Correction of Amendment No 252
ML14223B228
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 08/18/2014
From: Joel Wiebe
Plant Licensing Branch III
To: Pacilio J
Exelon Generation Co, Exelon Nuclear
Joel Wiebe, NRR/DORL 415-6606
References
TAC MF2688
Download: ML14223B228 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 18, 2014 Mr. Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNIT 1 -CORRECTION OF AMENDMENT NO. 252 (TAC NO. MF2688)

Dear Mr. Pacilio:

The U.S. Nuclear Regulatory Commission has issued Amendment No. 252 to Renewed Facility Operating License No. DPR-29 for Quad Cities Nuclear Power Station, Unit 1, on July 21, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14085A534). The license page contained two inadvertent changes not associated with the issued amendment. The first inadvertent change removed the "s" from the word provisions in the first sentence of the first paragraph in Section E. The second inadvertent change modified the amendment number from 249 to 247 in the second paragraph of Section E.

A copy of the corrected license page is enclosed.

Sincerely, tU ;t-Joel S. Wiebe, Senior Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-254

Enclosure:

As stated cc w/encls: Distribution via Listserv

B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 252 are hereby incorporated into this renewed operating I License. The licensee shall operate the facility in accordance with the Technical Specifications.

C. The licensee shall maintain the commitments made in response to the March 14, 1983, NUREG-0737 Order, subject to the following provision:

The licensee may make changes to commitments made in response to the March 14, 1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitted to the NRC staff for review and approval prior to implementation of the change.

D. Equalizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.

E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined sets of plans 1 , which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Quad Cities Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17, 2006.

Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The Exelon Generation Company CSP was approved by License Amendment No. 249.

F. The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Reports dated July 27, 1979, with supplements dated November 5, 1980, and 1

The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan Renewed License No. DPR-29 Amendment No. 252

Mr. Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNIT 1 -CORRECTION OF AMENDMENT NO. 252 (TAC NO. MF2688)

Dear Mr. Pacilio:

The U.S. Nuclear Regulatory Commission has issued Amendment No. 252 to Renewed Facility Operating License No. DPR-29 for Quad Cities Nuclear Power Station, Unit 1, on July 21, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14085A534). The license page contained two inadvertent changes not associated with the issued amendment. The first inadvertent change removed the "s" from the word provisions in the first sentence of the first paragraph in Section E. The second inadvertent change modified the amendment number from 249 to 247 in the second paragraph of Section E.

A copy of the corrected license page is enclosed.

Sincerely, IRA/

Joel S. Wiebe, Senior Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-254

Enclosure:

As stated DISTRIBUTION:

PUBLIC LPL3-2 R/F RidsNrrDorllpl3-2 Resource RidsNrrDirsltsb Resource RidsNrrDoriDpr Resource RidsNrrPMQuadCities Resource RidsNrrLASRohrer Resource RidsRgn3MaiiCenter Resoruce RidsAcrsAcnw_MaiiCTR Resource Accession No ML14220A521 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC LPL3-2/PM NAME JWiebe SRohrer TTate JWiebe DATE 8/18/14 8/18/14 8/18/14 8/18/14 OFFICIAL RECORD COPY