UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 September 5, 2014 Mr. Michael J. Pacilio Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Pacilio:

In a telephone conversation on September 4, 2014, Mr. E. Pannell, Operations Training Manager, and Mr. B. Palagi, Lead Inspector, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect a portion of your Requalification Program at the Quad Cities Nuclear Power Station.

Mr. Palagi will review the scenarios and Job Performance Measures to be administered the week of the inspection and observe the Training Departments administration of that requalification examination in accordance with Inspection Procedure 71111.11B. The inspection is planned for October 14 - 16, 2014, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved Requalification Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's Inspection Program needs. The NRC will review the operating test scheduled for the week of October 13, 2014, at the site. Therefore it will not be necessary to provide any material in advance of this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via LISTSERV

Mr. Michael J. Pacilio Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Pacilio:

In a telephone conversation on September 4, 2014, Mr. E. Pannell, Operations Training Manager, and Mr. B. Palagi, Lead Inspector, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect a portion of your Requalification Program at the Quad Cities Nuclear Power Station.

Mr. Palagi will review the scenarios and Job Performance Measures to be administered the week of the inspection and observe the Training Departments administration of that requalification examination in accordance with Inspection Procedure 71111.11B. The inspection is planned for October 14 - 16, 2014, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved Requalification Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's Inspection Program needs. The NRC will review the operating test scheduled for the week of October 13, 2014, at the site. Therefore it will not be necessary to provide any material in advance of this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via LISTSERV DOCUMENT NAME: Ltr 090514 Quad Cities Requalification Program Inspection (BBP).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME BPalagi:bl HPeterson DATE 09/05/14 09/05/14 OFFICIAL RECORD COPY Letter to Michael J. Pacilio from Hironori Peterson dated September 5, 2014