Notification of Potential Errors in the Cycle 20 Reload Calculations
ML14357A120
Person / Time
Site: Pilgrim
Issue date: 12/16/2014
From: Perkins E
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.14.084
Download: ML14357A120 (1)


Text

SEntergy Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 December 16, 2014 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

SUBJECT:

10 CFR 50.46(a)(3)(ii) Report Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293, License No.: DPR-35

REFERENCE:

1. GE Hitachi Proprietary Information - 10 CFR 50.46 Notification Letters 2014-01, 2014-02, 2014-03, and 2014-04 dated May 21, 2014 LETTER NUMBER: 2.14.084

Dear Sir or Madam:

Pursuant to 10 CFR 50.46(a)(3)(ii), Entergy hereby notifies the NRC of information provided by GE Hitachi by Reference 1 concerning potential errors in the Pilgrim Cycle 20 reload calculations related to Pilgrim Emergency Core Cooling System (ECCS) performance that could potentially impact the compliance with the peak cladding temperature (PCT) limit of 22000F.

The referenced notification applies to GNF2 and GE14 Type Fuel, which was included in the current Pilgrim Fuel Cycle 20 that will end on or about April 19, 2015. The reported change in Peak Cladding Temperature (PCT) is 20°F for both GE14 and GNF2 fuel types. For Fuel Cycle 20, the 20 °F PCT increase, makes the Licensing Basis PCT 2170 *F, which still complies with the PCT limit of 2200'F specified by 10 CFR 50.46(b)(1).

Thus, the reported PCT change had no impact on the public health and safety during Fuel Cycle

20. This letter contains no commitments.

Please feel free to contact me, (508) 830-8323, if you have any questions regarding this report.

Sincerely, Everett P. Perkins, Manager, Regulatory Assuranc cc:

Mr. Daniel H. Dorman Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station Ms. Nadiyah Morgan, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North O-8C2A 11555 Rockville Pike, Rockville, MD 20852

SEntergy Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 December 16, 2014 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

SUBJECT:

10 CFR 50.46(a)(3)(ii) Report Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293, License No.: DPR-35

REFERENCE:

1. GE Hitachi Proprietary Information - 10 CFR 50.46 Notification Letters 2014-01, 2014-02, 2014-03, and 2014-04 dated May 21, 2014 LETTER NUMBER: 2.14.084

Dear Sir or Madam:

Pursuant to 10 CFR 50.46(a)(3)(ii), Entergy hereby notifies the NRC of information provided by GE Hitachi by Reference 1 concerning potential errors in the Pilgrim Cycle 20 reload calculations related to Pilgrim Emergency Core Cooling System (ECCS) performance that could potentially impact the compliance with the peak cladding temperature (PCT) limit of 22000F.

The referenced notification applies to GNF2 and GE14 Type Fuel, which was included in the current Pilgrim Fuel Cycle 20 that will end on or about April 19, 2015. The reported change in Peak Cladding Temperature (PCT) is 20°F for both GE14 and GNF2 fuel types. For Fuel Cycle 20, the 20 °F PCT increase, makes the Licensing Basis PCT 2170 *F, which still complies with the PCT limit of 2200'F specified by 10 CFR 50.46(b)(1).

Thus, the reported PCT change had no impact on the public health and safety during Fuel Cycle

20. This letter contains no commitments.

Please feel free to contact me, (508) 830-8323, if you have any questions regarding this report.

Sincerely, Everett P. Perkins, Manager, Regulatory Assuranc cc:

Mr. Daniel H. Dorman Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station Ms. Nadiyah Morgan, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North O-8C2A 11555 Rockville Pike, Rockville, MD 20852