ML14259A004

From kanterella
Jump to navigation Jump to search
Lr Hearing - Draft RAIs Indian Point SAMA Cost Estimates
ML14259A004
Person / Time
Site: Indian Point  
Issue date: 09/16/2014
From:
Office of Nuclear Material Safety and Safeguards
To:
References
Download: ML14259A004 (4)


Text

1 IPRenewal NPEmails From:

Wentzel, Michael Sent:

Tuesday, September 16, 2014 7:01 AM To:

Waters, Roger M.

Cc:

Walpole, Robert W

Subject:

RE: Draft RAIs re: Indian Point SAMA Cost Estimates Attachments:

DRAI 7.docx

Roger, We identified one additional question we would like to ask, which Ive attached. If you have any questions, please let me know.
Thanks, Mike From: Waters, Roger M. [1]

Sent: Monday, September 15, 2014 12:53 PM To: Wentzel, Michael Cc: Walpole, Robert W

Subject:

Draft RAIs re: Indian Point SAMA Cost Estimates

Mike, Entergy is reviewing these RAIs and we have an internal conference call set for Wednesday of this week. Ill let you know by Thursday if we would like a clarification call or not.
Thanks, Roger Waters IPEC Regulatory Assurance 914-254-7714 From: Wentzel, Michael [2]

Sent: Monday, September 08, 2014 4:13 PM To: Walpole, Robert W

Subject:

Draft RAIs re: Indian Point SAMA Cost Estimates

Bob, Ive attached a draft copy of RAIs related to the NRCs review of Entergys revised SAMA cost estimates.

Please let me know if you feel a clarifying phone call would be helpful prior to issuance.

Thanks, Mike Michael Wentzel Project Manager NRR/DLR/RPB2 (301) 415-6459

2 michael.wentzel@nrc.gov

Hearing Identifier:

IndianPointUnits2and3NonPublic_EX Email Number:

4624 Mail Envelope Properties (C0A338EE37A11447B136119705BF9A3F0214F9BAD438)

Subject:

RE: Draft RAIs re: Indian Point SAMA Cost Estimates Sent Date:

9/16/2014 7:00:39 AM Received Date:

9/16/2014 7:00:59 AM From:

Wentzel, Michael Created By:

Michael.Wentzel@nrc.gov Recipients:

"Walpole, Robert W" <rwalpol@entergy.com>

Tracking Status: None "Waters, Roger M." <rwater1@entergy.com>

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 1251 9/16/2014 7:00:59 AM DRAI 7.docx 18066 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

DRAI 7 In the Implementation Estimate Worksheets for the 22 refined cost estimates, you include the following hourly rates for various activities conducted by Entergy plant personnel:

$100 for systems engineering

$120 for project management

$120 for training operations staff

$75 or $80 for quality assurance/quality control verification

$100 for design engineering

$80 or $100 for health physics, radiation protection, ALARA However, the basis for these rates was not provided. Explain the basis for these hourly rates and state whether these are standard rates used for all Entergy engineering project estimations.

Also state whether these are 2014 rates or older rates inflated to 2014 (such as was done with billed craft labor rates). If these rates were inflated, please indicate what inflation rate was used to arrive at the values. Lastly, explain what these hourly rates reflect (e.g., hourly rate +

employer costs + overhead).