MONTHYEARIR 05000461/20240032024-11-0505 November 2024 Integrated Inspection Report 05000461/2024003 IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 IR 05000461/20230062024-02-28028 February 2024 Annual Assessment Letter for Clinton Power Station (Report 05000461/2023006) IR 05000461/20230042024-02-0202 February 2024 Integrated Inspection Report 05000461/2023004 IR 05000461/20234022023-12-27027 December 2023 Security Baseline Inspection Report 05000461/2023402 IR 05000461/20235012023-12-0505 December 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2023501 IR 05000461/20230032023-11-0808 November 2023 Integrated Inspection Report 05000461/2023003 IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 IR 05000461/20234202023-08-29029 August 2023 – Security Baseline Inspection Report 05000461/2023420 IR 05000461/20230052023-08-25025 August 2023 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2023005) IR 05000461/20230022023-08-0404 August 2023 Integrated Inspection Report 05000461/2023002 IR 05000461/20234012023-07-19019 July 2023 Cyber Security Inspection Report 05000461/2023401 IR 05000461/20230102023-05-26026 May 2023 Triennial Fire Protection Inspection Report 05000461/2023010 IR 05000461/20230012023-05-0404 May 2023 Integrated Inspection Report 05000461/2023001 IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) ML23039A1852023-02-10010 February 2023 Integrated Inspection Report 05000461/2022004 07201046/2022001 IR 05000461/20220112023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000461/2022011 IR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 IR 05000461/20224032022-11-28028 November 2022 Material Control and Accounting Program Inspection Report 05000461/2022403 (Public) IR 05000461/20220032022-11-10010 November 2022 Integrated Inspection Report 05000461/2022003 IR 05000461/20220052022-08-22022 August 2022 Updated Inspection Plan for Clinton Power Station (Report 05000461/2022005) IR 05000461/20220022022-07-27027 July 2022 Integrated Inspection Report 05000461/2022002 IR 05000461/20220102022-06-0606 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000461/2022010 IR 05000461/20224012022-05-24024 May 2022 Security Baseline Inspection Report 05000461/2022401 IR 05000461/20220012022-04-28028 April 2022 Integrated Inspection Report 05000461/2022001 IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 IR 05000461/20210062022-03-0202 March 2022 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2021006) IR 05000461/20210042022-02-0404 February 2022 Integrated Inspection Report 05000461/2021004 IR 05000461/20215012022-01-0303 January 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2021501 IR 05000461/20210032021-10-29029 October 2021 Integrated Inspection Report 05000461/2021003 IR 05000461/20210132021-09-0303 September 2021 Temporary Instruction Report 05000461/2021013 IR 05000461/20210052021-09-0101 September 2021 Updated Inspection Plan for Clinton Power Station; Report 05000461/2021005 IR 05000461/20214022021-08-23023 August 2021 Security Baseline Inspection Report 05000461/2021402 IR 05000461/20210112021-08-20020 August 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000461/2021011 IR 05000461/20210022021-08-0909 August 2021 Integrated Inspection Report 05000461/2021002 IR 05000461/20214402021-07-15015 July 2021 Supplemental Inspection Report 05000461/2021440 and Assessment Follow Up Letter (Cover Letter Only) IR 05000461/20210122021-06-28028 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000461/2021012 IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 IR 05000461/20214012021-04-29029 April 2021 Security Baseline Inspection Report 05000461/2021401 (Cover Letter Only) IR 05000461/20210012021-04-26026 April 2021 Integrated Inspection Report 05000461/2021001 IR 05000461/20210102021-03-18018 March 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000461/2021010 IR 05000461/20200102021-03-11011 March 2021 Triennial Fire Protection Inspection Report 05000461/2020010 IR 05000461/20200062021-03-0404 March 2021 Annual Assessment Letter for Clinton Power Station Unit 1 (Report 05000461/2020006) IR 05000461/20200042021-02-0909 February 2021 Integrated Inspection Report 05000461/2020004; 07201046/2020001 2024-09-09
[Table view] Category:Letter
MONTHYEARIR 05000461/20240032024-11-0505 November 2024 Integrated Inspection Report 05000461/2024003 ML24285A1452024-10-24024 October 2024 Ltr. to Gail Cheatham, Kickapoo Tribe of Indians of the Kickapoo Reservation in Ks Re CPS Sect 106 Consult ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 ML24285A1472024-10-24024 October 2024 Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation ML24285A1422024-10-24024 October 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation ML24283A1642024-10-23023 October 2024 Summary of the 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report (EPID Number L-2024-LNE-0000)(Docket Number:50-461) ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24215A2932024-09-27027 September 2024 Scoping Summary Letter 05000461/LER-2023-002-01, Reactor Core Isolation Cooling Inoperable Prior to Mode Change2024-09-24024 September 2024 Reactor Core Isolation Cooling Inoperable Prior to Mode Change ML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24222A3952024-08-23023 August 2024 Regulatory Audit Report to Support the Review of the Amendments to Revise Reactor Water Cleanup Valve Isolation Timing IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24158A0772024-07-0303 July 2024 Notice of Consideration of Approval of Partial Site Release, Public Meeting, and Request for Comments (EPID L-2023-LLA-0088) - Letter ML24163A3252024-06-28028 June 2024 Aging Management Regulatory Audit Plan ML24163A3242024-06-28028 June 2024 LRA - Portal Letter ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24290A0942024-05-21021 May 2024 Letter from Rachael Mangum (Achp) to Stephen Koenick (NRC) License Renewal Application for the Clinton Power Station Unit 1 Dewitt County, Il, Achp Project Number: 020924 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 ML24103A1032024-05-0101 May 2024 SHPO Consultation Letter for Clinton License Renewal ML24120A3442024-04-30030 April 2024 Ltr. to Gena Kakkak, Chairman, Menominee Indian Tribe of Wisconsin; Re., CPS Section 106 Consultation ML24120A3432024-04-30030 April 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma; Re., CPS Section 106 Consultation RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24103A0992024-04-30030 April 2024 Achp Scoping Letter for Clinton License Renewal ML24120A3462024-04-30030 April 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24120A3452024-04-30030 April 2024 Ltr. to Lester Randell, Chairman, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas; Re., CPS Section 106 Consultation ML24103A1152024-04-30030 April 2024 Ltr. to Geoffrey Standing Bear, Principal Chief, the Osage Nation; Re., CPS Section 106 Consultation ML24107B0312024-04-29029 April 2024 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24089A2222024-04-11011 April 2024 LRA - Acceptance and Opportunity for Hearing - Letter 2024-09-09
[Table view] |
See also: IR 05000461/2014201
Text
SAFEGUARDS INFORMATION
July 30, 2014
Mr. Michael J. Pacilio
Senior Vice President
Exelon Generation Company
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: ERRATA FOR CLINTON POWER STATION UNIT 1 - NRC SECURITY
INSPECTION REPORT 05000461/2014201 PRELIMINARY GREATER THAN
GREEN
Dear Mr. Pacilio:
This errata corrects the cover letter (page 1) which was issued with the incorrect Inspection
Report number (05000461/201420). As stated in the report, the correct number is
05000461/2014201. Please replace the first page of the cover letter with the enclosed revised
page.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the U.S. Nuclear
Regulatory Commissions (NRC) Rules of Practice, a copy of this letter will be available
electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records component of the NRCs Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the NRC Website at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by K. Brooks for/
Robert C. Johnson, Chief
Security Performance Evaluation Branch
Division of Security Operations
Office of Nuclear Security and Incident Response
Docket No. 50-461
License No. NPF-62
Nonpublic Enclosure: Inspection Report 05000461/2014201
w/Attachments: Supplemental Information
cc w/enclosure: B. K. Taber, Site Vice President
B. Brooks, Security Manager
The enclosure transmitted herewith contains Safeguards Information. When separated from
the enclosure, this transmittal document is decontrolled.
SAFEGUARDS INFORMATION
ML14211A096
OFFICE NSIR/DSO NSIR/DSO NSIR/DSO/SPEB NSIR/DSO/SPEB NSIR/DSO
NAME R. Dexter J. Curry K. Brooks K. Brooks for/C. Johnson A. Pretzello
for/M. Layton
DATE 7/30/14 7/30/14 7/30/14 7/30/14 7/30/14
SAFEGUARDS INFORMATION
July 30, 2014
EA-14-109-1
Mr. Michael J. Pacilio
Senior Vice President
Exelon Generation Company
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: CLINTON POWER STATION, UNIT 1 - NRC SECURITY INSPECTION
REPORT 05000461/2014201 PRELIMINARY GREATER THAN GREEN
Dear Mr. Pacilio:
On June 24, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at
your Clinton Power Station, Unit 1. The inspection covered one or more of the key attributes of
the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection
report documents the inspection results, which were discussed via telephone on June 24, 2014,
with members of your staff.
NRC inspectors examined activities conducted under your license as they relate to security and
compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel.
The attached report documents one finding that has been preliminarily determined to be greater
than Green (i.e., a finding of greater than very low significance) that may result in the need for
further evaluation to determine significance and, therefore, the need for additional NRC action.
The finding was assessed based on the best available information, using the Physical
Protection Significance Determination Process. This deficiency was promptly corrected or
compensated for, and the plant was in compliance with applicable physical protection and
security requirements within the scope of this inspection before the inspectors left the area.
The finding is also an apparent violation of NRC requirements and is being considered for
escalated enforcement action in accordance with the NRCs Enforcement Policy, which can be
found on the NRCs Web site at: http://nrc.gov/reading-rm/doc-collections/enforcement.
The enclosure transmitted herewith contains Safeguard Information. When
separated from the enclosure, this transmittal document is decontrolled.
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION
M. Pacilio -2-
In accordance with the NRC Inspection Manual Chapter (IMC) 0609, Significance
Determination Process, we intend to complete our evaluation using the best available
information and issue our final determination of security significance within 90 days of this letter.
The Significance Determination Process (SDP) encourages an open dialogue between the NRC
staff and the licensee; however, the dialogue should not impact the timeliness of the staffs final
determination.
Before we make our final significance determination, we are providing you with an opportunity to
(1) attend a regulatory conference where you can present to the NRC your perspective on the
facts and assumptions the NRC used to arrive at the finding and assess its significance; or
(2) submit your position on the finding to the NRC in writing. If you request a regulatory
conference, it should be held within 30 days of the receipt of this letter, and we encourage you
to submit supporting documentation at least 1 week prior to the conference in an effort to make
the conference more efficient and effective. In the interest of protecting sensitive
security-related information, if a regulatory conference is held, it will not be open for public
observation. If you decide to submit only a written response, such a submittal should be sent to
the NRC within 30 days of your receipt of this letter. If you decline to request a regulatory
conference or submit a written response, you relinquish your right to appeal the final SDP
determination, in that by not doing either, you fail to meet the appeal requirements stated in the
prerequisite and limitation sections of Attachment 2 of IMC 0609.
Please contact Mr. Robert C. Johnson at (301) 287-3688, and in writing, within 10 days from the
issue date of this letter to notify the NRC of your intentions. If we have not heard from you
within 10 days, we will continue with our significance determination and enforcement decision.
The final resolution of this matter will be conveyed in a separate correspondence.
Because the NRC has not made a final determination in this matter, no notice of violation is
being issued for these inspection findings at this time. In addition, please be advised that the
number and characterization of the apparent violation(s) may change as a result of further NRC
review.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of the
NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
However, the material enclosed herewith contains safeguards information as defined by
10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the
Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be
made available electronically for public inspection in the NRC Public Document Room or from
the PARS component of NRCs ADAMS. If you choose to provide a response and safeguards
information is necessary to provide an acceptable response, please provide the level of
protection described in 10 CFR 73.21. Otherwise, if security-related information is necessary to
provide an acceptable response, please mark your entire response Security-Related
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION
M. Pacilio -3-
Information - Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with
10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In
accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your
response.
Sincerely,
/RA/
Michael Layton, Acting Director
Division of Security Operations
Office of Nuclear Security and Incident Response
Docket No. 50-461
License No. NPF-62
Nonpublic Enclosure: Inspection Report 05000461/2014201
w/Attachments: Supplemental Information
cc w/encl: B. K. Taber, Site Vice President
B. Brooks, Security Manager
SAFEGUARDS INFORMATION
ML14196A313
OFFICE NSIR/DSO NSIR/DSO NSIR/DSO RIII NSIR/DSO NSIR/DSO/SPEB
NAME Robert Dexter J. Curry Ken Brooks R. Skokowski C. Johnson A. Pretzello for/M.
Layton
DATE 7/1/14 7/17/14 7/16/14 7/25/14 7/25/14 7/29/14