MONTHYEARIR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23319A3902023-09-20020 September 2023 11-CW-2023-09 Public Forms ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20223012022-04-12012 April 2022 NRC Examination Report 05000483/2022301 ML22081A1292022-02-23023 February 2022 CW-2022-02-Post Exam Comments ML22105A0022022-02-23023 February 2022 CW-2022-02-Public Forms ML21067A5392021-03-0808 March 2021 Notification of NRC Initial Operator Licensing Examination 05000483/2022301 ML20276A1522020-09-0909 September 2020 1-CW-2020-08 Draft Outlines ML20276A1532020-09-0909 September 2020 2-CW-2020-08 Draft Outline Comments ML20276A1552020-09-0909 September 2020 4-CW-2020-08 Written Exam Comments Final 8-25-2020 ML20276A1542020-09-0909 September 2020 3-CW-2020-08 Draft Written Exam ML20276A1582020-09-0909 September 2020 7-CW-2020-08 Outlines Final ML20276A1562020-09-0909 September 2020 5-CW-2020-08 Draft Operating Test ML20276A1572020-09-0909 September 2020 6-CW-2020-08 Operating Test Comments - Final BC Comments.Pdf ML20276A1592020-09-0909 September 2020 8-CW-2020-08 Written Exam Final ML20276A1602020-09-0909 September 2020 9-CW-2020-08 Operating Test - Final ML20276A1362020-09-0909 September 2020 10-CW-2020-08 Post-Exam Comments ML20276A1372020-09-0909 September 2020 11-CW-2020-08 Public Forms ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18143B4542018-04-25025 April 2018 Operator Licensing Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17270A1662017-09-20020 September 2017 2017-09-DRAFT Op Test Comments ES-301-7 ML17270A1672017-09-20020 September 2017 2017-09-DRAFT Op Test ML17270A1682017-09-20020 September 2017 2017-09-DRAFT Outline Comments ML17270A1692017-09-20020 September 2017 2017-09-DRAFT Outlines ML17270A1702017-09-20020 September 2017 2017-09-Draft Written Exam Comments ES-401-9 ML17270A1712017-09-20020 September 2017 2017-09-DRAFT Written Exam ML17270A1722017-09-20020 September 2017 2017-09-FINAL Op Test ML17270A1732017-09-20020 September 2017 2017-09-FINAL Outlines ML17270A1742017-09-20020 September 2017 2017-09-Final Written Exam ML17270A1752017-09-20020 September 2017 2017-09-Post Exam Comments ML17296A0262017-09-20020 September 2017 2017-09-Public Forms ML17118A1822017-04-17017 April 2017 Submittal of NRC Form 536 Operator Licensing Examination Data ML17058A0822017-02-27027 February 2017 Notification of NRC Initial Operator Licensing Examination 05000483/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16196A2392016-06-28028 June 2016 Submittal of Operator Licensing Examination Data ML16158A4692016-06-0101 June 2016 2016-06 Final Outlines ML16179A1772016-06-0101 June 2016 2016-06 Public Forms ML16158A4782016-06-0101 June 2016 2016-06 Post-Examination Analysis and Comments ML16158A4752016-06-0101 June 2016 2016-06 Final Operating Test ML16158A4632016-06-0101 June 2016 2016-06 Draft Operating Test Comments ML16158A4612016-06-0101 June 2016 2016-06 Draft Operating Test ML16158A4602016-06-0101 June 2016 2016-06 Draft Written Examination Comments ML16158A4532016-06-0101 June 2016 2016-06 Draft Outline Comments ML16158A4572016-06-0101 June 2016 2016-06 Draft Written Examination ML16158A4492016-06-0101 June 2016 2016-06 Draft Outlines ML16139A3282016-05-18018 May 2016 NRC Initial Operator Licensing Examination Approval 05000483/2016301 ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 2023-09-20
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23319A3902023-09-20020 September 2023 11-CW-2023-09 Public Forms ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20223012022-04-12012 April 2022 NRC Examination Report 05000483/2022301 ML22081A1292022-02-23023 February 2022 CW-2022-02-Post Exam Comments ML22105A0022022-02-23023 February 2022 CW-2022-02-Public Forms ML20276A1522020-09-0909 September 2020 1-CW-2020-08 Draft Outlines ML20276A1532020-09-0909 September 2020 2-CW-2020-08 Draft Outline Comments ML20276A1552020-09-0909 September 2020 4-CW-2020-08 Written Exam Comments Final 8-25-2020 ML20276A1542020-09-0909 September 2020 3-CW-2020-08 Draft Written Exam ML20276A1582020-09-0909 September 2020 7-CW-2020-08 Outlines Final ML20276A1562020-09-0909 September 2020 5-CW-2020-08 Draft Operating Test ML20276A1572020-09-0909 September 2020 6-CW-2020-08 Operating Test Comments - Final BC Comments.Pdf ML20276A1592020-09-0909 September 2020 8-CW-2020-08 Written Exam Final ML20276A1602020-09-0909 September 2020 9-CW-2020-08 Operating Test - Final ML20276A1362020-09-0909 September 2020 10-CW-2020-08 Post-Exam Comments ML20276A1372020-09-0909 September 2020 11-CW-2020-08 Public Forms ML18143B4542018-04-25025 April 2018 Operator Licensing Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17270A1662017-09-20020 September 2017 2017-09-DRAFT Op Test Comments ES-301-7 ML17270A1672017-09-20020 September 2017 2017-09-DRAFT Op Test ML17270A1682017-09-20020 September 2017 2017-09-DRAFT Outline Comments ML17270A1692017-09-20020 September 2017 2017-09-DRAFT Outlines ML17270A1702017-09-20020 September 2017 2017-09-Draft Written Exam Comments ES-401-9 ML17270A1712017-09-20020 September 2017 2017-09-DRAFT Written Exam ML17270A1722017-09-20020 September 2017 2017-09-FINAL Op Test ML17270A1732017-09-20020 September 2017 2017-09-FINAL Outlines ML17270A1742017-09-20020 September 2017 2017-09-Final Written Exam ML17270A1752017-09-20020 September 2017 2017-09-Post Exam Comments ML17296A0262017-09-20020 September 2017 2017-09-Public Forms ML17118A1822017-04-17017 April 2017 Submittal of NRC Form 536 Operator Licensing Examination Data ML17058A0822017-02-27027 February 2017 Notification of NRC Initial Operator Licensing Examination 05000483/2017301 ML16196A2392016-06-28028 June 2016 Submittal of Operator Licensing Examination Data ML16158A4492016-06-0101 June 2016 2016-06 Draft Outlines ML16158A4532016-06-0101 June 2016 2016-06 Draft Outline Comments ML16158A4572016-06-0101 June 2016 2016-06 Draft Written Examination ML16158A4602016-06-0101 June 2016 2016-06 Draft Written Examination Comments ML16158A4612016-06-0101 June 2016 2016-06 Draft Operating Test ML16158A4632016-06-0101 June 2016 2016-06 Draft Operating Test Comments ML16158A4692016-06-0101 June 2016 2016-06 Final Outlines ML16158A4752016-06-0101 June 2016 2016-06 Final Operating Test ML16158A4782016-06-0101 June 2016 2016-06 Post-Examination Analysis and Comments ML16179A1772016-06-0101 June 2016 2016-06 Public Forms ML16139A3282016-05-18018 May 2016 NRC Initial Operator Licensing Examination Approval 05000483/2016301 ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15140A1262015-05-18018 May 2015 2015-05-FINAL Written Exam ML15146A0482015-05-18018 May 2015 2015-05-Public Forms ML15140A2892015-05-18018 May 2015 2015-05-Draft Written Exam Comments Rev 1 2023-09-20
[Table view] |
Text
DRAFT OUTLINE COMMENTS Facility: CW First Exam Date: 12/08/14 Written Exam Outline 9/29/15 Comment Resolution 1 NRC Generated On the SRO exam, the licensee rejected Randomly selected K/A from within system system 068 2.1.23 (Liquid Radwaste), 034 (Fuel Handling Equipment) using all and replaced it with system 034 A2.01 available K/As. K4.02 was selected. Updated (Fuel Handling Equipment), with Form ES-401-2 and 401-4. Complete random selection of new K/A number within Generic or A2 sections.
However, per NUREG 1021 ES-401.D.1.c, the K/As for the SRO examination will be drawn from those K/A categories (denoted by Columns 2
A2 and G in the SRO-only section of the applicable examination outline) and from all K/A categories related to the fuel handling facilities. Therefore, when 034 Fuel Handling Equipment was selected as the new system, the K/A category should have been randomly selected from ALL K/A categories, not just A2 and G. Also see note 8 on Form ES-401-2.
Resample within 034.
Administrative JPM Outline 9/29/15 Comment Resolution Renumber the Admin JPMs A1 through Renumbered the Admin JPMs, A1 thru A9.
1 A9. Complete Ensure SRO A.4 is sufficiently different SRO A9 (old number A.4) is sufficiently from the 2013 E-Plan classification JPM. different than the 2013 E-Plan classification.
2 Last 2 exams have included E-Plan 2013 JPM resulted in EAL CA3.1. This exam classifications. Consider replacing with results in EAL HA 1.2. The 2011 NRC Exam PAR. JPM was a PAR. Complete For MODIFIED JPMs, specify the Details on the parent JPM and what modifications that were made, and the modifications to the JPM were made have 3
last exam that the parent JPM appeared been added to the Admin and System JPM on. outlines (ES-301-1 and 301-2). Complete OBDI 202 - IOLE Process Rev 1
DRAFT OUTLINE COMMENTS Facility: CW First Exam Date: 12/08/14 Control Room / In-Plant System JPM Outline 9/29/15 Comment Resolution ROs and SRO-Is are receiving 4 alt path Modified S4 to be an Alternate Path JPM.
1 JPMs, which is the minimum. Add at Complete least one more alt path as a buffer.
Form ES-301-2 does not specify which No SRO-Us. No Action needed 2
JPMs the SRO-Us will take.
Is JPM S6 a repeat of 2011 Safety The JPM was modified from bank JPM URO-Function 6 JPM? (f) AEO-05-C174J(A). It is similar to the JPM 3
used on the 2011 exam. Information added to outline. Complete In-Plant JPMs: Safety Function 4S has Replaced with a SF 4P and SF 3 JPMs.
been sampled on the last 4 exams (2014 Complete included) and SF 6 on the last 3 exams, 4 while SFs 2, 3, 4P, 5, and 7 have not been sampled in that time. To reduce predictability, replace SF 4S and SF 6 with one of the unused SFs.
Simulator Scenario Outline Comments 9/29/15 Comment Resolution Critical Tasks: When the draft exam is Descriptions of the CTs have been added to submitted, for each CT specify how it ES-D1 outlines. These descriptions include meets the elements of a CT defined by the following:
NUREG 1021 App D, Section D.1 (safety 1. Safety significance (assess that the significance, cueing, measurable task is critical to safety) performance indicator, performance 2. Cueing (indications available to the feedback). Also explain the justification operators) for the chosen performance limit i.e., 3. Measurable performance indicator 1
X pump must be started before Y time (actions taken by at least one member because . of the crew)
- 4. Performance feedback (information available to the crew about the effect of the actions taken)
- 5. Justification for the chosen performance limit Complete An event can be counted as a Corrected the ES-D-1 and ES-301-5 for component malfunction or a reactivity scenarios 3 and 4. Complete 2
manipulation for a given applicant but not both. OBDI 202 - IOLE Process Rev 1
DRAFT OUTLINE COMMENTS Facility: CW First Exam Date: 12/08/14 Simulator Scenario Outline Comments 9/29/15 Scenario 2, Event 4: Main Seal Oil Pump Replaced event. Complete Trip. Event was the subject of an 3
extensive licensing decision appeal on last exam (2013). Replace event.
Scenarios 4 and 5 are at the minimum Added 1 additional event to scenario 4.
4 count for events. Add an additional Scenario 5 no longer being used. Complete event for margin.
Scenario 4: 5 of the 6 events were on Discussed the major event in scenario 4 with the last two exams (LTDN HX TCV the NRC Chief Examiner and explained the failure was not). Modify scenario to difference between the SG tube rupture in 5 reduce predictability, by modifying the 2013 and the 2014 exams. No change to the major event to achieve a different SG tube rupture event is needed. The response / course of action. normal event to reduce letdown was replaced with a different event. Complete Scenario 5 Event 3 (VCT Level Scenario 5 no longer being used.
Transmitter Failure) appeared on last 6
two exams (2013 and 2011). Replace with a different event.
Scenario 5: Ensure LOCA is different in Discussed the differences between the LOCA some manner from 2013 LOCA. on the 2013 and 2014 exams with the NRC 7
Consider inter-system LOCA. Chief Examiner. No change needed to the LOCA event.
For events where an instrument fails, Added instrument failure direction to the 8
specify on D-1 which direction it fails. applicable D-1s. Complete Only 2 of the 5 scenarios require entry Discussed this with the NRC Chief Examiner.
into EOP contingencies - need to be The current schedule ensures all candidates cautious to ensure all applicants are are evaluated in at least one contingency.
9 evaluated in at least one contingency. Agree that caution is needed if any changes are made to the schedule to ensure all candidates are evaluated in at least one contingency. No Changes needed General Comments 9/29/15 Comment Resolution Identify which plant-specific priorities Information pertaining to PRA events and 1 (including PRA and IPE insights) are actions has been added to the D-1 for each being covered. scenario. Complete OBDI 202 - IOLE Process Rev 1