PLA-7186, Transmittal of Final Seismic Walkdown Report for Inaccessible Equipment, Unit 1, and Common Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Walkdown

From kanterella
(Redirected from ML14226A020)
Jump to navigation Jump to search
Transmittal of Final Seismic Walkdown Report for Inaccessible Equipment, Unit 1, and Common Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Walkdown
ML14226A020
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/30/2014
From: Rausch T
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14226A019 List:
References
PLA-7186
Download: ML14226A020 (2)


Text

Timothy S. Rausch PPL Susquehanna, LLC Senior Vice President & Chief Nuclear Officer 769 Salem Boulevard IT I 0Z Betwick, PA 18603 Tel. 570.542.3345 Fax 570.542.1504 tsrausch@pplveb.com JUL 3 0 2014 10 CFR 50 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION FINAL SEISMIC WALKDOWN REPORT FOR INACCESSIBLE EQUIPMENT - UNIT 1 AND COMMON REGARDING FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.3:

SEISMIC WALKDOWN Docket Nos. 50-387 PLA-7186 and 50-388 References. 1) NRC Letter, "Requestfor Information Pursuantto Title 10 of the Code of Federal Regulations 50.54( ) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insightsfr'om the FukushimaDai-Ichi Accident,"

dated March 12, 2012.

2) PPL Letter (PLA-6941), "Response to Requestfor Information Puirsuantto 10 CFR 50.546) RegardingResults of Seismic Walkdown, "dated November 26, 2012.

On March 12, 2012, the NRC staff issued a letter entitled "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident," (Reference 1). Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic Walkdowns.

In Reference 2, PPL Susquehanna, LLC (PPL) provided the Seismic Walkdown Report for Unit 1 with a commitment to revise the report to include inaccessible equipment 60 days after the end of the Unit 1 Spring 2014 outage. This letter transmits the revised report. Changes from the original report have been identified with revision bars.

PPL requests that Enclosure 1 to this letter be withheld under 10 CFR 2.390. The information contained in these enclosures represents security-related information as defined in 10 CFR 2.390.

No regulatory commitments are contained in this letter. c I

Document Control Desk PLA-7186 If you have any questions regarding the content of this letter, please contact Mr. John L. Tripoli, Manager, Nuclear Regulatory Affairs, at (570) 542-3100.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on -. ,[ ,1.,

Enclosure:

Seismic Walkdown Report for Inaccessible Equipment - Unit I and Common - Security-Related Information - Withhold Under 10 CFR 2.390 Copy: J. E. Greives, NRC Sr. Resident Inspector J. A. Whited, NRC Project Manager L. J. Winker, PA DEP/BRP Region I Administrator, NRC