CNS-14-091, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Cask

From kanterella
(Redirected from ML14219A571)
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Cask
ML14219A571
Person / Time
Site: Catawba, 07201031  Duke Energy icon.png
Issue date: 08/06/2014
From: Henderson K
Duke Energy Carolinas, Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
CNS-14-091
Download: ML14219A571 (2)


Text

Kelvin Henderson DUKE Vice President ENERGY. Catawba Nuclear Station Duke Energy CNO1VP 1 4800 Concord Road York, SC 29745 CNS-1 4-091 o: 803.701.4251 f: 803.701.3221 August 6, 2014 10 CFR 72.212 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Duke Energy Carolinas, LLC (Duke Energy)

Catawba Nuclear Station, Units 1 and 2 Facility Operating License Numbers NPF-35 and NPF-52 Docket Numbers 50-413 and 50-414 Independent Spent Fuel Storage Installation (ISFSI)

ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Cask Catawba Nuclear Station is currently loading spent nuclear fuel into NAC-MAGNASTOR dry cask storage systems (Model Number MAGNASTOR) as controlled by Certificate of Compliance Number 1031, Amendment Number 2. In accordance with 10 CFR 72.212(b)(2), Duke Energy hereby registers the use of Cask Identification Number CN-VCC-75. Loading of this cask was completed and the cask was placed on the ISFSI pad on July 23, 2014.

There are no NRC commitments contained in this letter.

Please direct questions on this matter to L.J. Rudy, Catawba Regulatory Affairs, at (803) 701-3084.

Very truly yours, Kelvin Henderson Vice President, Catawba Nuclear Station LJR/s www.duke-energy.com

Document Control Desk Page 2 August 6, 2014 xc:

V.M. McCree Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G.A. Hutto, Ill, Senior Resident Inspector U.S. Nuclear Regulatory Commission Catawba Nuclear Station G.E. Miller, Project Manager (addressee only)

U.S. Nuclear Regulatory Commission Mail Stop 8 G9A Washington, D.C. 20555