Response to Notice of Violation (NRC Inspection Report 05000313/2014008 and 05000368/2014008)
ML14338A397
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 12/02/2014
From: Ryan Lantz
NRC/RGN-IV/DRP/RPB-E
To: Jeremy G. Browning
Entergy Operations
References
EA-14-008 IR 2014008
Download: ML14338A397 (4)


See also: IR 05000313/2014008

Text

December 2, 2014

EA-14-008

Jeremy Browning, Site Vice

President

Entergy Operations, Inc.

Arkansas Nuclear One

1448 SR 333

Russellville, AR 72802-0967

SUBJECT:

ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - RESPONSE TO

NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000313/2014008

AND 05000368/2014008)

Dear Mr. Browning:

On June 23, 2014, the NRC cited Entergy Operations, Inc.s failure to accomplish a move of the

Arkansas Nuclear One, Unit 1, main turbine generator stator in accordance with documented

instructions and procedures as required by 10 CFR Part 50, Appendix B, Criterion V,

Instructions, Procedures, and Drawings. The Notice of Violation, enclosed with NRC

Inspection Report 05000313/2014008 and 05000368/2014008 (ML14174A832), required you to

respond in writing within 30 days. You responded by letter, dated July 18, 2014

(ML14199A412). You submitted a supplemental response by letter, dated November 20, 2014

(ML14324A783).

This letter is to acknowledge receipt of your supplemental response letter, dated November 20,

2014. We have reviewed your supplemental response and find that it meets the requirements

of 10 CFR 2.201. We will review your corrective actions during a future inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the NRCs Agencywide Documents Access Management System (ADAMS), which is accessible

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

J. Browning

- 2 -

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/ Greg Warnick for

Ryan E. Lantz, Chief

Project Branch E

Division of Reactor Projects

Dockets: 50-313; 50-368

Licenses: DPR-51; NPF-6

cc: Electronic Distribution

ML14338A397

SUNSI Review

By: TPruett

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

RGN-002

OFFICE

SPE:DRP/E

C:DRP/E

NAME

CYoung/dch

RLantz

SIGNATURE

/RA/

GWarnick for

DATE

11/28/14

12/2/14

Letter to Jeremy Browning from Ryan Lantz, dated December 2, 2014

SUBJECT:

ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - RESPONSE TO

NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000313/2014008

AND 05000368/2014008)

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Jason.Kozal@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Brian.Tindell@nrc.gov)

Resident Inspector (Matt.Young@nrc.gov)

Resident Inspector (Abin.Fairbanks@nrc.gov)

Branch Chief, DRP/E (Ryan.Lantz@nrc.gov)

Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)

Project Engineer, DRP/E (Jim.Melfi@nrc.gov)

ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Andrea.George@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)