UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 July 29, 2014 Mr. Edward D. Halpin, Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON NUCLEAR POWER PLANT - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000275/2014301; 05000323/2014301
Dear Mr. Halpin:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Diablo Canyon Nuclear Power Plant.
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Ron Fortier, NRC Examination Lead. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examination in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, on August 8, 2014. The NRC staff will administer the operating tests during the week of August 11, 2014. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (817) 200-1159.
Please contact your Chief Examiner, Chris Steely, at (817) 200-1432, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,
/RA/
Vincent Gaddy, Chief Operations Branch Division of Reactor Safety
Pacific Gas and Electric Company Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82
Enclosure:
ES-201-4 cc w/enclosure:
Ron Fortier NRC Examination Lead Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 cc w/o enclosure:
Distribution via ListServ for Diablo Canyon
Pacific Gas and Electric Company Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hipschman@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov)
Project Engineer, DRP/A (Brian.Cummings@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Peter.Bamford@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
Branch Chief, DRS/OB (Vincent.Gaddy@nrc.gov)
X SUNSI Review ADAMS X Publicly Available X Non-Sensitive Keyword:
By: lah X Yes Non-Publicly Available Sensitive NRR-079 OFFICE RIV/DRS/OB SOE:OB C:OB NAME LAHurley CSteely VGaddy SIGNATURE /RA/ /RA/ /RA/
DATE 07/28/14 07/29/14 07/29/14 OFFICIAL RECORD COPY