ML15006A321

From kanterella
Jump to navigation Jump to search
Change in Project Manager Ltr-Carter
ML15006A321
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/07/2015
From: Bruce Watson
Reactor Decommissioning Branch
To: Heacock D
Dominion Nuclear Connecticut
References
Download: ML15006A321 (3)


Text

January 7, 2015 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Nuclear Connecticut, Inc.

5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

CHANGE IN NRC STAFF PROJECT MANAGEMENT FOR MILLSTONE POWER STATION UNIT 1

Dear Mr. Heacock:

This letter provides notification of a change to the Decommissioning Project Manager assigned to the Millstone Power Station Unit 1. Effective December 28, 2014, project management responsibilities for your license No. DPR-21 have been assigned to Ted Carter. Mr. Carter can be contacted by telephone at 301-415-5543 or by e-mail at Ted.Carter@nrc.gov.

Future official correspondence should be directed to the Document Control Desk with a copy sent directly to:

Ted Carter, Senior Project Manager The U.S Nuclear Regulatory Commission Mailstop T8F5 Washington, DC 20555-0001 In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Bruce A. Watson, CHP, Chief Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Materials Safety and Safeguards Docket No.: 50-245 License No.: DPR-21 cc: Millstone Power Station Unit 1 Service List

Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Nuclear Connecticut, Inc.

5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

CHANGE IN NRC STAFF PROJECT MANAGEMENT FOR MILLSTONE POWER STATION UNIT 1

Dear Mr. Heacock:

This letter provides notification of a change to the Decommissioning Project Manager assigned to the Millstone Power Station Unit 1. Effective December 28, 2014, project management responsibilities for your license No. DPR-21 have been assigned to Ted Carter. Mr. Carter can be contacted by telephone at 301-415-5543 or by e-mail at Ted.Carter@nrc.gov.

Future official correspondence should be directed to the Document Control Desk with a copy sent directly to:

Ted Carter, Senior Project Manager The U.S Nuclear Regulatory Commission Mailstop T8F5 Washington, DC 20555-0001 In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Bruce A. Watson, CHP, Chief Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Materials Safety and Safeguards Docket No.: 50-245 License No.: DPR-21 cc: Millstone Power Station Unit 1 Service List DISTRIBUTION: LKauffman MFerdas ML15006A321 OFC DUWP:PM DUWP:LA DUWP:PM DUWP:BC NAME SGiebel SAchten TCarter BWatson DATE 01/07/15 01/07/15 01/07/15 01/07/15 OFFICIAL RECORD COPY

Millstone Power Station Unit 1 Service List cc:

Edward L. Wilds, Jr., Ph.D.

Mr. Stephen Scace Director, Division of Radiation Site Vice President Department of Environmental Protection Dominion Nuclear Connecticut, Inc. 79 Elm Street Millstone Power Station Hartford, CT 06106-5127 Building 475, 5th Floor Rope Ferry Road Regional Administrator, Region I Waterford, CT 06385 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 Mr. Richard K. MacManus, Director King of Prussia, PA 19406 Nuclear Safety & Licensing Dominion Nuclear Connecticut, Inc. First Selectmen Millstone Power Station Town of Waterford Building 475, 5th Floor 15 Rope Ferry Road Rope Ferry Road Waterford, CT 06385 Waterford, CT 06385 Mr. Evan W. Woollacott, Co-Chair Ms. Lillian M. Cuoco, Esquire Nuclear Energy Advisory Council Senior Counsel 128 Terry's Plain Road Dominion Resources Services, Inc. Simsbury, CT 06070 120 Tredegar Street, RS-2 Richmond, VA 23219 Nancy Burton, Esquire 147 Cross Highway T.R. Huber Redding Ridge, CT 06876 Nuclear Licensing & Operations Support Innsbrook Technical Center Senior Resident Inspector 5000 Dominion Boulevard Millstone Power Station Glen Allen, VA 23060-6711 c/o Nuclear Regulatory Commission P.O. Box 513 Electronic Copies: Niantic, CT 06357 Skip.J.Jordan@dom.com William D. Bartron DanieI.G.Stoddard@dom.com Licensing Supervisor Chris.Funderburk@dom.com Dominion Nuclear Connecticut, Inc.

Thomas.L.Breene@dom.com Rope Ferry Road Jerry.Bischof@dom.com Waterford, CT 06385 David.Sommers@dom.com William.D.Bartron@dom.com C.D. Maxon Page.Kemp@dom.com Manager-Nuclear Oversight Barry.Garber@dom.com Dominion Nuclear Connecticut, Inc.

Lillian.Cuoco@dom.com Rope Ferry Road Vicki.Hull@dom.com Waterford, CT 06385 Ginger.L.Alligood@dom.com M.L. Fagan Assistant to the Site Vice President Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385