Order (Rescheduling Prehearing Conference Call)
ML14302A288
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/29/2014
From: Hawkens E
Atomic Safety and Licensing Board Panel
To:
SECY RAS
References
50-271-LA, ASLBP 15-934-01-LA-BD01, RAS 26762
Download: ML14302A288 (4)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

E. Roy Hawkens, Chairman Dr. Michael F. Kennedy Dr. Richard E. Wardwell In the Matter of Docket No. 50-271-LA ENTERGY NUCLEAR VERMONT YANKEE, LLC, AND ENTERGY NUCLEAR ASLBP No. 15-934-01-LA-BD01 OPERATIONS, INC.

October 29, 2014 (Vermont Yankee Nuclear Power Station)

ORDER (Rescheduling Pre-Hearing Conference Call)

The Board originally scheduled a telephone conference call in this proceeding to be held on October 29, 2014, for the purpose of discussing pre-hearing matters, including the potential scheduling of oral argument on contention admissibility.1 That teleconference was cancelled,2 and will now be held on Thursday, November 6, 2014, at 2:00 PM EST.

This proceeding involves a request by Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. to amend its Site Emergency Plan to reflect reduced levels in the on-shift staffing and the Emergency Response Organization staffing at the Vermont Yankee 1

Licensing Board Order (Scheduling Pre-Hearing Conference Call) (Oct. 23, 2014) at 2 (unpublished).

2 Licensing Board Order (Granting Request for Extension of Time and Cancelling Conference Call) (Oct. 27, 2014) (unpublished); see State of Vermonts Unopposed Motion for an Extension of Time to File a Reply to NRC Staff and Entergy Answers to the State of Vermonts Notice of Intention to Participate, Petition to Intervene, and Hearing Request, and Request for Rescheduling of Prehearing Conference (Oct. 27, 2014).

Nuclear Power Station, which is currently scheduled to cease operations by the end of 2014.3 The Vermont Department of Public Service, on behalf of the State of Vermont, opposes the request and contends that (1) the [Emergency Response Data System (ERDS)] link to the NRC

[must] be retained during Vermont Yankees permanently shut down and defueled period; or (2) an alternate means similar to ERDS [must] be made available to provide equivalent Radiation Monitoring System, Meteorological information, and Containment parameters relevant to the spent fuel pool conditions for as long as fuel remains within the spent fuel pool.4 The Boards law clerk, Nicole Pepperl, will contact the parties with the dial-in number and passcode for the November 6, 2014, conference call. Members of the public or media who wish to listen to this conference call may do so, and should contact Ms. Pepperl at Nicole.Pepperl@nrc.gov for the listen-in number or with any questions regarding the call.

It is so ORDERED.

FOR THE ATOMIC SAFETY AND LICENSING BOARD

/RA/

E. Roy Hawkens, Chairman ADMINISTRATIVE JUDGE Rockville, Maryland October 29, 2014 3

Letter from Christopher Wamser, Site Vice President, Vermont Yankee Nuclear Power Station, to Document Control Desk, U.S. Nuclear Regulatory Commission, Proposed Changes to the Vermont Yankee Emergency Plan (Mar. 24, 2014) (ADAMS Accession No. ML14085A257);

see also 79 Fed. Reg. 42,539, 42,546 (July 22, 2014).

4 Vermont Department of Public Service Notice of Intention to Participate, Petition to Intervene, and Hearing Request (Sept. 22, 2014) at 5; see also id. at 3-4 (citing 10 C.F.R. §§ 50.47, 50.57(a)(3), 50.92).

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE, LLC ) Docket No. 50-271-LA AND ENTERGY NUCLEAR OPERATIONS, INC. )

)

(Vermont Yankee Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing ORDER (Rescheduling Pre-Hearing Conference Call) have been served upon the following persons by the Electronic Information Exchange.

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Office of the General Counsel Mail Stop: T-3 F23 Mail Stop: O15D21 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E. Roy Hawkens, Chairman Beth Mizuno, Esq Roy.Hawkens@nrc.gov Jeremy Wachutka, Esq.

Brian Harris, Esq.

Dr. Michael F. Kennedy Edward Williamson, Esq.

Michael.Kennedy@nrc.gov John Tibbetts, Paralegal beth.mizuno@nrc.gov Dr. Richard E. Wardwell jeremy.wachutka@nrc.gov Richard.Wardwell@nrc.gov brian.harris@nrc.gov edward.williamson@nrc.gov john.tibbetts@nrc.gov Nicole Pepperl, Law Clerk Vermont Department of Public Service Nicole.Pepperl@nrc.gov 112 State Street - Drawer 20 Montpelier, VT 05620-2601 Aaron Kisicki, Esq.

aaron.kisicki@state.vt.us U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Mail Stop: O-7H4M Washington, DC 20555-0001 ocaamail@nrc.gov

DOCKET NO. 50-271-LR ORDER (Rescheduling Pre-Hearing Conference Call)

U.S. Nuclear Regulatory Commission Entergy Services, Inc.

Office of the Secretary of the Commission 101 Constitution Ave., NW Mail Stop: O-16C1 Washington, DC 200012133 Washington, DC 20555-0001 Susan Raimo, Esq.

Hearing Docket sraimo@entergy.com hearingdocket@nrc.gov

[Original signed by Brian Newell ]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 29th day of October, 2014 2