ML14300A171

From kanterella
Jump to navigation Jump to search
IAEA Form 71 - Design Information Questionnaire - All Facilities
ML14300A171
Person / Time
Issue date: 11/30/2017
From:
NRC/OCIO/GEMSD/IMSB
To:
References
Download: ML14300A171 (2)


Text

INTERNATIONAL ATOMIC ENERGY AGENCY DEPARTMENT OF SAFEGUARDS AND INSPECTION CONFIDENTIAL WHEN COMPLETED Estimated burden per response to comply with this mandatory collection request: 360 hours0.00417 days <br />0.1 hours <br />5.952381e-4 weeks <br />1.3698e-4 months <br />.

NRC is required to collect this information for reporting to IAEA from facility licensees appearing on the U.S. Eligible List. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0056), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

APPROVED BY OMB: NO. 3150-0056 EXPIRES: 08/31/2020 DESIGN INFORMATION QUESTIONNAIRE

  • IAEA USE ONLY IAEA USE ONLY COUNTRY COUNTRY OFFICER TYPE DATE OF INITIAL DATA VERIFICATION LAST REVIEWING AND UPDATING The purpose of this document is to obtain the facility design information required by the Agency in order to discharge its safeguards responsibilities. It will also serve as a check list for examination of design information by Agency inspector(s). If, in any area, insufficient space is available, add additional sheets to the extent necessary.

The "Confidential" marking on this form is for IAEA purposes only. It indicates that the IAEA considers the information in the completed form to be 'safeguards confidential' and is not to be confused with any U.S. security classification.

  • Questions which are not applicable may be left unanswered.

CONFIDENTIAL WHEN COMPLETED N-71 (11-2017)

GENERAL INFORMATION ALL FACILITIES DATE:

1. NAME OF THE FACILITY (Include usual abbreviation)
2. LOCATION AND POSTAL ADDRESS
3. OWNER (legally responsible)
4. OPERATOR (legally responsible)
5. DESCRIPTION (main features only)
6. PURPOSE
7. STATUS (planned; under construction; in operation)
8. CONSTRUCTION SCHEDULE DATES (if not in operation)

Start of Construction Commissioning Operation

9. NORMAL OPERATING MODE (days only, two-shift, three-shift; number of days/annum, etc.)
10. FACILITY LAYOUT (structural containment, fences, access, nuclear material storage areas, laboratories, waste disposal areas, routes followed by nuclear material, experimental, and test areas, etc.)
11. SITE LAYOUT (site plan showing in sufficient detail; location, premises and perimeter of facility, other buildings, roads, railways, rivers, etc.

DRAWING(S) ATTACHED UNDER REF. NOS.

DRAWING(S) AND/OR MAPS ATTACHED UNDER REF. NOS.

CONFIDENTIAL

12. NAMES AND/OR TITLE AND ADDRESS OF RESPONSIBLE OFFICERS (for nuclear material accountancy and control and contact with the Agency. If possible, attach organization charts showing position of officers) 2 N-71 (11-2017)