IPRenewal NPEmails From: Green, Kimberly Sent: Monday, July 21, 2014 11:49 AM To: Waters, Roger M. (rwater1@entergy.com)

Cc: IPRenewal NPEmails

Subject:

Draft telecon summary for 6/19 ad 7/16 Attachments: Telecon Summary 06-19-2014 Clarification on RAI 11-C Response.docx

Roger, Attached is a draft telecon summary for the calls held on 6/19 and 7/16. Please let me know if any corrections are needed.
Thanks, Kim 1

Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 4552 Mail Envelope Properties (F5A4366DF596BF458646C9D433EA37D7016958D1D9FE)

Subject:

Draft telecon summary for 6/19 ad 7/16 Sent Date: 7/21/2014 11:49:13 AM Received Date: 7/21/2014 11:49:11 AM From: Green, Kimberly Created By: Kimberly.Green@nrc.gov Recipients:

"IPRenewal NPEmails" <IPRenewal.NPEmails@nrc.gov>

Tracking Status: None "Waters, Roger M. (rwater1@entergy.com)" <rwater1@entergy.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 173 7/21/2014 11:49:11 AM Telecon Summary 06-19-2014 Clarification on RAI 11-C Response.docx 86256 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF CONFERENCE CALLS HELD ON JUNE 19 AND JULY 16, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., ENTERGYS RESPONSE TO A REQUEST FOR ADDITIONAL INFORMATION ON APPLICANT/LICENSEE ACTION ITEM 7 FROM MRP-227-A Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant) held conference calls on June 19 and July 16, 2014, to obtain clarification on Entergys June 9, 2014 response regarding applicant/licensee action item 7. A list of the participants is enclosed.

By letter dated June 9, 2014, Entergy responded to RAI 11-C, which requested that Entergy modify its Reactor Vessel Internals Inspection Plan to provide a link to a primary component that is an appropriate predictor of irradiation embrittlement and irradiation-assisted stress corrosion cracking (IASCC). In its response, Entergy stated that it has selected the lower core plate as a leading indicator of degradation for the column caps with regard to the embrittlement and IASCC mechanisms. Entergy will inspect the lower core plate using the VT-3 inspection method.

During the call on June 19, 2014, the staff stated that it needed clarification on the inspection method proposed and how it is capable of detecting cracking (small indications). The staff believes that an enhanced visual inspection (i.e., EVT-1) is the appropriate technique for detecting small indications.

Entergy requested time to consider the staffs statements and a second phone call.

During the phone call on July 16, 2014, Entergy stated that it plans to change the primary component from the lower core plate to the control rod guide tube lower flange welds and the core barrel cylinder girth welds. Entergy plans to submit a revised response in the near future.

The staff requested that, in its revised response, Entergy provide sufficient justification for the selection of the primary component as a leading indicator for the lower support column bodies, the acceptance criteria, and the timing of any required expansion inspections.

The applicant had an opportunity to comment on this summary.

Kimberly J. Green, Sr. Mechanical Engineer Aging Management of Plant Systems Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

List of Participants cc w/encl: Listserv

LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF CONFERENCE CALLS HELD ON JUNE 19 AND JULY 16, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., ENTERGYS RESPONSE TO A REQUEST FOR ADDITIONAL INFORMATION ON APPLICANT/LICENSEE ACTION ITEM 7 FROM MRP-227-A Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant) held conference calls on June 19 and July 16, 2014, to obtain clarification on Entergys June 9, 2014 response regarding applicant/licensee action item 7. A list of the participants is enclosed.

By letter dated June 9, 2014, Entergy responded to RAI 11-C, which requested that Entergy modify its Reactor Vessel Internals Inspection Plan to provide a link to a primary component that is an appropriate predictor of irradiation embrittlement and irradiation-assisted stress corrosion cracking (IASCC). In its response, Entergy stated that it has selected the lower core plate as a leading indicator of degradation for the column caps with regard to the embrittlement and IASCC mechanisms. Entergy will inspect the lower core plate using the VT-3 inspection method.

During the call on June 19, 2014, the staff stated that it needed clarification on the inspection method proposed and how it is capable of detecting cracking (small indications). The staff believes that an enhanced visual inspection (i.e., EVT-1) is the appropriate technique for detecting small indications.

Entergy requested time to consider the staffs statements and a second phone call.

During the phone call on July 16, 2014, Entergy stated that it plans to change the primary component from the lower core plate to the control rod guide tube lower flange welds and the core barrel cylinder girth welds. Entergy plans to submit a revised response in the near future.

  • concurrence via e-mail OFFICE LA: DLR/RPB1* PM: DLR/RAPB BC: RPB1:DLR LA: DLR/RPB1 PM: DLR/RAPB NAME KGreen YDiaz KGreen DATE

SUBJECT:

SUMMARY

OF CONFERENCE CALLS HELD ON JUNE 19 AND JULY 16, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., ENTERGYS RESPONSE TO A REQUEST FOR ADDITIONAL INFORMATION ON APPLICANT/LICENSEE ACTION ITEM 7 FROM MRP-227-A DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDeEvib Resource RidsRgn1MailCenter RidsNrrPMIndianPoint RidsOgcMailCenter Resource YDiaz MGray, RI KGreen ABurritt, RI JPoehler DonaldJackson, RI SRosenberg MModes, RI AHiser NSheehan, RI OPA AustinYoung DScrenci, RI OPA GCheruvenki DTifft, RI STurk, OGC NMcNamara, RI BMizuno, OGC GNewman, RI DRoth, OGC JSStewart, RI BHarris, OGC AmiPatel, RI SBurnell, OPA DMcIntyre, OPA EDacus, OCA

TELEPHONE CONFERENCE CALLS INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JUNE 19 AND JULY 16, 2014 PARTICIPANTS: AFFILIATION:

Kim Green U.S. Nuclear Regulatory Commission (NRC)

Allen Hiser NRC Stacey Rosenberg NRC Jeff Poehler NRC Austin Young NRC Ganesh Cheruvenki** NRC Roger Waters Entergy Nuclear Operations, Inc. (Entergy)

Robert Dolansky Entergy Nelson Azevedo Entergy Charlie Caputo Entergy John Curry Entergy Ted Ivy** Entergy Randy Lott Westinghouse Cheryl Boggess Westinghouse Bradford Grimmel Westinghouse Dave Radonovich* Westinghouse

  • June 19, 2014 call only