Category:Calculation
MONTHYEARML15222A2452015-07-23023 July 2015 Enclosure 2 - Attachment 4 - Atkins-NS-DAC-SHN-15-03, Revision 2 ML15222A2442015-07-23023 July 2015 Enclosure 2 - Attachment 2 - Atkins-NS-DAC-SHN-15-04, Revision 0 ML15222A2422015-07-23023 July 2015 Enclosure 2 - Attachment 3 - Atkins-NS-DAC-SHN-15-02, Revision 0 ML15183A2722015-06-19019 June 2015 Enclosure 2 Attachment 1 - ATKINS-NS-DAC-SHN-15-03, Rev. 1 - MCNP 6.1 Validation with Continuous Energy ENDF/B-VII.1 Cross Sections for Shine Medical Technologies ML15043A4102015-02-0606 February 2015 Enclosure 2, Attachment 3 - CALC-2013-0007, Revision 6, Annual Emissions During Construction, Operation, and Decommissioning Activities ML14357A3582014-12-0303 December 2014 Attachment 3 - Calculation 2013-01989, Revision 0 (Part 5 of 5) - Conceptual Design of Hardened Shine Facility Structural Elements ML14357A3522014-12-0303 December 2014 Attachment 3 - Calculation 2013-01989, Revision 0 (Part 4 of 5) - Conceptual Design of Hardened Shine Facility Structural Elements ML14357A3512014-12-0303 December 2014 Attachment 3 - Calculation 2013-01989, Revision 0 (Part 3 of 5) -Conceptual Design of Hardened Shine Facility Structural Elements ML14357A3502014-12-0303 December 2014 Attachment 3 - Calculation 2013-01989, Revision 0 (Part 2 of 5) - Conceptual Design of Hardened Shine Facility Structural Elements ML14357A3492014-12-0303 December 2014 Attachment 3 - Calculation 2013-01989, Revision 0 (Part 1 of 5) -Conceptual Design of Hardened Shine Facility Structural Elements ML14357A3482014-12-0303 December 2014 Attachment 2 - Calculation 2013-02413, Revision 0, Soil-Structure Interaction Analysis of Shine Medical Isotope Production Facility for Design Seismic Event ML13309B0102013-10-0404 October 2013 Shine Medical Technologies, Inc. Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2 Attachment 17 - Calculation SL-011348 Rev 2 ML13309A9882013-10-0404 October 2013 Shine Medical Technologies, Inc. Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2 Attachment 2; CALC-2013-0005 Rev. 0, Annual Release of Nox Gas and Sulfuric Acid 2015-07-23
[Table view] |