Dominion Resources Services, Inc.
Innsbrook Technical Center o
m n
U k
I
5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 October 27, 2014 United States Nuclear Regulatory Commission Serial No.
14-212A Attention: Document Control Desk NL&OS/GDM: RO Washington, D.C. 20555 Docket No.
50-281 License No.
DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
SURRY POWER STATION UNIT 2 CORE OPERATING LIMITS REPORT SURRY 2 CYCLE 26 PATTERN EBA REVISION 0 REQUEST FOR CLARIFICATION By letter dated April 23, 2014 (Serial No.14-212), Dominion submitted the Core Operating Limits Report (COLR) for Surry Unit 2 Cycle 26, Pattern EBA, Revision 0, as required by Surry Technical Specification (TS) 6.2.C, "CORE OPERATING LIMITS REPORT."
Subsequent to the submittal, the NRC requested clarification regarding the methodology used to determine TS 2.1. The specific NRC question and the Dominion response are provided below.
NRC Question The COLR report provided contains a list of references. Each reference contains a list of technical specifications for which that methodology is used. TS 2.1, "Safety Limit, Reactor Core," is not listed under any of the references. Please clarify which methodology(ies) is (are) used to determine TS 2.1, "Safety Limit, Reactor Core."
Response
The Dominion methodology used to determine TS 2.1 is VEP-FRD-42, Rev. 2.1-A, "Reload Nuclear Design Methodology," dated August 2003. TS 2.1 was inadvertently omitted from the list of TS sections associated with this methodology reference in Section 2.1 of the COLR. TS 2.1 will be appropriately referenced in future Surry COLR submittals.
If you have any questions or require additional information, please contact Mr. Gary Miller at (804) 273-2771.
Sincerely, T. R. Huber, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc. for Virginia Electric and Power Company A '"'
Serial No. 14-212A Docket No. 50-281 RAI COLR S2C26 Page 2 of 2 Commitment Summary: There are no new commitments contained in this letter.
cc:
U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Ms. K. Cotton-Gross NRC Project Manager - Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Dr. V. Sreenivas NRC Project Manager - North Anna U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Senior Resident Inspector Surry Power Station