SAFEGUARDS INFORMATION SEntergy Entergy Nuclear Generation Company Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 September 25, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Response to Additional Requests for Information (RAI)
Re: 10 CFR 50.54(p)(2) changes to Security Plans
References:
- 1. USNRC Letter to Entergy, Request for Additional Information Regarding Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 11 (Letter No. 1.14.059)
- 2. Entergy Letter to USNRC, Physical Security Plan, Revision 11, dated February 19, 2014 (Letter No. 2.12.049)
LETTER NUMBER: 2.14.068
Dear Sir or Madam:
By Reference 1, the NRC issued a request for additional information (RAI) regarding Revision 11 to the Pilgrim Physical Security Plan that was submitted by Reference 2. Attachment 1 to this letter provides Entergy's response to NRC RAI. to this letter contains Safeguards Information as defined in 10 CFR 73.21(e).
Therefore, Entergy requests Attachment 1 to this letter be withheld from public disclosure.
There are no new commitments contained in this letter.
Please contact me at (508) 830-8320, if you require additional information.
Sincerely, SecurityMaenpage Security Manager NOTE: ATTACHMENT 1 TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF ATTACHMENT 1, THIS LETTER IS "DECONTROLLED."
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION Entergy Nuclear Operations, Inc.
Letter Number: 2.14.068 Pilgrim Nuclear Power Station Page 2 Attachment I - Response to Requests for Additional Information (2 pages) cc (with attachments):
Mr. William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406 cc (w/o attachments):
Ms. Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North O-8C2 11555 Rockville Pike Rockville, MD 20852 Senior Resident Inspector Pilgrim Nuclear Power Station NOTE: ATTACHMENT 1 TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF ATTACHMENT 1, THIS LETTER IS "DECONTROLLED."
SAFEGUARDS INFORMATION