ML14357A333

From kanterella
Jump to navigation Jump to search
Physical Security Plan Inaccuracy Revealed Past Security Vulnerability
ML14357A333
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/19/2014
From: Fili K
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-14-079, LER 14-010-01
Download: ML14357A333 (1)


Text

Enclosure Contain Safeguards Information. When separated from the enclosure, this document is not Safeguards Information.

@ XceEnergy@

Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 December 19, 2014 L-MT-14-079 10 CFR 73.71 Attn: Document Control Desk US Nuclear Regulatory Commission Washington DC, 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 LER 2014-010-01 "Physical Security Plan Inaccuracy Revealed Past Security Vulnerability' Enclosed is the revised Monticello Licensee Event Report (LER) 2014-010-01. The information provided in the LER is regarded as Safeguards Information by the Northern States Power Company, a Minnesota corporation doing business as Xcel Energy, and as such, the enclosure should be withheld from public disclosure. When separated from the Safeguards Information enclosure, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

4 t Karen D. Fi P

Site Vice President, Monticello Nucle enerating Plant Northern States Power Company - Minnesota Enclosure cc:

Director, Office of Nuclear Security and Incident Response Regional Administrator, Region Ill, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC (w/o Enclosure)

Resident Inspector, Monticello Nuclear Generating Plant, USNRC (w/o Enclosure)

Enclosure Contain Safeguards Information. When separated from the enclosure, this document is not Safeguards Information

Enclosure Contain Safeguards Information. When separated from the enclosure, this document is not Safeguards Information.

@ XceEnergy@

Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 December 19, 2014 L-MT-14-079 10 CFR 73.71 Attn: Document Control Desk US Nuclear Regulatory Commission Washington DC, 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 LER 2014-010-01 "Physical Security Plan Inaccuracy Revealed Past Security Vulnerability' Enclosed is the revised Monticello Licensee Event Report (LER) 2014-010-01. The information provided in the LER is regarded as Safeguards Information by the Northern States Power Company, a Minnesota corporation doing business as Xcel Energy, and as such, the enclosure should be withheld from public disclosure. When separated from the Safeguards Information enclosure, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

4 t Karen D. Fi P

Site Vice President, Monticello Nucle enerating Plant Northern States Power Company - Minnesota Enclosure cc:

Director, Office of Nuclear Security and Incident Response Regional Administrator, Region Ill, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC (w/o Enclosure)

Resident Inspector, Monticello Nuclear Generating Plant, USNRC (w/o Enclosure)

Enclosure Contain Safeguards Information. When separated from the enclosure, this document is not Safeguards Information