ML14255A073
| ML14255A073 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 09/11/2014 |
| From: | Hironori Peterson Division of Reactor Safety III |
| To: | Davison K Northern States Power Co |
| Michael Bielby | |
| References | |
| Download: ML14255A073 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 September 11, 2014 Mr. Kevin Davison Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2; REQUALIFICATION PROGRAM INSPECTION
Dear Mr. Davison:
In a telephone conversation on September 4, 2014, Mr. T. Ouret, General Supervisor Operations Training, and Mr. M. Bielby, Lead Inspector, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect a portion of your Requalification Program at your Prairie Island Nuclear Generating Plant, Units 1 and 2. Mr. Bielby will review the scenarios and Job Performance Measures to be administered the week of the inspection and observe the Training Departments administration of that requalification examination in accordance with Inspection Procedure 71111.11B. The inspection is planned for September 23 - 26, 2014, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved Requalification Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. The NRC will review the operating test scheduled for the week of September 22, 2014, at the site. Therefore it will not be necessary to provide any material in advance of this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. M. Bielby at 630-829-9762, or I can be reached at 630-829-9707.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 cc: Distribution via LISTSERV
Mr. Kevin Davison Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2; REQUALIFICATION PROGRAM INSPECTION
Dear Mr. Davison:
In a telephone conversation on September 4, 2014, Mr. T. Ouret, General Supervisor Operations Training, and Mr. M. Bielby, Lead Inspector, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect a portion of your Requalification Program at your Prairie Island Nuclear Generating Plant, Units 1 and 2. Mr. Bielby will review the scenarios and Job Performance Measures to be administered the week of the inspection and observe the Training Departments administration of that requalification examination in accordance with Inspection Procedure 71111.11B. The inspection is planned for September 23 - 26, 2014, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved Requalification Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. The NRC will review the operating test scheduled for the week of September 22, 2014, at the site. Therefore it will not be necessary to provide any material in advance of this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. M. Bielby at 630-829-9762, or I can be reached at 630-829-9707.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 cc: Distribution via LISTSERV DOCUMENT NAME: Ltr 091114 Prairie Island Requalification Program Inspection (MEB).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MBielby:bl HPeterson DATE 09/10/14 09/11/14 OFFICIAL RECORD COPY
Letter to Kevin Davison from Hironori Peterson dated September 11, 2014
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2; REQUALIFICATION PROGRAM INSPECTION DISTRIBUTION John Jandovitz RidsNrrPMPrairieIsland Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu Scott Sloan