NL-14-1111, Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)

From kanterella
(Redirected from ML14239A297)
Jump to navigation Jump to search

Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)
ML14239A297
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/26/2014
From: Pierce C
Southern Co, Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-051, NL-14-1111
Download: ML14239A297 (6)


Text

Charles R. Pierce Southern Nuclear Regulatory AffairsDirector Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 AUG 2 6 2014 Birmingham. AL 35201 sGummm^

COMPWff Docket Nos.:

50-424 NL-14-1111 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant - Units 1 and 2 Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)

References:

1.

NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12,2012.

2.

NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29, 2012.

3.

NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, To ModifyLicenses with Regard to Reliable Spent Fuel Pool Instrumentation, Revision 1, dated August 2012.

4.

Vogtle Electric Generating Plant - Units 1 and 2 Initial Status Report in Response to Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051), dated October 23,2012.

5.

Vogtle Electric Generating Plant - Units 1 and 2 Overall Integrated Plan in Response to Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051), dated February 27, 2013.

Ladies and Gentlemen:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference 1) to Southern Nuclear Operating Company. Reference 1 was immediately effective and directs the Vogtle Electric Generating Plant - Units 1 and 2 (VEGP) to install reliable spent fuel pool instrumentation. Specific requirements are outlined in Attachment 2 of Reference 1.

Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference 2) and an overall integrated plan pursuant to Section IV, Condition C.I.a of Reference 1. Reference 2 endorses industry guidance document NE112-02, Revision 1 (Reference 3) with clarifications and exceptions identified in Reference 2. Reference 4 provided the VEGP initial status report regarding spent fuel pool instrumentation strategies. Reference 5 provided the VEGP overall integrated plan.

U. S. Nuclear Regulatory Commission NL-14-1111 Page 2 Reference 1 requires submission of a status report atsix-month intervals following submittal of the overall integrated plan. Reference 3 provides direction regarding the content of thestatusreports. The purpose of this letter istoprovide thethird six-month status report pursuant toSection IV, Condition C.2, ofReference 1,that delineates progress made in implementing the requirements of Reference 1. The enclosed report provides an update of milestone accomplishments since the last status report, including any changes tothe compliance method, schedule, or need for relief and the basis, ifany.

This lettercontains no new NRC commitments. If you have any questions, please contact John Giddens at 205.992.7924.

Mr. C. R. Pierce states he isthe Regulatory Affairs Director for Southern Nuclear Operating Company, isauthorized toexecute this oath on behalf of Southern Nuclear Operating Company and, tothe bestof his knowledge and belief, the facts set forth in this letter are true.

Respectfully submitted, C. R. Pierce I ~

Regulatory Affairs Director

\\

CRP/JMG/GS Sworn to and subscribed before me this day of

, 2014.

Notary Public Mycommission expires:

Enclosure:

Vogtie Electric Generating Plant-Units 1 and 2 Third Six-Month Status Report Regarding Reliable Spent Fuel Pool Instrumentation (EA-12-051) cc:

Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President &CEO Mr. D. G. Bost, Executive Vice President&Chief Nuclear Officer Mr. D. R. Madison, Vice President - Vogtie 1 &2 Mr. B. L Ivey, Vice President-Regulatory Affairs Mr. T. E. Tynan, Vice President - Fleet Operations Mr. B. J. Adams, Vice President - Engineering Mr. S. C.Waldrup, Regulatory Affairs Manager - Vogtie 1 &2 RType: CVC7000

U. S. Nuclear Regulatory Commission NL-14-1111 Page 3 U. S. Nuclear Regulatory Commission Mr. D. H. Dorman, Director of the Officeof Nuclear Reactor Regulations (Acting)

Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager - Vogtle 1 &2 Mr. L. M. Cain, Senior Resident Inspector - Vogtle 1 &2 Mr. B. A. Purneil, NRR/JLD/PMB Mr. 8. R. Jones, NRR/DSS/SBPB State of Georgia Mr. J. H. Turner, Environmental Director Protection Division

Vogtle Electric Generating Plant - Units 1 and 2 Third Six-Month Status Report of the implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool instrumentation fEA-12-051 >

Enclosure Vogtle Electric Generating Plant - Units 1 and 2 Third Six-Month Status Report Regarding Reliable Spent Fuel Pool Instrumentation (EA-12-051)

Enclosure to NL-14-1111 Third Six-Month Status Report of SFPI 01P Implementation Vogtle Electric Generating Plant - Units 1 and 2 Third Six-Month Status Report Regarding Reliable Spent Fuel Pool Instrumentation (EA-12-051) 1 Introduction Vogtle Electric Generating Plant Units 1 and 2 developed an Overall Integrated Plan (Reference 1 of this enclosure), documenting the requirements to install reliable spent fuel pool (SFP) instrumentation, in response to Reference 2. This attachment provides an update of milestone accomplishments since submittal of the last status report, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, ifany.

2 Milestone Accomplishments In addition to the submittal of status reports, the following milestone{s) directly related to SFP instrumentation implementation have been completed since the previous 6-month update, and are current as of June 30,2014:

Develop Modifications Unit 2 Receipt of Unit 2 SFP Instrument Channel Receipt of Unit 1 SFP Instrument Channel 3

Milestone Schedule Status The table on the following page provides an update to the milestone schedule to support the Overall Integrated Plan. This section provides the activity status of each item, and the expected completion date noting any change. The dates are planning dates subject to change as design and implementation details are developed.

Milestone Target Completion Date Activity Status Revised Target Completion Date Submit 60 Day Status Report Oct 2012 Complete N/A Submit Overall Integrated Plan Feb 2013 Complete N/A Unit21stRF0 Apr 2013 Complete N/A June 18,2013 RAIs submittal due Jul18,2013 Complete N/A Submit 6 Month Status Report Aug 2013 Complete N/A Develop Modifications Unit 2 May 2014 Complete N/A Submit 6 Month Status Report Feb 2014 Complete N/A Unit 1 1st RFO Apr 2014 Complete N/A Receipt of Unit 2 SFP Instrument Channel Jun 2014 Complete N/A Develop Modifications Unit 1 Nov 2014 In Progress Dec 2014 Complete Functional Test of Unit 2 SFP Instruments 30 2014 Started Submit 6 Month Status Report Aug 2014 Complete N/A Unit 2 Implementation Complete (2nd RFO)*

Oct 2014 Not Started Receipt of Unit 1 SFP Instrument Channel Dec 2014 Complete N/A Submit 6 Month Status Report Feb 2015 Not Started Submit 6 Month Status Report Aug 2015 Not Started Complete Functional Test of Unit 1 SFP Instruments 30 2015 Not Started Unit 1 Implementation Complete (2nd RFO)*

Oct 2015 Not Started Submit Completion Report Dec 2015 Not Started

'Full compliance after second listed refueling outage E-1

Enclosure to NL-14-1111 Third Six-Month Status Report of SFPI OIP Implementation 4

Changes to Compliance Method There are no changes to the compliance method as documented in the Overall Integrated Plan (Reference 1 of this enclosure). Since the method of providing portable generation to the SFP Instrumentation will not be in place until the FLEX modifications are implemented, a standing order and associated procedures will initially be in place for Unit2 which \\mII allow for temporary portable generation.

5 Need for Relief/Relaxation and Basis for the Relief/Relaxation Vogtle Electric Generating Plant Units 1 and 2 expects to comply with the order implementation date and no relief/relaxation is required at this time.

6 Open Items from Interim Staff Evaluation As discussed with the NRC staff, the Interim Staff Evaluation (ISE) Open Items for SFP Instrumentation are the only remaining issues. The NRC provided thirteen (13) requests for additional information (RAIs) by letter on November 4, 2013. These RAIs have been addressed by separate SNC E-Portal postings on March 25, 2014 and June 29, 2014.

7 Potential Interim Staff Evaluation Impacts There are no potential impacts to the Interim Staff Evaluation identified at this time except for those identified in Section 6.

8 References The following references support the updates to the Overall Integrated Plan described in this attachment:

1. Vogtle ElectricGenerating Plant Units 1 and 2 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," dated February 27, 2013.

2.

NRC Order Number EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012.

3.

"Interim Staff Evaluation and Request for Additional Information - Vogtle Electric Generating Plant, Units 1 and 2 (VEGP) Regarding Overall Integrated Plan (OIP) for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (TAC NOS. MF0723 and MF0724), dated November 4, 2013.

9 Other Additional Information The following information provides clarity or corrections to the Overall Integrated Plan but do not constitute a change in strategy; Although not explicitly stated inthe response to RAI 3 posted on the Portal on June 29, 2014, Vogtle Electric Generating Plant Units 1 and 2 will not be using a stilling well.

E-2