UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 17, 2014 Mr. Dennis Madison Vice President Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Madison:
From October 27 - November 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) will perform a supplemental inspection at the Vogtle Electric Generating Plant. The inspection will evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection Procedure (IP) 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area.
To minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up-to-date and complete, thereby minimizing the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be George Gunn of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Mark E. Speck at 404-997-4759 (Mark.Speck@nrc.gov), or the Chief, Plant Support Branch 1, Brian Bonser at 404-997-4653.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records
D. Madison 2
(PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81
Enclosure:
Supplemental Inspection Document Request List cc: Distribution via Listserv
ML14260A455 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRS/PSB1 SIGNATURE MES4 BRB1 NAME M. Speck B. Bonser DATE 9/ 17 /2014 9/ 17 /2014 E-MAIL COPY YES NO YES NO
Enclosure Supplemental Inspection Document Request List Inspection Dates:
October 27 - November 1, 2014 Inspection Procedures:
IP 95001Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area Note: This is a list of the documents to be delivered to the NRC Region II Office (245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257, Attention: Mark Speck) as soon as practical. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available (the preferred file format is Word or searchable.pdf files on CDROM or thumb drive). Please organize the information as it is arranged below. It is not the intent that large or burdensome data be scanned for this purpose.
This data will be inspected using original documentation. If there are questions regarding the documents requested, please do not hesitate to contact the inspector.
Final causal analysis, extent of condition analysis, and supporting documents related to the Notice of Violation (NOV).
List of analysis team members, team charter, qualifications of team members.
Documentation of corrective actions taken and/or proposed determined to be appropriate for all root and contributing causes (e.g., procedure changes, training requirements, records, etc.).
Actions performed, or proposed, determined to be adequate to demonstrate/verify effectiveness of corrective actions.
Results of any effectiveness reviews, audits, self-assessments, mock inspections, etc., used to validate preparation for the inspection.
Site procedures governing causal analysis performance and corrective action program (CAP) procedures.
Inspector Contact Information:
Mark E. Speck 245 Peachtree Center Avenue, SE Suite 1200 Atlanta, GA 30303 404-997-4759 Mark.Speck@nrc.gov