UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 11, 2014 LICENSEES: Exelon Generation Company, LLC FACILITIES: Peach Bottom Atomic Power Station, Units 2 and 3
SUBJECT:
SUMMARY
OF PUBLIC TELECONFERENCE HELD ON JULY 14, 2014, WITH EXELON GENERATION COMPANY, LLC TO DISCUSS THE U.S. ARMY CORPS OF ENGINEERS FLOODING HAZARD REEVALUATION FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAG NOS. MF3991 AND MF3992)
On July 14, 2014, a public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Exelon Generation Company, LLC (Exelon). The purpose of the teleconference was to discuss the U.S. Army Corps of Engineers (USAGE) flooding hazard reevaluation (FHR) for Peach Bottom Atomic Power Station (PBAPS, Peach Bottom), Units 2 and 3. A list of attendees is provided in the Enclosure. The meeting notice and agenda is available at Agencywide Documents Access and Management System (ADAMS)
Accession No. ML14191A002.
The USAGE FHR for Peach Bottom is being done under contract to the NRC. USAGE is working with other Federal agencies to perform the analysis. These agencies include the Federal Energy Regulatory Commission (FERC). FERC is in the process of reviewing Exelon Hydro's relicensing application for the Conowingo Hydroelectric station which is downstream of Peach Bottom 2 and 3. Because the potential for flooding is an issue that is being reviewed by FERC as part of the Conowingo Hydroelectric station relicensing process, USAGE is working closely with FERC to ensure lessons-learned from FERCs review of flooding issues associated with the Conowingo dam and USAGE's PBAPS FHR issues are shared.
Highlights from the meeting included the following:
- Exelon nuclear will be participating in a FERC led meeting on July 17, 2014, to discuss the Conowingo hydroelectric station relicensing. The purpose of Exelon Nuclear's participation is to understand how the FERC flooding analysis maybe used by the USAGE to perform its FHR.
- The NRC staff confirmed that the USAGE will be performing a river-wide probable maximum precipitation analysis for the Susquehanna River consistent the guidance found in Japan Lessons-Learned Directorate (JLD), Interim Staff Guidance (ISG) JLD-ISG-2013-01, "Guidance for Assessment of Flooding Hazards Due to Dam Failure."
(ADAMS Accession No. ML13151A153)
- The NRC staff stated that it would use the USAGE FHR as a tool to review the Three Mile Island (TMI) Unit 1 flooding hazard reevaluation report (FHRR) that was submitted on March 12, 2013 (ADAMS Accession No. ML13093A260). The NRC staff intends to
compare the USACE analysis against the TMI Unit 1 FHRR and if there are significant differences between the two analyses the NRC staff could ask questions in this area.
- The NRC staff will assist in transmitting to the USACE, Exelon's Hydrologic Engineering Centers River Analysis System (HEC-RAS) model that was developed for the Susquehanna River. The thought is that Exelon's HEC-RAC model will allow the USACE to develop portions of its model of the Susquehanna River basin more efficiently.
Docket Nos. 50-277 and 50-278
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES U.S. NUCLEAR REGULATORY COMMISSION JULY 14. 2014. MEETING WITH EXELON GENERATION COMPANY. LLC TO DISCUSS FLOODING HAZARD REEVALUATION FOR PEACH BOTTOM ATOMIC POWER STATION. UNITS 2 AND 3 DOCKET NOS. 50-277, 50-278 Name Organization Sheena Whaley U.S. Nuclear Regulatory Commission (NRC)
Andy Campbell NRC Christopher Cook NRC George Wilson NRC Brad Harvey NRC Barb Hayes NRC Ken See NRC Rick Ennis NRC Rob Kuntz NRC Joe Sebrosky NRC Chuck Behrend Exelon, Director, Severe Accident Management Vinod Aggarwal Exelon, Manager, Severe Accident Management Joe Bellini Exelon, Engineer, Severe Accident Management Ron Gaston Exelon, Corporate Licensing Manager Frank Mascitelli Exelon, Corporate Licensing Engineer Eric Gwin Exelon, Project Manager- Peach Bottom Frank Giaco Exelon, Engineering Manager- Peach Bottom Exelon, Senior Regulatory Specialist- Peach Bill Nelle Bottom Jesse Lucas Exelon, Senior Engineer- Peach Bottom B. McSorley Exelon, Senior Engineer-TMI Richard Gropp Exelon, Corporate Licensing Engineer Jay Campbell Exelon Power Enclosure
compare the USAGE analysis against the TMI Unit 1 FHRR and if there are significant differences between the two analyses the NRC staff could ask questions in this area.
- The NRC staff will assist in transmitting to the USAGE, Exelon's Hydrologic Engineering Centers River Analysis System (HEC-RAS) model that was developed for the Susquehanna River. The thought is that Exelon's HEC-RAC model will allow the USAGE to develop portions of its model of the Susquehanna River basin more efficiently.
Please direct any inquiries to me at 301-415-1132 or Joseph.Sebrosky@nrc.gov.
IRA!
Joseph M. Sebrosky, Senior Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC JLD RIF RidsAcrsAcnw_MaiiCTR Resource RidsNrrDORLLPL 1-2 Resource RidsNrrPMPeachBottom Resource RidsRgn1 MaiiFCenter Resource RidsNrrLASLent Resource RKuntz, JLD JUribe, JLD EMiller, DORL CCook, NRO/RHM1 BHarvey, NRO/RHM1 ADAMS A ccess1on NOS. M eetmg N ot1ce . ML14191A002 Mee t"mg S ummary ML14216A264 v1a ema1"I OFFICE NRRIJLD/JHMB/PM NRR/JLD/JHMB//LA NRR/DORULPL 1-2/PM* NRO/DSEAIRHM1/BC* NRR/JLD/JHMB/BC NRR/JLD/JHMB/PM NAME JSebrosky Slent REnnis CCook SWhaley JSebrosky DATE 08/11/14 08/04/14 08/05/14 08/05/14 08/11/14 08/11/14 OFFICIAL RECORD COPY