: The U.S. Nuclear Regulatory Commission (NRC) staff is in the process of performing an independent verification of Entergy Nuclear Operations, Inc.s (Entergys) February 19, 2014, submission by using the data from Entergys October 27, 2014 response to RAIs. The results indicate that the Entergys Format 1 data set submitted in October 2014 differs from the data set used in the February 2014 submission. In order to conduct its independent verification, the NRC staff must understand how and why the data sets appear to differ.

Request: Provide a clear written explanation of how and why the Format 1 data in Entergys October 2014 response to RAIs differ from the data set used in Entergys February 2014 submission, and if the data differ, provide the Format 1 data used for the February 2014 submission. Pay particular attention to the calculation of catch-per-unit-effort (CPUE) and density in the two submissions. Also, SAS and other statistical software provide several methods to calculate percentiles, and these can return different results when applied to the same data. Provide the method and cite the software used to determine the 75th percentile of the data.

RAI 2

Basis: As part of the NRC staffs independent verification of Entergys February 2014 submission, the NRC staff needs to refer to information from the Hudson River Sampling Program.

Request: Provide electronic copies of the Hudson River Year Class Reports for years 2006 through 2011. Entergy has already provided electronic copies for previous years.

RAI 3

Basis: Entergys October 2014 submission includes a letter to Ms. Dara Gray informing her of the quality assurance methodology employed on the October 2014 data submission. The letter states that the intermediate results of analyses were not identical to the results presented in tables supplied with Entergys February 2014 submission Request: Provide the intermediate tables comparing models, assessment of potential impacts, strength of connection analysis parameters and results, and the weight of evidence conclusion tables from the October 2014 submission.

RAI 4

Basis: Entergys October 2014 submission includes a letter to Ms. Dara Gray informing her of an adjustment to the assignment of data associated with a given week, i.e., selected Sunday samples were assigned to the following work week instead of the prior week. The letter also states that this adjustment was made to the data submission provided to the NRC staff prior to preparation of the June 2013 supplement to the Final Supplemental Environmental Impact Statement (FSEIS) for Indian Point Nuclear Generating Unit Nos. 2 and 3. The letter states that sampling occurred on a Sunday because a holiday occurred within the work week; however, the standard algorithm used to assign a week based upon date resulted in the Sunday samples being assigned to the prior week. As part of NRC staffs review of the data received in October 2014 with that received prior to preparation of the June 2013 supplement to the FSEIS, NRC staff found that the week number assigned to the samples was not always consistent between the two data sets.

Request: Provide the original week number assigned to all data and delineate which weeks were adjusted in the February and October 2014 submissions.

RAI 5

Basis: As part of NRC staffs review of the data received in October 2014, the NRC staff found that data for striped bass sample size and volume in the Fall Shoals Survey, River Segment 4 sample for week 41, 1994, were inconsistent with those data received from Entergy by letter dated March 7, 2008.

Request: Please: 1) identify differences between the October 2014 and those data received in the March 7, 2008 submittal; 2) provide reasons for the differences; and 3) provide a rationale for which data set is correct.

December 11, 2014, Discussion:

Entergy requested clarification as to which data sets were being compared and to the nature of the differences being identified between the sets. To aid in identifying the March 7, 2008 transmittal, the NRC staff agreed to forward data sets from that submittal. Based on the discussion with Entergy, the NRC staff revised RAIs 1, 4, and 5, as noted below. The NRC staff and Entergy agreed to allow additional time to consider the revised RAIs and for an additional phone call to discuss the revisions.

RAI 1

Basis: The U.S. Nuclear Regulatory Commission (NRC) staff is in the process of performing an independent verification of Entergy Nuclear Operations, Inc.s (Entergys) February 19, 2014, submission by using the data from Entergys October 27, 2014 response to RAIs. The results indicate that the Entergys Format 1 data set submitted in October 2014 differs from the data set used in the February 2014 submission. In order to conduct its independent verification, the NRC staff must understand how and why the data sets appear to differ.

Request: Provide a clear written explanation of how and why the Format 1 data in Entergys October 2014 response to RAIs differ from the data set used in Entergys February 2014 submission, and if the data differ, provide the Format 1 data used for the February 2014 analysis. Support the explanation of the difference with selected SAS code used to create both

data sets. Pay particular attention to the calculation of catch-per-unit-effort (CPUE) and density in the two submissions. Also, SAS and other statistical software provide several methods to calculate percentiles, and these can return different results when applied to the same data.

Provide the method and cite the software used to determine the 75th percentile of the data.

RAI 4

Basis: Entergys October 2014 submission includes a letter to Ms. Dara Gray informing her of an adjustment to the assignment of data associated with a given week, i.e., selected Sunday samples were assigned to the following work week instead of the prior week. The letter also states that this adjustment was made to the data submission provided to the NRC staff from Entergy by letter dated March 7, 2008. The October 2014 letter states that sampling occurred on a Sunday because a holiday occurred within the work week; however, the standard algorithm used to assign a week based upon date resulted in the Sunday samples being assigned to the prior week. As part of NRC staffs review of the data received in October 2014 with that received prior to preparation of the June 2013 supplement to the Final Supplemental Environmental Impact Statement for Indian Point Nuclear Generating Unit Nos. 2 and 3, NRC staff found that the week number assigned to the samples was not always consistent between the two data sets.

Request: Provide the original week number assigned to all data and delineate which weeks were adjusted in the February and October 2014 submissions.

RAI 5

Basis: As part of NRC staffs review of the data received in October 2014, the NRC staff found that data for striped bass sample size and volume in the Fall Shoals Survey, River Segment 4 sample for week 41, 1994, were inconsistent with those data received from Entergy by letter dated March 7, 2008.

Request: Please: (1) identify differences (e.g., in week number, number of samples, volume of samples, number of young-of-year caught, and total number of fish caught) between the October 2014 and those data received in the March 7, 2008 submittal; (2) provide reasons for the differences; and (3) provide a rationale for which data set is correct.

January 13, 2015, Discussion:

Entergy requested clarification as to what was meant by the term original week number in RAI

4. NRC staff indicated that it was necessary to compare which weeks corresponded between the 2008 and 2014 data. For RAI 5, Entergy indicated that it was not clear if the example identified in the basis discussion was the extent of the discrepancies, or an example. Also, Entergy stated that requests 2 and 3 seemed to be asking for the same information. As a result, NRC staff revised RAIs 4 and 5, as noted below. Entergy requested additional time to consider the changes made to the RAIs and the scope of the information that the NRC is requesting.

The NRC agreed to delay issuing the RAIs pending this review.

RAI 4

Basis: Entergys October 2014 submission includes a letter to Ms. Dara Gray informing her of an adjustment to the assignment of data associated with a given week, i.e., selected Sunday samples were assigned to the following work week instead of the prior week. The letter also

states that this adjustment was made to the data submission provided to the NRC staff from Entergy by letter dated March 7, 2008. The October 2014 letter states that sampling occurred on a Sunday because a holiday occurred within the work week; however, the standard algorithm used to assign a week based upon date resulted in the Sunday samples being assigned to the prior week. As part of NRC staffs review of the data received in October 2014 with that received prior to preparation of the June 2013 supplement to the Final Supplemental Environmental Impact Statement for Indian Point Nuclear Generating Unit Nos. 2 and 3, NRC staff found that the week number assigned to the samples was not always consistent between the two data sets.

Request: Provide a comparative key to the 2008 and 2014 week number assignmentsand delineate which weeks were adjusted for Sunday sampling events in the February and October 2014 submissions.

RAI 5

Basis:As part of NRC staffs review of the data received in October 2014, the NRC staff found that data those data were inconsistent with those data received from Entergy by letter dated March 7, 2008. For example, those data for striped bass sample size and volume in the Fall Shoals Survey, River Segment 4 sample for week 41, 1994.

Request:Please: (1) identify differences (for example in week number, number of samples, volume of samples, number of young-of-year caught, and total number of fish caught) between the October 2014 and those data received in the March 7, 2008 and the December 2007 data disks (labeled IPEC License Renewal - Environmental, Letter NL-07-156, 12/20/07, Enclosures, Disc 1 of 2 data submittal); (2) provide reasons for the differences and rational for which data set is correct; and (3) provide the corrected version.