Notification of Inspection (NRC Integrated Inspection Report 05000458/2014005) and Request for Information
ML14206A907
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/24/2014
From: Vincent Gaddy
Operations Branch IV
To: Olson E
Entergy Operations
T. Farina
References
IR-14-005
Download: ML14206A907 (8)


See also: IR 05000458/2014005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

July 24, 2014

Mr. Eric W. Olson, Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - NOTIFICATION OF INSPECTION (NRC

INTEGRATED INSPECTION REPORT 05000458/2014005) AND REQUEST

FOR INFORMATION

Dear Mr. Olson:

From September 15 through 19, 2014, inspectors from the NRCs Region IV office will perform

the baseline biennial requalification inspection at River Bend Station using NRC Inspection

Procedure 71111.11B, Licensed Operator Requalification Program. Experience has shown

that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.

In order to minimize the impact to your onsite resources and to ensure a productive inspection,

we have enclosed a request for documents needed for this inspection. These documents have

been divided into three groups. The first group (Section A of the enclosure) identifies

information to be provided prior to the inspection to ensure that the inspectors are adequately

prepared. The second group (Section B of the enclosure) identifies the information the

inspectors will need upon arrival at the site. The third group (Section C of the enclosure)

identifies the items which are necessary to close out the inspection and are usually sent a few

weeks after the team has left the site. It is important that all of these documents are up to date

and complete in order to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. John Hedgepeth of your training

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities. If there are any questions about this inspection or the material

requested, please contact Thomas Farina, lead inspector, at 817-200-1117

(thomas.farina@nrc.gov).

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

E. Olson

- 2 -

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-458

License: NPF-47

Enclosure:

Biennial Requalification Inspection Document Request

Electronic Distribution to River Bend Station

Enclosure

BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

From: Thomas Farina, Operations Engineer

NRC RIV

817-200-1117

To:

John Hedgepeth, Senior Operations Instructor

River Bend Station

225-378-3523

Subj: Information Request to Support September 15, 2014 to September 19, 2014, Licensed

Operator Requalification Program Inspection (IP 71111.11B)

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or

hardcopy in order to arrive at the Region IV office no later than September 5, 2014.

Electronically to: Thomas.Farina@nrc.gov

Chris.Steely@nrc.gov

Michael.Kennard@nrc.gov

Hardcopy to: US Nuclear Regulatory Commission, Region IV

1600 E. Lamar Blvd

Arlington, TX l76011

ATTN: Thomas Farina

General Requests:

Index of the materials provided in response to this request

List of licensed operators (SRO & RO) by crew (operating & staff)

Training and Operations Department organization charts (with qualified LOR

evaluators identified)

Procedures that identify process for revising and maintaining LO continuing

training program up to date

List of outstanding LOR program changes

List of plant events and industry operating experience incorporated into LOR

program since last BRQ

Audits and/or self-assessment reports addressing the licensed operator

requalification training program

Last two years of Simulator Review Committee (or equivalent) meeting minutes

Last two years of Curriculum Review Committee (or equivalent) meeting minutes

02.03: Biennial Requalification Written Examination Quality

The current and approved biennial written examination schedule

The current requalification cycle written examination results for both SRO & RO

that have already been administered up to the week prior to the inspection team

arrival onsite, if any

All written examinations that have been approved for administration up to and

including the week before the inspection team is onsite, if any. This will need to

- 2 -

have adequate password protection if e-mailed or double envelope protection if

mailed via regular mail per NUREG-1021

The current requalification cycle examination methodology (sample plan)

02.04: Annual Requalification Operating Test Quality

The schedule for the operating tests (JPMs & scenarios) to be given the week of

September 15, 2014

The operating tests (JPMs & scenarios) (password protected and provide

separately via telephone at later date) to be given the week of September 15,

2014

Current requalification cycle operating tests (SRO & RO) and results up to the

week prior to the inspection team arrival onsite

All of the previous years NRC required annual operating tests

Current requalification cycle operating test methodology (sample plan)

All portions of the UFSAR that identify operator response times for time critical

operator actions

A list of station-specific Critical Tasks used to develop dynamic scenarios, if

applicable

02.05: Licensee Admin of Requalification Exams

All procedures used to administer the annual operating test

All procedures used to assess operator performance

All procedures that describe conduct of simulator training

All procedures used to test, operate, and maintain the simulator

An index for referencing the above procedures

02.06: Requalification Examination Security

Submit any tracking tools that you use as a means to prevent excessive overlap

on the written examinations and also meet the intent of sampling all required

topics on a periodic basis

Submit any tracking tools that you use as a means to prevent excessive overlap

on the operating tests and also meet the intent of sampling all required

malfunctions (including major events, instrument/component malfunctions, TS

calls, etc.) on a periodic basis

All Procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between

examinations in current exam cycle tests and prior year examinations

List of all Condition Reports since the last biennial requalification inspection

related to examination security and overlap

02.07: Licensee Remedial Training Program

List of remedial training conducted or planned since last requalification exams

(includes training provided to operators to enable passing requalification exams

and training provided to correct generic or individual weaknesses observed

during previous requalification exam cycle)

Remediation plans (lesson plans, reference materials, and attendance

documentation)

- 3 -

02.08: Conformance with Operator License Conditions

All Procedures and Program documentation for maintaining active operator

licenses, tracking training attendance, and ensuring medical fitness of licensed

operators

All Procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection

List of licensed operators whose licenses were reactivated since the last BRQ

inspection.

02.09: Simulator Performance

All Simulator Management and Configuration Procedures if not already provided

for section 02.05 above.

Simulator Discrepancy Report (DR) summary list for all open DRs. For closed

DRs, summary list for those items closed between August 11, 2012, and

September 14, 2014

02.10: Problem Identification and Resolution

A summary report of all condition reports related to operator actions/errors in the

control room

Any revised requalification training that was based on licensed operator

performance issues

B. The following information is requested in order to support the onsite inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on September 15, 2014.

02.02: Exam Results - 02.03 and 02.04: Written Exam and Op Test Quality

All approved Operating Tests (JPMs & scenarios) not previously submitted

All results up to the day the team leaves the site

02.08: Conformance with Operator License Conditions

Access to licensed operators records (operating and staff crews)

Access to licensed operators training attendance records

Access to licensed operators medical records

02.09: Simulator Performance

Simulator discrepancies DRs from August 11, 2012, to September 14, 2014

This should include all open DRs and DRs that have been closed, including the

documentation/justification for closure

Acceptance test documentation, including hardware and software model

revisions at the time of acceptance (as available)

Documentation that validates current models, including the thermal-hydraulics

and neutronics models, to the actual plant

All current model deficiencies, including FSAR vs. Design differences in the

simulator (any documentation on this)

Summary list of modifications from August 11, 2012, to September 14, 2014

Plant Modifications (both hardware and software) completed on the Simulator by

due date from August 11, 2012, to September 14, 2014

- 4 -

Simulator Differences lesson plan used in training (current to September 14,

2014)

The complete book of all Simulator annual performance test packages (usually in

a single book, but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also

include the test procedures for each test, the acceptance criteria, and results.

For each transient test, the reference chart should be included or an equivalent

subject matter expert review versus the simulator results with a write-up for any

differences beyond the ANSI 3.5 standard requirements

All test packages used to verify core physics parameters (such as MTC, IRW).

The applicable reference graphs from the plant physics data book (electronic or

other means as available) should also be included as well as the test procedures

used and the acceptance criteria with results

All Simulator test, configuration management, and related documents available in

the room for inspectors to review. This includes training needs analysis

packages, simulator review committee meeting minutes, etc.

Current copy of ANSI 3.5 standard you are committed to for Simulator testing

02.10: Problem Identification and Resolution

All condition reports related to operator actions/errors in the control room

C. River Bend Station is required to send the final results summary and any remaining

exams and operating tests that have not been reviewed to the regional office lead

inspectors for final review and comparison against the Significance Determination

Tools in order to communicate the exit results for the inspection.

ML14206A907

SUNSI Review

By: TJF

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

NRC-002

OFFICE

OE:OB

C:OB

NAME

TFarina

VGaddy

SIGNATURE

/RA/

/RA/

DATE

7/23/14

7/24/14

Letter for Eric Olson from Vincent Gaddy, dated July 24, 2014

SUBJECT: RIVER BEND STATION - NOTIFICATION OF INSPECTION (NRC INTEGRATED

INSPECTION REPORT 05000458/2014005) AND REQUEST FOR INFORMATION

Distribution

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Branch Chief, DRP/C (Don.Allen@nrc.gov)

Senior Project Engineer (Ray.Azua@nrc.gov)

Project Engineer (Paul.Nizov@nrc.gov)

Project Engineer (Michael.Langelier@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)